Rialto, California ADUs and SB 9: The 2020 ADU Rules, State Law Overrides, Pre-Selected Plans and Two-Unit Projects

An accessory dwelling unit (ADU) is a second, smaller home on the same lot as a house or apartment building, with its own kitchen and bathroom. A junior ADU (JADU) is a unit of 500 square feet or less inside a house. SB 9 is the 2021 state law that allows two main homes on a single-family lot. Rialto's ADU rules date from 2020, and state ADU law has changed several times since, so on several points the statute now decides what a Rialto owner may build. This page sets out the City's text, where the state rule controls, the City's pre-selected ADU plans and the City's SB 9 chapter. The Rialto overview has the summary.

Rialto ADUs and SB 9 in six facts

Rialto's ADU Section

Section 18.10.070 was added by Ordinance No. 1641 on July 14, 2020, and Supplement 39 shows no later amendment. It still cites "Government Code Section 65852.2 et seq." The state ADU rules now sit in Government Code Section 66314 and the sections that follow it; SB 477 added several of them, such as Sections 66315 and 66322, in 2024. The section makes ADUs "a permitted use on all lots in single-family and multi-family residential zones." An ADU may be attached, inside the house or an attached garage, or detached, and must be on the same lot as the house.

  • Approval. An application goes to the Community Development Department and "must be ministerially approved or denied within sixty days, without a hearing," once complete. Ministerial means staff check fixed written rules and have no discretion to say no for other reasons. Government Code 66317 adds that a complete application not acted on in 60 days "shall be deemed approved."
  • Size. No more than 50 percent of the house or 850 square feet, "whichever is more," or 1,000 square feet with more than one bedroom, and never more than 1,200 square feet. A converted building may grow by up to 150 square feet for entry and exit.
  • Setbacks and coverage. Four feet from side and rear lines. If lot coverage would block an ADU of at least 800 square feet, an ADU of up to 800 square feet is still allowed.
  • Location and entry. An ADU must sit behind or beside the house unless the Director agrees only a front site works. An attached ADU needs its own outside door, "not located on the front elevation." No new driveway from the street is allowed.
  • Garage conversions. The garage door must be removed and replaced with windows, a door or other treatment that matches the house. Lost garage spaces need not be replaced.
  • Rentals and sale. Rentals must be longer than thirty days. The ADU "shall not be sold separately from the primary unit."
  • Utilities. A new ADU, other than a conversion, "shall be metered separately from the primary unit for gas, electricity, and water/sewer services."

Where State ADU Law Now Controls

A city ADU rule that is stricter than state law is void to that extent, because state law sets the minimum a city must allow. Government Code 66322 applies "whether or not the local agency has adopted an ordinance." The table compares Rialto's 2020 text with the statutes in force in 2026.

Rule Rialto Sec. 18.10.070 State law Controls
ADUs on a house lot One ADU and one JADU A converted ADU, a detached ADU of up to 800 sq ft and a JADU, in any combination State
ADUs on an existing apartment lot One attached ADU per four homes; two detached At least one, up to 25 percent of existing homes, in unused space; up to eight detached, no more than the existing homes State
Detached ADU height 16 ft or one story, whichever is less At least 16 ft; 18 ft within one-half mile of major transit, plus 2 ft for a matching roof pitch State
Attached ADU height 16 ft or one story 25 ft or the zone height for the house, whichever is lower State
Owner living on site, JADU Required for every JADU Only when the JADU shares a bathroom with the house State
Impact fees None under 750 sq ft None at 750 sq ft or less; JADU none at 500 sq ft or less State
Parking exemptions Five listed cases Six cases, adding an ADU applied for with a new house or apartment building State

Sources: Rialto Municipal Code Sec. 18.10.070 (Supplement 39); Gov. Code 66323, 66321, 66333, 66311.5 and 66322.

  • Number of ADUs. Section 18.10.070 says "No more than one accessory dwelling unit and one junior accessory dwelling unit are allowed on any lot with an existing or proposed single-family residence." Government Code 66323(a) requires a city to approve "any combination" of a converted ADU and JADU, and "One detached, new construction, accessory dwelling unit" of up to 800 square feet with four-foot setbacks.
  • Apartment lots. The code allows one attached ADU "for every four dwelling units" and two detached ADUs. The statute requires at least one ADU and up to 25 percent of the existing homes in unused space, and "not more than eight detached accessory dwelling units" that do not outnumber the existing homes.
  • Height. The code's limit of "sixteen feet or one story, whichever is less" is lower than Government Code 66321(b)(4) for an attached ADU (25 feet or the zone limit) and for a detached ADU near a major transit stop (18 feet). Public Resources Code 21064.3 counts "An existing rail or bus rapid transit station" as a major transit stop, and the Housing Element places "the Rialto Metrolink Station" next to its Central Area housing sites.
  • Design. Section 18.10.070 requires an ADU "architecturally compatible with the primary structure and structures in the immediate neighborhood." Government Code 66314(b)(1) allows "objective standards," meaning standards that involve no personal judgment, so a design rule must be measurable to apply.
  • Junior ADU owner rule. The code requires owner occupancy "In the case of a junior accessory dwelling unit." Government Code 66333(b) allows that rule only if the JADU shares sanitation with the house: "Owner-occupancy shall not be required if the junior accessory dwelling unit has separate sanitation facilities."
  • Fees. The code bars impact fees on an ADU "under seven hundred fifty square feet." Government Code 66311.5(c) bars them for an ADU of "750 square feet of interior livable space or less," so an ADU of exactly 750 square feet pays none.

The Pre-Selected ADU Plans and the Permit Steps

The City's Accessory Dwelling Units page offers two methods: the "Pre-Selected ADU Plans Program" or a custom design by an architect or designer. The program lists eleven plans "from other municipalities," from ADU1 (499 square feet, one bedroom, Santa Ana) to ADU11 (1,200 square feet, three bedrooms, Riverside), with others from Menifee, Chino and Temecula. "The designer of the plans is Design Path Studios," and owners contact that firm for approval to use them. The Housing Element calls them "11 pre-approved ADU plans" and says the program streamlines review.

  • Step 1, Planning. Email [email protected] a site and utility plan, the plans, a building permit application, a hold harmless agreement and the checklist. "The City of Rialto will require a new address for each unit on a property," and Planning contacts the owner "within five business days." The address letter has "Currently no fee."
  • Step 2, Building and Safety. Submit the address letter, plans, Title 24 energy forms, a solar plan and fire sprinkler plans if needed to [email protected].
  • Fees. "School fee letter is required regardless of square footage," and the school district "Typically" charges ADUs of 500 square feet or more. The page lists three school districts: Colton Joint Unified, Fontana Unified and Rialto Unified. The page says "All new ADU's constructed at the same time as a new dwelling must pay DIF fees," meaning development impact fees.

The Housing Element (Program 2D) says the City "adopted an Accessory Dwelling Unit Ordinance in 2020" and "will support and accommodate the construction of at least 128 ADUs." It also says "ADUs go directly to the Building Division for permits." Economic Development Committee agendas for August 28, September 18 and October 30, 2025 listed an "Amendment to the Accessory Dwelling Unit (ADU) Ordinance" with a revised draft. No adopted amendment appears in the City Council records read through October 2026.

SB 9 Two-Unit Projects (Chapter 18.113)

Chapter 18.113, adopted by Ordinance No. 1665 on February 8, 2022, defines a "two-unit project" as "the development of two primary dwelling units, or if there is already a primary dwelling unit on the lot, the development of a second primary dwelling unit." It applies in "a zone where the only residential use that is allowed as a primary use is a single residential dwelling on a lot," which covers the R-1 zones. The applicant must first obtain "a certificate of compliance with the Subdivision Map Act," a document showing the lot was legally created. The City reports any missing items within thirty days.

Rule Rialto Chapter 18.113
Size of each new home 500 to 800 sq ft; an existing house over 800 sq ft may not be expanded
Height on a lot over 2,000 sq ft One story and 16 ft
Height on a lot under 2,000 sq ft Two stories and 22 ft, upper floor stepped back 5 ft
Side and rear setbacks Zone setbacks, reduced as needed for two 800 sq ft homes, never under 4 ft
Parking One space per new home in an enclosed garage 10 by 20 ft, unless near frequent transit or car share
Windows within 30 ft of a side or rear line High windows (glass 6 ft above the floor) or frosted glass
Landscape screen One 15-gallon plant per 5 ft of wall, at least 6 ft tall, or a 6 ft fence
Demolition No more than 25 percent of exterior walls unless no tenant for three years

Source: Rialto Municipal Code Sec. 18.113.050 (Supplement 39).

  • Approval. The Community Development Director approves or denies "ministerially," and the approval takes effect only after the deed restriction (a recorded limit on how the property may be used) and easements are recorded. The decision "is final and non-appealable."
  • Sites excluded. Prime farmland, wetlands, hazardous waste sites, protected habitat and conservation land are excluded. A very high fire hazard zone, earthquake fault zone, 100-year flood area or floodway is excluded unless the site meets the listed safety conditions. Historic properties are excluded too.
  • Protected housing. No demolition or alteration of rent-restricted homes, or of "Housing that has been occupied by a tenant in the last three years." The owner signs a sworn statement, and the City "may conduct its own inquiries."
  • Units on the lot. A lot not created by an urban lot split may have the two-unit project "plus any ADU or JADU that must be allowed under state law." A lot created by a split may have no more than two units of any kind.
  • Design. New homes must match an existing house in "exterior materials, finishes, color and dominant roof pitch," use down-lights only, and have no window or door with "a direct line of sight to an adjoining residential property."
  • Other conditions. All nonconforming zoning conditions must be corrected. No non-residential use and no rental under thirty days. The owner must notify adjacent owners "At least thirty business days before starting any construction."

Where Chapter 18.113 and the Statute Differ

Government Code 65852.21, as amended effective June 30, 2026, says a city "shall not impose objective zoning standards, objective subdivision standards, and objective design standards that do not apply uniformly to development within the underlying zone," unless they are more permissive. Several Rialto SB 9 rules apply only to SB 9 homes: the 800 square foot cap, the one-story and 16-foot height limit where the R-1 zones allow two and one-half stories and 35 feet, the window and landscape rules and the matching-materials rule. Each of those rules is stricter than what the R-1 zone applies to other houses. The statute also requires a decision "within 60 days from the date the local agency receives a completed application," or the project "shall be deemed approved"; Chapter 18.113 states no deadline. The statute controls on both points. Ask the Planning Division how it applies Chapter 18.113 before you design.

Best For

  • ✓ House lots that can take a converted ADU, a detached ADU of up to 800 square feet and a JADU.
  • ✓ Owners who use one of the 11 pre-selected plans to save design time.
  • ✓ Lots within one-half mile walking distance of the Rialto Metrolink Station, where an 18-foot detached ADU and no ADU parking apply.

Usually Fails When

  • ✕ The house was rented to a tenant in the last three years and the plan uses SB 9.
  • ✕ A design relies on Rialto's 2020 limits where state law now allows more.
  • ✕ The budget leaves out school fees and impact fees on an ADU over 750 square feet.

What To Verify Before Spending Money

  • → Whether the City Council has adopted the revised ADU ordinance.
  • → The walking distance from the lot to a major transit stop.
  • → School district fees for the lot, from the district named on the City ADU page.

Where to Go Next

Related on VanPlex: the Rialto overview, the California ADU law page and the SB 9 page.

Frequently Asked Questions

How many ADUs can I build on a Rialto house lot? +
State law allows more than the Rialto code says. Rialto Section 18.10.070 allows one ADU and one junior ADU per house lot, but Government Code 66323 requires a city to approve a converted ADU, a detached new ADU of up to 800 square feet and a junior ADU in any combination. That can mean three units besides the house.
How tall can a Rialto ADU be? +
Rialto Section 18.10.070 says 16 feet or one story, whichever is less. Government Code 66321 sets higher minimums that control: 18 feet for a detached ADU within one-half mile walking distance of a major transit stop, plus two feet for a matching roof pitch, and up to 25 feet or the house height limit for an attached ADU.
What is the largest ADU allowed in Rialto? +
Rialto Section 18.10.070 caps an ADU at 50 percent of the main house or 850 square feet, whichever is more, or 1,000 square feet with more than one bedroom, and never more than 1,200 square feet. The City's pre-selected plans range from 499 square feet for a one-bedroom plan to 1,200 square feet for a three-bedroom plan.
What are the Rialto pre-selected ADU plans? +
Rialto's Pre-Selected ADU Plans Program lists 11 ADU plans first drawn for Santa Ana, Menifee, Chino, Riverside and Temecula, from 499 to 1,200 square feet. The plans are by Design Path Studios, which an owner contacts for approval to use them. The owner then submits the plans to the Planning Division for an address letter and to Building and Safety.
Does a Rialto ADU need its own parking space? +
Often no. Rialto Section 18.10.070 asks for one space per ADU or per bedroom, whichever is less, but none when the ADU is within one-half mile walking distance of public transit, is inside the existing house or an accessory building, or is near a car share vehicle. A converted garage need not be replaced.
Do I have to live on the property to rent out a Rialto ADU? +
Not for an ADU. Rialto Section 18.10.070 says owner occupancy is not required for the house or the ADU, and any rental must be longer than thirty days. The code requires the owner to live in the house or the junior ADU, but Government Code 66333 limits that rule to a junior ADU that shares a bathroom with the house.
Does a Rialto ADU pay impact fees? +
Not when it is 750 square feet or smaller. Government Code 66311.5 bars impact fees on an ADU of 750 square feet or less and a junior ADU of 500 or less, and larger ADUs pay fees in proportion to the main house. The Rialto ADU page says a school fee letter is needed for every ADU, and districts typically charge ADUs of 500 square feet or more.
What is an SB 9 two-unit project in Rialto? +
A Rialto two-unit project, under Chapter 18.113, is two main homes on one lot in a single-family zone, or a second main home next to an existing house. The Community Development Director approves it with no hearing if it meets the chapter. Each new home must be 500 to 800 square feet, and a recorded deed restriction must bar short-term rentals.
Can I build a two-story SB 9 home in Rialto? +
Only on a small lot under the Rialto code. Section 18.113.050 limits a new SB 9 home to one story and 16 feet on a lot over 2,000 square feet, and two stories and 22 feet on a smaller lot. Government Code 65852.21 bars standards that do not apply to all development in the zone, and the R-1 zones allow 35 feet.
Do I have to tell my neighbors before building SB 9 homes in Rialto? +
Yes. Rialto Section 18.113.050 requires the owner to give written notice to the owners of each adjacent residential parcel at least thirty business days before construction starts, with the start and end dates, the hours of work and contact details for the project manager and the Building and Safety Division. The notice gives neighbors no right to comment.
Is Rialto updating its ADU ordinance? +
Rialto Economic Development Committee agendas for August 28, September 18 and October 30, 2025 listed an item titled Amendment to the Accessory Dwelling Unit (ADU) Ordinance, with a revised draft attached. No City Council ordinance amending Section 18.10.070 appears in the Council records read through October 2026, so the statutes apply wherever they allow more than the 2020 text.

Official sources (checked October 2026)

Rialto Municipal Code, Section 18.10.070, accessory dwelling units
https://library.municode.com/ca/rialto/codes/code_of_ordinances?nodeId=TIT18ZO_CH18.10SIFAZO_18.10.070ACDWUN
Rialto Municipal Code, Section 18.10.020, R-1 permitted uses
https://library.municode.com/ca/rialto/codes/code_of_ordinances?nodeId=TIT18ZO_CH18.10SIFAZO_18.10.020PEUS
Rialto Municipal Code, Section 18.113.040, two-unit project approval
https://library.municode.com/ca/rialto/codes/code_of_ordinances?nodeId=TIT18ZO_CH18.113SIMITITPR_18.113.040AP
Rialto Municipal Code, Section 18.113.050, two-unit project requirements
https://library.municode.com/ca/rialto/codes/code_of_ordinances?nodeId=TIT18ZO_CH18.113SIMITITPR_18.113.050RE
Rialto Municipal Code, Section 18.58.060, residential parking
https://library.municode.com/ca/rialto/codes/code_of_ordinances?nodeId=TIT18ZO_CH18.58OREPA_18.58.060REPARE
City of Rialto, Accessory Dwelling Units page
https://www.rialtoca.gov/887/Accessory-Dwelling-Units
City of Rialto, 2021-2029 Housing Element, March 26, 2026 (PDF)
https://www.rialtoca.gov/DocumentCenter/View/8507/City-of-Rialto-6th-Cycle-Housing-Element_03262026
City of Rialto, Development Impact Fee Schedule (PDF)
https://www.rialtoca.gov/DocumentCenter/View/8931/Development-Impact-Fee-Schedule
City of Rialto, Economic Development Committee agenda, August 28, 2025 (PDF)
https://legistar.granicus.com/Rialto/meetings/2025/8/3262_A_Economic_Development_Committee_25-08-28_Regular_Meeting.pdf
City of Rialto, Economic Development Committee agenda, October 30, 2025 (PDF)
https://legistar.granicus.com/Rialto/meetings/2025/10/3300_A_Economic_Development_Committee_25-10-30_Regular_Meeting.pdf
Government Code 66314 (ADU ordinances)
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV&sectionNum=66314
Government Code 66321 (ADU size and height)
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV&sectionNum=66321
Government Code 66322 (ADU parking)
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV&sectionNum=66322
Government Code 66323 (ADUs a city must approve)
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV&sectionNum=66323
Government Code 66317 (60-day ADU decisions)
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV&sectionNum=66317
Government Code 66311.5 (ADU fees)
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV&sectionNum=66311.5
Government Code 66333 (junior ADUs)
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV&sectionNum=66333
Government Code 65852.21 (SB 9 two-unit projects)
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV&sectionNum=65852.21
Public Resources Code 21064.3 (major transit stop)
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=PRC&sectionNum=21064.3
General information, not legal advice. California housing law changes every year, and each city adds its own rules on top of state law. Confirm current requirements with the city or county planning department, and with a California-licensed attorney or architect, before you buy land or file plans.

Planning a multiplex in Rialto?

VanPlex builds multiplexes in British Columbia, Canada. For a lot in Rialto, our team makes a custom proforma by hand and emails it to you in 24 to 48 hours.

Get a proforma for your address