Toronto ward permit record

Multiplex builds in Ward 9 Davenport

45 new multiplex building permit applications filed since January 2024, at 43 addresses. That makes Ward 9 the 6th busiest of 24 Toronto wards for new multiplex construction. The ward spans Old Toronto and York.

New multiplex builds in Ward 9 Davenport

45 new multiplex building permit applications have been filed in Ward 9 Davenport since January 2024, at 43 distinct addresses. That is 5.3% of all new multiplex applications in Toronto. The most common size is 4 new homes, on 21 projects.

45
applications filed
$1,000,000
median declared value, 42 projects
71
median days to permit issue, 39 issued
38
permits issued of 45 applications

Where these applications stand

Of 45 applications in Ward 9 Davenport, 38 have an issued permit, 3 are still under review, and 4 were refused, cancelled or abandoned. A filed application is not a permit, so the totals on this page count applications rather than approvals.

Taken from the City's own status value on each permit, not from which dataset it appears in.

New homes each project adds

City recorded 0 1
1 new home 2
2 new homes 4
3 new homes 10
4 new homes 21
5 new homes 2
6 or more new homes 5

Counts new homes added, not homes in the finished building. Demolishing a house and building a fourplex in its place adds three, not four.

Permits filed by year

2024 13
2025 19
2026 13

By application date. The current year is partial, so it is not comparable to a full one.

What builders declared it would cost

Across 42 projects in Ward 9 Davenport that state both a value and between two and six new homes, the declared construction cost runs from $800,000 at the 25th percentile to $1,250,000 at the 75th, with a median of $1,000,000.

This is the figure the applicant wrote on the permit application. It is not a sale price, it is not the final cost of the build, and it does not include the land.

How long the City took to issue

Of the 45 projects in Ward 9 Davenport, 39 have been issued. Those took a median of 71 days from application, with a quarter issued within 49 days and a quarter taking longer than 124. 6 are still waiting and are not in that median.

Application to issue, from the City's own dates. Projects still under review are excluded rather than counted at how long they have waited so far, which would understate the real wait.

Permitted addresses in Ward 9

The 24 most recent of 43 addresses in this ward with a new multiplex permit. Each one has its own page carrying the City's permit description in full.

1 of these address has a planning application on the City's Application Information Centre, where the drawings and planning reports are posted.

Builders named on Ward 9 permits

Taken verbatim from the builder field on the City's permit applications. A name appearing here means the City recorded it on an application, nothing more: it is not a recommendation, and we have no relationship with any of them.

  • ALPHA BRIGHT NORTHCOTE CORPORATION
  • CHIME LHAMO
  • CAYETANO ESPOSITO
  • 1001503510 ONTARIO INC
  • 2520485 ONTARIO INC
  • HALO MULTIPLEX 1 GP SERVICES CORP
  • LAND EXPERTS GROUP LTD
  • MODCITY CONSTRUCTION LTD
  • 10124001 CANADA INC
  • 122 GREENLAW AVE INC
  • MARIA LURDES COITO
  • ANALISA COITO

Questions about Ward 9

How many multiplex applications has Ward 9 had? +

45 new multiplex building permit applications have been filed in Ward 9 Davenport since January 2024, at 43 distinct addresses. That is 5.3 percent of all new multiplex applications in Toronto, ranking it 6 of 24 wards with any activity. Not all of them have been issued; see the status breakdown above.

What does a multiplex cost to build in Ward 9? +

Across the 42 projects in Ward 9 that state a declared construction value, the median is $1,000,000, running from $800,000 at the 25th percentile to $1,250,000 at the 75th. That is the figure the applicant wrote on the permit application. It is not a sale price, it is not the finished cost of the build, and it excludes the land.

How long does a multiplex permit take in Ward 9? +

The City has issued 39 of the 45 projects in Ward 9, taking a median of 71 days from application, against a citywide median of 81 days. 6 are still under review and are not counted in that median.

Which former municipality is Ward 9 in? +

Ward 9 Davenport spans Old Toronto and York. Toronto's 25-ward boundaries do not follow the former municipal boundaries, so a single ward can cross them.

PlexCheck Toronto

Price a lot in Ward 9

Ward 9 is one of the wards where six units are permitted as-of-right, so a lot here can model further than the four-unit city-wide ceiling. PlexCheck stamps the zoning at a specific address, applies the six-unit permission, and prices it against CMHC survey rents.

Free. City-stamped zoning and CMHC survey rents. Takes about 30 seconds.

Run an address in Ward 9

Other Toronto ward records

Wards with fewer than 35 new multiplex projects do not have their own page. Their activity is covered on the former-municipality pages, where there is enough data to say something useful. See the permit tracker for every ward's totals.

Source: City of Toronto Open Data, Building Permits (Active and Cleared), joined to the City's One Address Repository on the City's own address point id. New-build multiplexes only. Data refreshed Aug 27, 2026. VanPlex is a British Columbia builder and does not operate in Toronto.