Salinas | ADUs and SB 9
Salinas ADUs, Junior ADUs and SB 9 Two-Unit Projects
An accessory dwelling unit (ADU) is a second, smaller home on a lot with a house or apartment building, with its own kitchen, bathroom and sleeping area. A junior ADU is a unit of 500 square feet or less built inside a house. SB 9 is the 2021 state law that lets an owner build two main homes on a house lot. Salinas rewrote its rules for all three in the Zoning Code Update Phase 1 ordinance, which the City Council adopted on September 1, 2026 and which is in force from October 1, 2026. This page reads those new sections against state law. See the Salinas overview for the whole guide.
Salinas ADUs and SB 9 in six facts
- A detached ADU may have up to 1,200 square feet of gross floor area and must have at least 150. Source: SMC 37-50.250 (2026)
- A detached ADU may be 16 feet tall, or 18 feet within one-half mile walking distance of a major transit stop. Source: SMC 37-50.250 (2026)
- A complete ADU application must be acted on within 60 days, or it is deemed approved. Source: SMC 37-50.250 (2026)
- Owner occupancy is not required for an ADU, only for a junior ADU that shares a bathroom with the house. Source: SMC 37-50.250 (2026)
- An SB 9 project may put two main homes on an R-L lot, each allowed at 800 square feet with 4 foot side and rear setbacks. Source: SMC 37-50.335 (2026)
- The community development director must approve or deny a complete SB 9 application within 60 days. Source: SMC 37-50.335 (2026)
How the ADU Rules Changed in 2026
Salinas had an ADU section, 37-50.250, from its 2006 Zoning Code, amended by Ordinance No. 2581 in December 2016 and Ordinance No. 2626 in November 2019. Ordinance No. 2693, adopted February 24, 2026, repealed it, and the use tables then said ADUs "shall be permitted pursuant to State ADU law." Supplement 110 of the code, the version on Municode today, still prints Section 37-50.250 as "Reserved."
The Phase 1 ordinance adds a new Section 37-50.250, "Accessory dwelling units." It opens by saying its purpose "is to comply with the requirements of the California Government Code relating to accessory dwelling units" and that "Where a conflict occurs between this section and applicable State law, State law shall prevail." The August 18, 2026 staff report lists ADU rules among the changes "for compliance with State housing law." The ordinance "shall take effect and be in force thirty days from and after its adoption," which puts the start date at October 1, 2026.
The new section sets up two paths. The first is for the ADUs that state law, in Government Code 66323, says a city must approve, with only a few fixed standards. The second is for every other ADU, which must meet the City's size, height and setback standards and the district's "objective development standards, including limits on lot coverage, objective design standards, floor-area ratio, open space, front setbacks, and minimum lot size." Both paths use a building permit "with ministerial planning review," a staff check against fixed rules with no hearing.
ADU Sizes, Heights and Setbacks
| Type | Size | Height | Setbacks |
|---|---|---|---|
| Converted ADU (house lot) | Existing space; up to 150 sq ft added for entry | Within existing space | Enough for fire and safety |
| Detached ADU, state minimum (house lot) | Up to 800 sq ft livable space | 16 ft (18 ft near major transit) | No front setback; 4 ft side and rear |
| Detached ADU, City standards | 150 to 1,200 sq ft gross floor area | 16 ft, plus 2 ft for a matching roof pitch | 4 ft side, street side and rear |
| Attached ADU | 150 sq ft up to 50% of the house, at least 850 or 1,000 sq ft allowed | 2 stories and 25 ft, or the zone limit if lower | 4 ft side, street side and rear |
| Junior ADU | 150 to 500 sq ft inside the house | Inside the house | Inside the house |
| ADUs on apartment lots | Converted: at least 1, up to 25% of the homes; detached: 2 (new) or up to 8 (existing) | 16 ft, or 18 ft beside a multistory building | No front setback; 4 ft side and rear |
Source: Salinas Municipal Code Section 37-50.250 as added by the Phase 1 ordinance, in force October 1, 2026; Government Code 66321 and 66323.
On a lot with a house, the state-law path allows one ADU "within the existing or proposed space of a single-family dwelling or accessory structure," one junior ADU inside the house, and "One detached, new construction accessory dwelling unit that does not exceed eight hundred square feet of livable space." The section says these "may be combined on one lot." A converted accessory structure may grow by "not more than one hundred fifty square feet" for an entrance, and "No minimum setback shall be required in the front yard" for these units.
Under the City standards, "The total floor area of a detached accessory dwelling unit shall not exceed a maximum of one-thousand two-hundred square feet of gross floor area," and every ADU must be at least 150 square feet. A detached ADU may be sixteen feet tall, or eighteen feet "within one-half mile walking distance of a major transit stop or a high-quality transit corridor" or beside a multistory apartment building, and "may be up to two stories" within those heights. Two more feet are allowed for a roof pitch that matches the house. An attached ADU may be "two stories and twenty-five feet or the maximum height specified by the base zone district for the primary dwelling, whichever is lower."
On a lot with apartments, owners may convert space "not used as livable space, including but not limited to storage rooms, boiler rooms, passageways, attics, basements, or garages" into at least one ADU and up to 25 percent of the number of existing apartments. They may also add detached ADUs: "not more than two" with a proposed apartment building, or "not more than eight" with an existing one, never more than the number of existing homes on the lot.
Process, Parking and Other ADU Rules
- Completeness. The City "shall provide written notice of this determination to the applicant no later than fifteen business days after the City receives the application."
- Decision. The City acts within sixty days of a complete application where a home already exists on the lot. If it does not, the application "shall be deemed approved." Denials come with "a full set of comments," and appeals get a written decision within sixty business days.
- Parking. "No parking shall be required" for a state-law ADU. Others need at most "one parking space ... per accessory dwelling unit or per bedroom, whichever is less," with none near public transit, in historic districts, inside the house, where on-street permits are not offered, or near a car share.
- Replacement parking. When a garage or carport is demolished or converted for an ADU, "replacement parking is not required."
- Owner occupancy. "Owner occupancy is not required on a property with an accessory dwelling unit."
- Fire sprinklers. Not required in an ADU if the house does not need them.
- Rentals. ADUs and junior ADUs must be rented "for a term longer than thirty days," and may not be occupied before the City approves occupancy of the main home.
- Sale. An ADU may be sold separately only under Government Code 66341 or as a condominium under 66342.
- Fixing old problems. Until January 1, 2030, the owner of an ADU built before January 1, 2020, among other cases, may ask for a five-year delay in enforcing a building standard that is not a health and safety issue.
Junior ADUs have their own list. A junior ADU must be "within the walls of the primary single-family dwelling, including, but not limited to, an attached garage," between 150 and 500 square feet, one per lot, with an efficiency kitchen and a separate outside entrance. No parking is required. "Owner-occupancy shall be required if a junior accessory dwelling unit shares sanitation facilities with the existing structure," and a deed restriction must be recorded before the building permit.
ADU Fees
Section 37-50.250 says "Impact fees shall not be imposed on an accessory dwelling that is less than seven hundred fifty square feet in floor area, or any junior accessory dwelling unit with five hundred square feet or less of interior floor area," and larger ADUs pay "proportionately to the square footage of the primary dwelling unit." A unit of less than 500 square feet of livable space pays no school fee, citing Education Code 17620. An ADU is not "a new residential use" for water and sewer connection fees unless it is built with a new house.
Chapter 9 of the code still carries older text. Sections 9-44(d), 9-50.80.1(d) and 9-50.95.35 say ADUs "shall be exempt from development impact fees for a period of five years from the effective date of this revision," added by Ordinance No. 2616 of March 19, 2019. Five years from a 2019 revision ran out in 2024, so ask the City whether it still applies any part of that exemption. The permits and fees page lists the 2026-27 impact fee amounts.
SB 9 Two-Unit Projects in the R-L District
| Topic | Rule |
|---|---|
| Where | Only on lots completely within the R-L district |
| Homes | Two main homes, plus two ADUs or one ADU and one JADU without a lot split |
| Size | 800 sq ft per home allowed regardless of coverage, floor area ratio, open space and front yard limits |
| Setbacks | Side and rear: maximum 4 ft; front: R-L rules unless needed for 800 sq ft |
| Parking | 1 space per home; none within one-half mile walking distance of a major transit stop or high-quality transit corridor, or near car share |
| Rentals | At least 31 days; short-term rental prohibited |
| Approval | Administrative permit by the community development director, no notice, 60 days |
Source: Salinas Municipal Code Section 37-50.335 as added by the Phase 1 ordinance; Government Code 65852.21.
The new Section 37-50.335, "SB 9 Units - Two-unit residential developments," carries out Government Code 65852.21 "in the R-L district." The Planning Commission draft of the ordinance defines a two-unit residential development as "a residential development containing no more than two primary dwelling units on a single lot or parcel within a single-family residential zone." The site must be "completely within the R-L district," a legal lot, and clear of the listed exclusions: wetlands, hazardous waste sites, fault zones, 100-year flood zones unless FEMA conditions are met, floodways, protected habitat, conservation easements, historic landmarks and districts, and housing that is rent restricted or was "occupied by a tenant in the last three years."
The homes may take five forms: a new home inside an existing house, inside an existing accessory building or garage, attached to either, detached on the same lot, or "Two newly constructed attached units (duplex) or two detached residential units on a vacant lot." Each home is allowed at "A maximum 800-square-foot" size with "four-foot side and rear setbacks," "notwithstanding limits on lot coverage, floor-area ratio, or requirements for usable open space, front yard and street side yard setbacks, or landscaping." Every unit must be at least seven feet wide in any direction.
Section 37-50.335 bans any "short-term rental" of the new homes or the existing house, requires rental terms that "shall not be less than 31 consecutive days," and says a project "shall not include a request for an exception" through a variance or other discretionary permit. Lots already holding two or more main homes, or any nonresidential use, may not use the section. Each home must face a public street or have permanent access to one, with a covered front entry and a walkway.
Approval is an administrative permit "reviewed and approved ministerially, without any public notice or a public hearing." The community development director "shall either approve or deny the application within 60 days" of a complete application, and the time stops while the applicant revises plans. If no decision comes in the time state law requires, "the application shall be deemed approved to the extent required by State law." The lots and subdivisions page covers the lot split that can go with an SB 9 project.
Where City Text and State Law Differ
- ADU impact fee line. Section 37-50.250 waives impact fees for an ADU "less than seven hundred fifty square feet." Government Code 66311.5 bars impact fees on an ADU "that has 750 square feet of interior livable space or less." The statute controls, so a 750 square foot ADU pays none.
- Table numbers. Section 37-50.335 sends readers to "Table 37-50.46" for its SB 9 standards; the table it prints is titled "Table 37-50.85." Its height and front yard rows say "See Table 37-30.30," which is the R-L use table; the R-L height and yard limits are in Table 37-30.40 in Section 37-30.070, with a 30 foot height limit and a 20 foot front yard.
- Old fee exemption. Chapter 9 still prints a five-year ADU impact fee exemption from 2019, while the new ADU section sets the 750 square foot rule. The newer section and the statute describe the rule in force.
- Council PDF. The PDF of the ordinance in the Council record prints page 12 twice and has no page 11, which holds the definitions starting with S, T and U. The Planning Commission draft in the same record carries them.
The new City sections follow state law closely. The ADU height limits match the floors in Government Code 66321, the junior ADU owner occupancy rule matches Government Code 66333, and the ADU section requires no owner occupancy for ADUs, as Government Code 66315 requires. The California ADU law page explains the state rules.
Best For
- ✓ House lots with room for a detached ADU of 800 square feet behind the house, approved on the state-law path with no parking.
- ✓ R-L lots with no tenants in the last three years, for two 800 square foot SB 9 homes plus ADUs.
- ✓ Existing apartment lots, which may add up to eight detached ADUs.
Usually Fails When
- ✕ The SB 9 lot is partly outside R-L, holds a historic landmark, or had a tenant in the last three years.
- ✕ The plan treats an ADU or SB 9 home as a short-term rental.
- ✕ A detached ADU on the City path goes over 1,200 square feet.
What To Verify Before Spending Money
- → Whether the lot is within one-half mile walking distance of a major transit stop, for height and parking.
- → The FEMA flood zone, which can bar an SB 9 project.
- → Whether the City still applies any part of the 2019 ADU fee exemption.
Where to Go Next
Related on VanPlex: the Salinas overview, the California ADU law page and the SB 9 page.
Frequently Asked Questions
How big can an ADU be in Salinas?
How many ADUs can I build on a Salinas house lot?
Do I have to live on the property to build a Salinas ADU?
Does a Salinas ADU need parking?
Was there a time when Salinas had no ADU ordinance?
Can I build two houses on my Salinas lot under SB 9?
Can I rent out SB 9 homes in Salinas for short stays?
How long does Salinas take to approve an SB 9 project?
Does a Salinas ADU pay impact fees?
Can an SB 9 home in Salinas be taller than one story?