West Covina | Permits and Fees

West Covina, California Permits and Fees: Who Decides, Hearings, Appeals, Planning Fees and Development Impact Fees

Every housing project in West Covina passes through the Planning Division before the Building Division issues a permit. Small projects are decided by staff. Larger ones go to the Planning Commission, and a few to the City Council. This page sets out which permit each kind of project needs, how hearings and appeals work, a 2026 rule on incomplete applications, and the fees: planning fees from the City's Master Fee Schedule and the development impact fees that new homes pay toward police, fire, park and other public facilities. The West Covina overview has the summary.

West Covina permits and fees in six facts

  • The Community Development Director decides second unit reviews, administrative permits and minor modifications; the Planning Commission decides precise plans, conditional use permits and variances. Source: WCMC Sec. 26-199, Table 6-1
  • An appeal must be filed within 10 calendar days of the decision. Source: WCMC Sec. 26-193
  • Hearing notices for precise plans, conditional use permits, variances and tract maps go to owners within 500 feet, at least 10 days ahead. Source: WCMC Sec. 26-187
  • Since Ordinance No. 2540 of June 16, 2026, an incomplete planning application not answered within 180 days is deemed withdrawn. Source: Ordinance No. 2540
  • City impact fees on the 2026 schedule total $4,845.86 for a detached house and $3,458.13 for an attached or multi-family home where no subdivision is involved. Source: Master Fee Schedule, 2026
  • Impact fees are calculated when plans enter building plan check, the Building Division's review of construction plans, and are paid before the building permit is issued. Source: WCMC Sec. 17-205

Where to Start

The City's Planning Division page describes the division as "the first point of contact for homeowners, business owners and developers that are intending to construct new structures on privately-owned property," and gives its phone number as 626-939-8422. City Hall is at 1444 West Garvey Avenue South. The Planning Commission meets at 7 pm on the second and fourth Tuesdays of each month, and the City Council on the first and third Tuesdays. The applications and permits page posts every planning form, from the Second Unit Review to the Tentative Tract or Parcel Map.

  • Building Division. Its page says the division "is no longer accepting applications via email" and takes plans through its online submittal portal or at the counter, open "Monday through Thursday from 7:30 am to 5:30 pm."
  • Payments. The Planning Division page carries a fraud alert: "The City NEVER requests application payments via wire transfer."
  • Final inspection. A final planning inspection is required only if the approved plans carry the Planning Division's stamp on the front page.

Which Permit, and Who Decides

Table 6-1 in Section 26-199 assigns each permit to a decision body. The Community Development Director is the head of the department that holds the Planning, Building and Engineering Divisions.

Permit Who decides Appeal to
Second unit review (ADU, JADU, urban dwelling unit) Community Development Director None listed
Design review of a house Subcommittee of two Planning Commissioners Planning Commission
Administrative permit Community Development Director Planning Commission
Minor modification Community Development Director Planning Commission
Precise plan Planning Commission City Council
Conditional use permit on private property Planning Commission City Council
Variance Planning Commission City Council
Tree permit Director, or Planning Commission for a heritage tree Planning Commission, City Council

Sources: West Covina Municipal Code Sec. 26-199, Table 6-1, and Secs. 26-278 to 26-284 (Supplement 94).

  • Second unit review. The staff check for ADUs, junior ADUs and SB 9 urban dwelling units, with a 60-day limit. See the ADUs and SB 9 page.
  • Design review of houses. A subcommittee of two Planning Commissioners must review a house before a building permit for "New construction of single-family residences," "Structural additions or modifications on the front elevation," a new second story, a new balcony, or "Any modifications that is readily visible from a public right-of-way" (Section 26-280). Its criteria in Section 26-282 ask that materials, roof style and scale be "visually harmonious with the subject property and surrounding neighborhood." The applicant may appeal to the Planning Commission within 10 days, and building permits must be issued "within one (1) year of the date of approval."
  • Administrative permit. A Director-level permit for listed items such as a second driveway, a stepped hillside house or a second-story ADU addition. Under Section 26-238 the Director may approve, add conditions or deny, or send the matter to the Planning Commission. It expires if not used "within one (1) year of its effective date."
  • Precise plan. The site and design approval for apartments, mixed-use projects and any use that needs a conditional use permit. See the three or more homes page.
  • Conditional use permit. A conditional use permit allows a use that the zone lists as needing case-by-case review. Section 26-224 lists five findings, among them that the use "will not, under the circumstances of the particular case, be detrimental to the health, safety, peace or general welfare of persons residing or working in the vicinity." It expires after two years if not used.
  • More than one application. Applications for the same project "must be filed and processed concurrently," and "the highest approval authority shall act on all the applications." The fee schedule charges the full fee for the most expensive application "plus 50% of the fee for each additional application."

The scope of house design review is under discussion. A Planning Commission memorandum for October 13, 2026 notes that the "readily visible" clause sets no "minimum threshold for the type, size, or visual significance of a modification," and offers three options, from applying it broadly to listing what staff may approve. No change had been adopted when this guide was written.

Hearings and Notice

  • Planning Commission items. For precise plans, conditional use permits, variances and tentative tract maps, Section 26-187 requires notice mailed to the applicant, the owner and "owners of all property within a radius of five hundred (500) feet," at least 10 days before the hearing, and a printed notice posted at the site.
  • Large projects. A residential project of five or more units that needs Commission or Council review, and any tentative tract map, must put up a notice board at least 3 feet wide and 5 feet tall within five feet of the property line.
  • Zone changes and code amendments. Notice goes out at least 20 days ahead, and an applicant's site must be posted at least 30 days ahead.
  • Administrative permits. Where notice applies, owners within 500 feet get a mailed notice and the public review period "shall extend for ten (10) days from the date that the initial notice was mailed." Under Section 26-186, "A hearing will only take place if a request for such hearing is made with the planning division within the ten (10) day public review period." For a second driveway, notice goes only to the two properties on each side.
  • What changed in 2024. The Development Code Update page says the City "Increased the public hearing notification radius from 300 feet to 500 feet, or 1,000 feet for certain projects."

Appeals, Call-Ups and Time Limits

  • Who may appeal. Section 26-193 says "Appeals may be submitted by anyone, must be in writing, must include specific reasons for the appeal, and must be accompanied by the fee."
  • Deadline. An appeal must be submitted "no more than ten (10) calendar days after approval of a written decision," or after the Planning Commission adopts its resolution. If the tenth day falls on a day the City is closed, the period runs to the next business day.
  • Effect. "A timely appeal suspends and sets aside the decision of the lower authority." The appeal body holds a new hearing "within sixty (60) days from the filing of the appeal" and may approve, deny or modify.
  • One level for staff decisions. The Planning Commission's decision on an appeal of a Director or subcommittee decision is final unless the City Council agrees to hear it.
  • Council call-up. Under Section 26-196, "two (2) City Council members may, in writing, call for the review of the decisions of the Planning Commission within ten (10) days." Notice of a called-up item goes to owners within 1,000 feet. The staff report of March 18, 2025 says the Council added this to Ordinance No. 2525.
  • How long approvals last. Two years for a precise plan, a conditional use permit and a variance, with extensions of up to two more years; one year for an administrative permit, with one extension of a year; 24 months for a tentative parcel map.
  • After a denial. "A denied project may not be resubmitted to the City for review and approval in substantially the same form for at least one (1) year from the date of denial."

The 2026 Rule on Incomplete Applications

Ordinance No. 2540 replaced Section 26-182. The City Council minutes of June 16, 2026 record its adoption by a unanimous vote, and the staff report gave an effective date of "on or about July 17, 2026." The Municode copy of Section 26-182 still shows the 2024 text, so read the ordinance itself.

  • 180 days to respond. If the City finds an application incomplete, the applicant must submit the missing items "within one hundred eighty (180) days from the date of such determination, unless a different time period is specified by the Director."
  • Deemed withdrawn. If the applicant does not, "the application shall be deemed withdrawn without further action by the City."
  • One extension. The Director "may grant one (1) extension of up to ninety (90) days, upon written request by the applicant submitted prior to the expiration of the resubmittal deadline."
  • A new application. The staff report of June 2, 2026 says "Withdrawn applications must be submitted as new applications and shall be subject to fees and regulations in effect at that time."

The same ordinance added eligibility, design and operating standards for supportive and transitional housing to Section 26-133, and made the conversion of a hotel or motel to housing a conditional use in the RMU zone only.

Planning Fees in 2026

Section 26-184 says the City Council sets fees by resolution in a municipal fee schedule. The current one is Resolution No. 2024-50, adopted July 16, 2024, after a fee study the City received in 2023. Its Section 7 says the fees "may be adjusted on January 1 of each year" by the change in the Consumer Price Index for the Los Angeles area, and the City's Fee Schedule page posts the "Master Fee Schedule Effective January 1, 2026."

Planning service Fee from January 1, 2026
Second Unit Review, new construction or added floor area $1,022.42
Second Unit Review, existing structure conversion $654.99
Design Review, addition of floor area (Subcommittee Review) $617.71
Administrative Use Permit, residential, construction $1,373.88
Minor Modification $489.91
Conditional Use Permit, residential $5,058.86
Variance Review $13,115.77
Precise Plan of Design, Planning Commission $22,823.46
Tentative Parcel Map Processing $6,725.63
Tentative Tract Map Processing $12,940.04
Zone Change $10,474.51
General Plan Amendment $14,074.29
Preliminary Review Meeting $3,519.90
Appeal to Planning Commission or City Council, hearing item $3,264.30
Tree Removal, private property, first tree $271.58
Zoning Verification Letter $505.89

Source: City of West Covina, Master Fee Schedule effective January 1, 2026 (Resolution No. 2024-50). Most hearing items add the actual cost of attorney fees, charged against a deposit.

  • Surcharges on building permits. The schedule adds a General Plan Update Surcharge of 17.70 percent of the building permit fee on projects that need a zoning clearance, and a Planning Department plan review surcharge of 0.238 percent of the building valuation, with a $42.60 minimum.
  • Building permit fees. These follow the valuation of the work. For a valuation over $100,000 the 2026 schedule lists $2,729.34 plus $14.14 for each additional $1,000, and a plan check fee equal to 85 percent of the permit fee.
  • A hearing on an administrative permit. If a hearing is required or requested, the schedule adds $3,264.30 to the administrative use permit fee.
  • Environmental review. Where a project is not exempt from the state environmental review law, Section 26-294 has the applicant "hire and directly pay for the City's CEQA consultant."

Development Impact Fees

An impact fee is a one-time charge on new construction that pays for the public facilities the new homes will use. West Covina's are in Chapter 17, Article IV, adopted in 2015. Section 17-204 sets up five: police, fire, park, administrative and public works facilities. The amounts are set by resolution and printed in the Master Fee Schedule, per home.

Fee per home, 2026 Single-family detached Single-family attached or multi-family
Police $882.90 $630.49
Fire $1,076.74 $767.88
Parks $2,652.97 $1,893.61
City Administrative $155.49 $110.76
Public Works Capital Facilities $77.75 $55.38
Total printed on the schedule $4,845.86 $3,458.13
Total where a subdivision pays park dedication fees $2,192.88 $1,563.46

Source: City of West Covina, Master Fee Schedule effective January 1, 2026, Development Impact Fees. In the subdivision rows the City Administrative fee for an attached or multi-family home is printed as $109.70.

  • When they are set and paid. "The amount of the charge due under this article shall be determined at the time of submittal into building plan check for the project," and "The full amount shall be due and payable to the city prior to the issuance of building permits" (Section 17-205). The City then gives written notice of a 90-day period to protest the fee.
  • Which column applies. Section 17-203 defines "Single-family" as "residential structures that do not contain more than two (2) dwelling units" and "Multi-family" as a structure with three or more.
  • Exemptions. Section 17-206 exempts a remodel or addition that "does not add a dwelling unit," and a rebuild on the same site if the old structure was not vacant. A project that replaces an existing structure gets a credit for it. The City Council may reduce or waive fees for homes deed-restricted to very low and low income households.
  • ADUs. State law overrides the City's wording here: Government Code 66311.5 prohibits impact fees on an ADU of 750 square feet or less.
  • Park land in a subdivision. A project with a subdivision map pays the park dedication fee of Section 26-308 in place of the park impact fee, which is why the schedule has a second, lower set of totals.
  • Public art. Under Section 17-41, "New residential projects consisting of the subdivision of ten (10) or more residential lots and/or the construction of ten (10) or more dwelling units" must provide public art or "pay an in-lieu fee equal to one-half (½) percent of the total project costs, excluding land." Housing for low to moderate-income or senior households is exempt.

Fees charged by other agencies, such as school districts and the county sanitation districts, are outside the City's schedule and are not covered here. The California impact fees page explains the state rules.

Where City Documents and the Code Differ

  • How impact fees rise. Section 17-210 says the impact fees "shall be adjusted automatically on July 1 of each fiscal year" by the Construction Cost Index published by Engineering News Record. Resolution No. 2024-50 adjusts the whole schedule on January 1 by the Consumer Price Index, and the posted schedule is dated January 1, 2026. Ask the Building Division for the amount in force on your plan check date.
  • An old section number. The fee schedule cites "WCMC Section 20-40" for park dedication fees. Chapter 20 is now reserved, and the rule is in Sections 26-308 and 26-309.
  • A blank line on the schedule. The 2026 schedule prints "#REF!" beside a $1,022.42 fee where the 2024 schedule had "Reasonable Accommodation Processing" at $960.00.
  • Second units and impact fees. Section 17-203 still cites Government Code section 65852.2, a number no longer in the Government Code, and "Title 21, Article XII, Division 11" for second units. The West Covina code has no Title 21.
  • Who hears parcel maps. The Planning Division page lists parcel maps under the Planning Commission; the code gives them to the Director since March 2025.

Best For

  • ✓ ADUs and SB 9 homes, which need only the second unit review and a building permit.
  • ✓ Projects that fit the zone, where an administrative permit or minor modification avoids a hearing.
  • ✓ Rebuilds on the same site, which pay no City impact fees if the old home was not vacant.

Usually Fails When

  • ✕ An applicant lets a correction letter sit past 180 days; the application is then withdrawn.
  • ✕ An appeal is filed on the eleventh day.
  • ✕ A budget uses the 2024 fee amounts with no check of the January 1 adjustment.

What To Verify Before Spending Money

  • → The fee schedule in force on the day you file and on the day plans enter plan check.
  • → Whether the City has changed the scope of house design review since October 2026.
  • → School district and sanitation district fees, which the City does not set.

Where to Go Next

Related on VanPlex: the West Covina overview, the California impact fees page and the CEQA and permit streamlining page.

Frequently Asked Questions

Who do I contact about a building project in West Covina? +
Start with the West Covina Planning Division at 626-939-8422, at City Hall, 1444 West Garvey Avenue South. The City's Planning Division page calls it the first point of contact for owners and developers who intend to build. The Building Division counter is open Monday through Thursday from 7:30 am to 5:30 pm and takes plans through its online submittal portal.
What is the Subcommittee for Design Review in West Covina? +
The West Covina Subcommittee for Design Review is two Planning Commissioners who review house designs in an open meeting. Section 26-280 requires its review before a building permit for a new house, a second-story addition, a change to the front elevation, a new balcony or any modification readily visible from the street. The 2026 fee for an addition of floor area is $617.71.
What is an administrative permit in West Covina? +
A West Covina administrative permit is a staff-level approval by the Community Development Director for listed uses and structures, such as a second driveway or a stepped house on a slope. Where notice is required, owners within 500 feet get a mailed notice and 10 days to ask for a hearing. If no one asks, the Director decides with no hearing. An unused permit expires after one year.
How do I appeal a planning decision in West Covina? +
File a written appeal with specific reasons and the fee within 10 calendar days. Under West Covina Section 26-193, a decision of the Community Development Director or the design subcommittee goes to the Planning Commission, and a Planning Commission decision goes to the City Council. The appeal body holds a new hearing within 60 days. The 2026 fee for a hearing item is $3,264.30 plus attorney costs.
What are the impact fees on a new home in West Covina? +
West Covina's Master Fee Schedule effective January 1, 2026 lists development impact fees totaling $4,845.86 for a single-family detached home and $3,458.13 for an attached or multi-family home where no subdivision is involved. The fees fund police, fire, parks, City administrative and public works facilities. Under Government Code 66311.5, an ADU of 750 square feet or less pays none.
When are West Covina impact fees paid? +
West Covina impact fees are due before the building permit is issued. Section 17-205 says the amount is determined when the project is submitted to building plan check, and the City then gives written notice of the amount and of a 90-day period to protest it. A rebuild on the same site pays none if the old home was not vacant.
How often do West Covina planning fees change? +
West Covina planning fees may rise every January 1. Resolution No. 2024-50, adopted July 16, 2024, lets the City Manager adjust the Master Fee Schedule each year by the change in the Consumer Price Index for the Los Angeles area. The second unit review fee for new construction was $960.00 on the 2024 schedule and is $1,022.42 on the schedule effective January 1, 2026.
What happens if my West Covina planning application stays incomplete? +
It is deemed withdrawn after 180 days. Ordinance No. 2540, adopted by the West Covina City Council on June 16, 2026, rewrote Section 26-182 to give an applicant 180 days from the City's written notice of incompleteness to submit the missing items. The Director may grant one extension of up to 90 days. After withdrawal, a new application and new fees are required.
Does West Covina charge a public art fee on new housing? +
Yes, on larger projects. West Covina's Art in Public Places rules in Chapter 17 apply to new residential projects of ten or more lots or dwelling units. The applicant installs artwork or pays an in-lieu fee equal to one-half percent of total project costs, excluding land, before the building permit. Housing restricted to low or moderate-income or senior households is exempt.
Can the West Covina City Council review a Planning Commission decision without an appeal? +
Yes. West Covina Section 26-196 lets two City Council members call up a Planning Commission decision in writing within 10 days of the meeting where it was made. The Council then hears the item anew within 60 days, and notice goes to owners within 1,000 feet. Ordinance No. 2525 added this wording in March 2025.

Official sources (checked October 2026)

West Covina Municipal Code, Section 26-182, application forms and materials
https://library.municode.com/ca/west_covina/codes/code_of_ordinances?nodeId=MUCO_CH26ZO_ARTVIPEPRPR_DIV1GEPR_S26-182APFOMA
West Covina Municipal Code, Section 26-184, filing fees
https://library.municode.com/ca/west_covina/codes/code_of_ordinances?nodeId=MUCO_CH26ZO_ARTVIPEPRPR_DIV1GEPR_S26-184FIFE
West Covina Municipal Code, Section 26-294, fees and environmental review costs
https://library.municode.com/ca/west_covina/codes/code_of_ordinances?nodeId=MUCO_CH26ZO_ARTVIIDECOAD_DIV2ADEN_S26-294FE
West Covina Municipal Code, Section 26-186, setting hearings
https://library.municode.com/ca/west_covina/codes/code_of_ordinances?nodeId=MUCO_CH26ZO_ARTVIPEPRPR_DIV1GEPR_S26-186SEHE
West Covina Municipal Code, Section 26-187, notices
https://library.municode.com/ca/west_covina/codes/code_of_ordinances?nodeId=MUCO_CH26ZO_ARTVIPEPRPR_DIV1GEPR_S26-187NO
West Covina Municipal Code, Section 26-193, appeal procedure
https://library.municode.com/ca/west_covina/codes/code_of_ordinances?nodeId=MUCO_CH26ZO_ARTVIPEPRPR_DIV1GEPR_S26-193APPR
West Covina Municipal Code, Section 26-196, City Council call-up
https://library.municode.com/ca/west_covina/codes/code_of_ordinances?nodeId=MUCO_CH26ZO_ARTVIPEPRPR_DIV1GEPR_S26-196CICOCAPR
West Covina Municipal Code, Section 26-199, Table 6-1, who decides each permit
https://library.municode.com/ca/west_covina/codes/code_of_ordinances?nodeId=MUCO_CH26ZO_ARTVIPEPRPR_DIV1GEPR_S26-199REPR
West Covina Municipal Code, Section 26-219, precise plan expiration
https://library.municode.com/ca/west_covina/codes/code_of_ordinances?nodeId=MUCO_CH26ZO_ARTVIPEPRPR_DIV3PRPL_S26-219FAACPRPL
West Covina Municipal Code, Section 26-224, conditional use permit findings
https://library.municode.com/ca/west_covina/codes/code_of_ordinances?nodeId=MUCO_CH26ZO_ARTVIPEPRPR_DIV4COUSPE_S26-224REFICOUSPE
West Covina Municipal Code, Section 26-228, conditional use permit expiration
https://library.municode.com/ca/west_covina/codes/code_of_ordinances?nodeId=MUCO_CH26ZO_ARTVIPEPRPR_DIV4COUSPE_S26-228FATAACCOUSPE
West Covina Municipal Code, Section 26-238, administrative permit
https://library.municode.com/ca/west_covina/codes/code_of_ordinances?nodeId=MUCO_CH26ZO_ARTVIPEPRPR_DIV6ADPE_S26-238CODEDITHDEMAGRADPE
West Covina Municipal Code, Section 26-240, administrative permit expiration
https://library.municode.com/ca/west_covina/codes/code_of_ordinances?nodeId=MUCO_CH26ZO_ARTVIPEPRPR_DIV6ADPE_S26-240FAACADPE
West Covina Municipal Code, Section 26-256, second unit review
https://library.municode.com/ca/west_covina/codes/code_of_ordinances?nodeId=MUCO_CH26ZO_ARTVIPEPRPR_DIV9SEUNREACDWUNURDWUN_S26-256PR
West Covina Municipal Code, Section 26-280, design review required
https://library.municode.com/ca/west_covina/codes/code_of_ordinances?nodeId=MUCO_CH26ZO_ARTVIPEPRPR_DIV13PLCOSUDERE_S26-280RERE
West Covina Municipal Code, Section 26-282, design review criteria
https://library.municode.com/ca/west_covina/codes/code_of_ordinances?nodeId=MUCO_CH26ZO_ARTVIPEPRPR_DIV13PLCOSUDERE_S26-282BAAP
West Covina Municipal Code, Section 26-284, design review appeal
https://library.municode.com/ca/west_covina/codes/code_of_ordinances?nodeId=MUCO_CH26ZO_ARTVIPEPRPR_DIV13PLCOSUDERE_S26-284AP
West Covina Municipal Code, Section 26-285, design review expiration
https://library.municode.com/ca/west_covina/codes/code_of_ordinances?nodeId=MUCO_CH26ZO_ARTVIPEPRPR_DIV13PLCOSUDERE_S26-285EX
West Covina Municipal Code, Section 26-308, parks and recreation
https://library.municode.com/ca/west_covina/codes/code_of_ordinances?nodeId=MUCO_CH26ZO_ARTVIIISURE_DIV2GEPR_S26-308PARE
West Covina Municipal Code, Section 17-203, impact fee definitions
https://library.municode.com/ca/west_covina/codes/code_of_ordinances?nodeId=MUCO_CH17PL_ARTIVDEIMFE_S17-203DE
West Covina Municipal Code, Section 17-204, impact fees established
https://library.municode.com/ca/west_covina/codes/code_of_ordinances?nodeId=MUCO_CH17PL_ARTIVDEIMFE_S17-204ESDI
West Covina Municipal Code, Section 17-205, calculation and payment
https://library.municode.com/ca/west_covina/codes/code_of_ordinances?nodeId=MUCO_CH17PL_ARTIVDEIMFE_S17-205CAPADI
West Covina Municipal Code, Section 17-206, exemptions and credits
https://library.municode.com/ca/west_covina/codes/code_of_ordinances?nodeId=MUCO_CH17PL_ARTIVDEIMFE_S17-206EXCREXDE
West Covina Municipal Code, Section 17-210, inflation adjustment
https://library.municode.com/ca/west_covina/codes/code_of_ordinances?nodeId=MUCO_CH17PL_ARTIVDEIMFE_S17-210PEREINAD
West Covina Municipal Code, Section 17-41, art in public places projects
https://library.municode.com/ca/west_covina/codes/code_of_ordinances?nodeId=MUCO_CH17PL_ARTIIARPUPL_DIV2PRSUARPUPLPR_S17-41PRSURE
West Covina Municipal Code, Section 17-51, art in public places requirements
https://library.municode.com/ca/west_covina/codes/code_of_ordinances?nodeId=MUCO_CH17PL_ARTIIARPUPL_DIV3REARPUPLPR_S17-51RE
City of West Covina, Master Fee Schedule effective January 1, 2026 (PDF)
https://www.westcovina.gov/DocumentCenter/View/2489/Master-Fee-Schedule---2026-CPI-Increase
City of West Covina, Resolution No. 2024-50, revised Master Fee Schedule, July 16, 2024 (PDF)
https://public.destinyhosted.com/westcdocs/2024/CC/20240716_633/2505_Resolution_No._2024-50_-_Revised.pdf
City of West Covina, Fee Schedule page
https://www.westcovina.gov/267/Fee-Schedule
City of West Covina, Planning Division page
https://www.westcovina.gov/225/Planning-Division
City of West Covina, Building Division page
https://www.westcovina.gov/228/Building-Division
City of West Covina, Community Development applications and permits page
https://www.westcovina.gov/227/Community-Development-Applications-Permi
City of West Covina, Current Meetings and Agendas page
https://www.westcovina.gov/193/Current-Meetings-Agendas
City of West Covina, Ordinance No. 2540, adopted June 16, 2026 (PDF)
https://public.destinyhosted.com/westcdocs/2026/CC/20260616_833/3133_Ordinance_No._2540_Approving_Code_Amendment_No._26-01_-_Adoption_6-16-26.pdf
City Council staff report, Ordinance No. 2540, June 2, 2026
https://public.destinyhosted.com/93782/agenda/agenda-item.cfm?seq=3114&rev=0
City Council minutes, June 16, 2026
https://public.destinyhosted.com/93782/agenda/minutes.cfm?meetingId=833
City Council staff report, Ordinance No. 2525 adoption, March 18, 2025
https://public.destinyhosted.com/93782/agenda/agenda-item.cfm?seq=2690&rev=0
Planning Commission memorandum, scope of design review, October 13, 2026
https://public.destinyhosted.com/93782/agenda/agenda-item.cfm?seq=3279&rev=0
Government Code 66311.5 (ADU fees)
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV&sectionNum=66311.5
General information, not legal advice. California housing law changes every year, and each city adds its own rules on top of state law. Confirm current requirements with the city or county planning department, and with a California-licensed attorney or architect, before you buy land or file plans.

Planning a multiplex in West Covina?

VanPlex builds multiplexes in British Columbia, Canada. For a lot in West Covina, our team makes a custom proforma by hand and emails it to you in 24 to 48 hours.

Get a proforma for your address