Live from the City permit register
Is a new multiplex being built on this Toronto address?
Search 743 Toronto addresses with a new multiplex building permit application filed since January 2024. Not every one has been issued: the status of each is on its own page. Ground-up builds only, including demolish-and-rebuild. Houses converted into multiplexes, added basement suites and laneway suites are left out, because they are not new multiplex buildings.
743 Toronto addresses with a multiplex permit filing since 2024.
Each pin is one permit filing at the address the City has on record for it. Shape and colour are the number of new homes the permit says it adds, which is not the same as homes in the finished building: a house converting to a duplex adds one and ends up with two. Grey circles are the 0 filings where the City left the figure blank, usually plumbing, drain and heating permits. The map opens on the newest application year.
Filed most recently
The 60 newest of 850 filings
- 38 Flaremore Cres North York · Aug 25, 2026 · 2 units
- 26 Ancona St North York · Aug 25, 2026 · 4 units
- 44 Portsdown Rd Scarborough · Aug 21, 2026 · 1 units
- 12 Queen Marys Dr Etobicoke · Aug 18, 2026 · 2 units
- 571 Oakwood Ave York · Aug 18, 2026 · 6 units
- 11 Northcote Ave Old Toronto · Aug 18, 2026 · 4 units
- 57 Lytton Blvd Old Toronto · Aug 18, 2026 · 1 units
- 41 Twin Pauls Cres Scarborough · Aug 17, 2026 · 2 units
- 15 Burlingame Rd Etobicoke · Aug 17, 2026 · 2 units
- 12 Cavell Ave Etobicoke · Aug 17, 2026 · 4 units
- 10 Cavell Ave Etobicoke · Aug 17, 2026 · 4 units
- 84 Kings Park Blvd East York · Aug 17, 2026 · 6 units
- 145 Pendrith St Old Toronto · Aug 14, 2026 · 4 units
- 146 Bannockburn Ave North York · Aug 14, 2026 · 4 units
- 43 Mould Ave York · Aug 12, 2026 · 4 units
- 592 Ridelle Ave York · Aug 12, 2026 · 4 units
- 108 Clovelly Ave York · Aug 12, 2026 · 6 units
- 559 Indian Rd Old Toronto · Aug 11, 2026 · 4 units
- 559 Indian Rd Old Toronto · Aug 11, 2026 · 4 units
- 166 Lytton Blvd Old Toronto · Aug 10, 2026 · 2 units
- 16 Burnham Rd East York · Aug 10, 2026 · 2 units
- 82 Twenty Third St Etobicoke · Aug 10, 2026 · 3 units
- 751 Eglinton Ave E East York · Aug 10, 2026 · 4 units
- 1178 Royal York Rd Etobicoke · Aug 10, 2026 · 6 units
- 109 Regina Ave North York · Aug 10, 2026 · 1 units
- 47 Sandale Gdns North York · Aug 7, 2026 · 2 units
- 193 Holborne Ave East York · Aug 7, 2026 · 2 units
- 70 Roncesvalles Ave Old Toronto · Aug 7, 2026 · 1 units
- 84 Westhampton Dr Etobicoke · Aug 6, 2026 · 4 units
- 231 Hallmark Ave Etobicoke · Aug 5, 2026 · 2 units
- 49 Gladys Rd Scarborough · Aug 4, 2026 · 1 units
- 25 Bond Ave North York · Aug 4, 2026 · 1 units
- 99 Dunelm St Scarborough · Jul 31, 2026 · 4 units
- 123 Galloway Rd Scarborough · Jul 30, 2026 · 4 units
- 139 Christie St Old Toronto · Jul 30, 2026 · 4 units
- 42 Glencrest Blvd East York · Jul 24, 2026 · 6 units
- 40 Cartwright Ave North York · Jul 24, 2026 · 4 units
- 110 Meadowbank Rd Etobicoke · Jul 23, 2026 · 2 units
- 62 Cherrystone Dr North York · Jul 21, 2026 · 4 units
- 16 Faith Ave North York · Jul 21, 2026 · 4 units
- 24 Goodwill Ave North York · Jul 20, 2026 · 4 units
- 209 Faywood Blvd North York · Jul 17, 2026 · 4 units
- 8 Daniels St Etobicoke · Jul 14, 2026 · 1 units
- 214 Sterling Rd Old Toronto · Jul 13, 2026 · 6 units
- 369 Patricia Ave North York · Jul 10, 2026 · 3 units
- 2 Lanbrooke Ave North York · Jul 10, 2026 · 4 units
- 25 Wilson Park Rd Old Toronto · Jul 9, 2026 · 6 units
- 33 Wheatsheaf Cres North York · Jul 9, 2026 · 4 units
- 10 Bryant Ave East York · Jul 7, 2026 · 6 units
- 460 Pharmacy Ave Scarborough · Jul 7, 2026 · 4 units
- 279 Cedarvale Ave East York · Jul 6, 2026 · 6 units
- 219 Glen Park Ave North York · Jul 3, 2026 · 6 units
- 17 Boothroyd Ave Old Toronto · Jul 3, 2026 · 4 units
- 221 Holmes Ave North York · Jun 29, 2026 · 2 units
- 51 Burnhamthorpe Cres Etobicoke · Jun 29, 2026 · 4 units
- 201 Churchill Ave North York · Jun 29, 2026 · 4 units
- 129 Northcliffe Blvd York · Jun 26, 2026 · 4 units
- 2289 Lawrence Ave W Etobicoke · Jun 26, 2026 · 4 units
- 136 Lambton Ave York · Jun 25, 2026 · 4 units
- 163 Audrey Ave Scarborough · Jun 24, 2026 · 3 units
The city-wide picture
Where multiplex permits are being filed
By former municipality
Split by the six former municipalities, taken from the City's address record rather than from postal codes, which straddle the old boundaries.
| Area | Filings | Addresses | Closed | 4-unit filings | Median declared |
|---|---|---|---|---|---|
| Old Toronto | 165 | 143 | 46 | 48 | $1,000,000 |
| North York | 218 | 199 | 54 | 121 | $900,000 |
| York | 92 | 85 | 34 | 60 | $1,000,000 |
| Scarborough | 184 | 141 | 54 | 52 | $800,000 |
| Etobicoke | 128 | 115 | 44 | 70 | $1,000,000 |
| East York | 63 | 60 | 15 | 16 | $1,000,000 |
| All Toronto | 850 | 743 | 247 | 367 | $900,000 |
New homes each permit adds
The City states a figure on 850 of the 850 filings and leaves it blank on 0, mostly on plumbing, drain and heating permits. This counts new homes added, not homes in the finished building: a house converting to a duplex adds one and ends up with two.
Filings by year
By application date. The current year is partial, so it is not comparable to a full year.
By ward
Ward is the City's own value on the address record, using the current 25-ward model. The five busiest are below; open the list for all 24.
| Ward | Filings | Addresses | 5-unit | 6-unit |
|---|---|---|---|---|
| 20Scarborough Southwest | 116 | 86 | 1 | 0 |
| 18Willowdale | 84 | 75 | 0 | 0 |
| 03Etobicoke-Lakeshore | 84 | 78 | 1 | 0 |
| 08Eglinton-Lawrence | 67 | 64 | 1 | 3 |
| 19Beaches-East York | 56 | 44 | 3 | 8 |
Show the remaining 19 wards +
| Ward | Filings | Addresses | 5-unit | 6-unit |
|---|---|---|---|---|
| 09Davenport | 45 | 43 | 2 | 5 |
| 14Toronto-Danforth | 44 | 41 | 2 | 8 |
| 05York South-Weston | 43 | 39 | 0 | 0 |
| 06York Centre | 42 | 38 | 0 | 0 |
| 12Toronto-St. Paul's | 35 | 30 | 1 | 3 |
| 15Don Valley West | 25 | 24 | 0 | 0 |
| 11University-Rosedale | 24 | 21 | 1 | 0 |
| 21Scarborough Centre | 24 | 18 | 0 | 0 |
| 04Parkdale-High Park | 23 | 22 | 0 | 6 |
| 02Etobicoke Centre | 23 | 17 | 0 | 1 |
| 01Etobicoke North | 21 | 20 | 0 | 0 |
| 25Scarborough-Rouge Park | 17 | 15 | 0 | 0 |
| 16Don Valley East | 16 | 16 | 0 | 0 |
| 07Humber River-Black Creek | 12 | 9 | 0 | 0 |
| 10Spadina-Fort York | 11 | 11 | 1 | 3 |
| 17Don Valley North | 11 | 10 | 0 | 0 |
| 24Scarborough-Guildwood | 11 | 9 | 0 | 0 |
| 22Scarborough-Agincourt | 9 | 7 | 0 | 0 |
| 23Scarborough North | 7 | 6 | 0 | 0 |
Ward permit records
- Ward 20 Scarborough Southwest 116
- Ward 18 Willowdale 84
- Ward 3 Etobicoke-Lakeshore 84
- Ward 8 Eglinton-Lawrence 67
- Ward 19 Beaches-East York 56
- Ward 9 Davenport 45
- Ward 14 Toronto-Danforth 44
- Ward 5 York South-Weston 43
- Ward 6 York Centre 42
- Ward 12 Toronto-St. Paul's 35
Wards below 35 projects do not have a page of their own; their activity is covered on the former-municipality guides.
Questions people ask
Where does this permit data come from? +
Two City of Toronto Open Data datasets: Building Permits - Active Permits and Building Permits - Cleared Permits. Every filing is matched to the City's One Address Repository on the City's own address point ID, which is what supplies the former municipality and the ward. Nothing is geocoded or estimated. Data current as of Aug 27, 2026, 12:40 PM Pacific.
How many new multiplexes has Toronto permitted since 2024? +
850 new multiplex projects at 743 distinct addresses since Jan 1, 2024. Of those, 247 have been closed and 603 are still open. Filings run 245 in 2024, 340 in 2025, 265 in 2026.
Why is the project count higher than the address count? +
Because an owner can file in more than one year on the same lot. 850 projects sit at 743 addresses, so the project count runs 12.6 percent above the number of buildings. Count addresses when you mean buildings and projects when you mean activity.
Which Toronto ward has the most multiplex activity? +
Ward 20 Scarborough Southwest with 116 filings, well ahead of the rest. The quietest are Ward 23 Scarborough North (7), Ward 22 Scarborough-Agincourt (9), Ward 10 Spadina-Fort York (11).
What does the declared construction cost mean? +
It is the construction cost the applicant wrote on the application. It is not a sale price, it is not the final cost of the build, and it does not include the land. Across the 709 projects that state both a value and between two and six new homes, the median is $900,000, with $600,000 at the 25th percentile and $1,200,000 at the 75th.
Are sixplexes actually being built in Toronto? +
37 new-build applications since January 2024 record six or more new homes, and 13 record five. By year, the six-or-more applications run 7 in 2025, 30 in 2026, which tracks the June 2025 by-law rather than predating it. Counts are new homes net of anything demolished, so a sixplex replacing a house records five.
Does this cover every multiplex permit in Toronto? +
No, and it is not meant to. This page counts new multiplex buildings only, using the City's own classification of both the work and the building type. Houses converted into multiplexes, basement suites added to existing houses, laneway and garden suites, additions and interior alterations are all left out, even though they create real homes. A project is also left out when the address identifier on its permit does not point to exactly one address, or points to a different street number than the permit itself states.
How this was built, and what it does not cover
This page counts new multiplex buildings only. A project is included when the City of Toronto classifies the work as a new building AND classifies the building as a two-unit or a three-or-more-unit house, detached or semi-detached. Both of those are the City's own classifications, not our reading of the permit description. Demolishing a house and building a multiplex in its place is included. Converting a house that already stands, adding a basement suite, building a laneway or garden suite, additions, interior alterations and repairs are all left out, which is why this count is much smaller than the total number of permits filed on two-unit and multi-unit houses. One building project usually files several permits, for the structure, the plumbing, the drains and the heating, so permits at the same address in the same year are grouped into one project. Every project is matched to the City's own address record using the address identifier the City puts on the permit. If that identifier does not point to exactly one address, or if it points to a different street number than the permit itself states, the project is left out rather than published at a guessed address. The ward and the former municipality come from that City address record.
- The list covers permits that are still open and permits the City has closed. A permit that appears in both records is counted once.
- Counting starts 1 January 2024. Toronto's multiplex by-law took effect 12 May 2023, so permits filed during the first seven months of the by-law are not in these totals.
- Only new buildings are counted. A house converted into a multiplex, a basement suite added to a house, and a laneway or garden suite are all real missing-middle homes, but they are not new multiplex buildings and are not in these numbers.
- A project is included based on the building type and the type of work the City assigns it. A new multiplex the City filed under a different building type is not counted here, even if its description mentions one.
- A project is left out when the address identifier on the permit points to a different street number than the permit itself states. There is no way to tell which of the two addresses is correct, and naming the wrong house is worse than leaving the project out.
- Declared value is the construction cost the applicant wrote on the application. It is not a sale price, it is not the final cost of the build, and it does not include the land.
- Unit counts are the new homes a permit says it will add. Plumbing, drain and heating permits usually leave that blank, so fewer permits state a unit count than the total number of permits.
- The headline number counts separate building projects, not buildings. 89 of 743 addresses have more than one project on record, which accounts for all 107 of the difference between the 850 projects and the 743 addresses. Of those, 24 filed in more than one calendar year; the rest filed more than once in the same year, usually because the City issued separate permit numbers for separate buildings on one lot.
- Permits are grouped by address and by the year they were filed. Where an owner files for a multiplex and a separate garden suite on the same lot in the same year, both count as one project, using the higher unit count and the higher declared value. This happened at 571 Oakwood Ave, 84 Kings Park Blvd and 108 Clovelly Ave in 2026.
- Wards use Toronto's current 25-ward map, taken from the City's address record. A permit filed before a ward boundary changed is shown under the ward its address sits in today.
Sources
- City of Toronto Open Data, Building Permits - Active Permits · City updated 2026-08-27
- City of Toronto Open Data, Building Permits - Cleared Permits · City updated 2026-08-27
- City of Toronto Open Data, Address Points (Municipal) - Toronto One Address Repository · City updated 2026-08-27
- Application Information Centre · Active Community Planning, Committee of Adjustment and TLAB applications.
- Building Permit Application & Inspection Status · Look up any address. Covers applications up to 10 years old.
Snapshot of the City register taken Aug 27, 2026, 12:40 PM PT, refreshed manually every few months. For anything filed since then, or to confirm a figure, use the City lookups above.
The permits show what others filed. Check what you could file.
This tracker records multiplex permits already filed with the City. PlexCheck Toronto works the other way round: give it an address and it returns the zoning, the unit ceiling and the numbers for a build that has not happened yet.
Free. City-stamped zoning and CMHC survey rents. Takes about 30 seconds.
Dig into the data
Which multiplex type is cheapest to declare, and which one waits longest for a permit.
The six former municipalities on cost, timing and volume.
The larger register that sits outside the multiplex count entirely.
Whether filing is still growing, compared over the same window each year.