Written by David Babakaiff · Co-Founder, VanPlex | 25+ Years BC Construction Last reviewed: October 2026

El Paso | Plats, Permits and Fees

El Paso Plats, Permits and Fees: Plat Types, Deadlines, Impact Fees and What the City Charges

A new home on a new or changed lot in El Paso passes through two City reviews. The first is the plat, the recorded map that divides land into lots, under Title 19 of the El Paso Municipal Code. The second is the building permit, under Title 18. Along the way the City and El Paso Water charge application fees, parkland fees and, in three service areas, water and wastewater impact fees. This page gives the plat types, the deadlines and the amounts, with the source for each. The El Paso overview gives the short version.

El Paso plats and fees in six facts

When a Plat Is Required

Section 19.01.020 says "a final plat shall be submitted approved and filed prior to any non-exempt land division," and requires a replat "any time a platted, recorded lot is further divided or expanded." Section 19.01.030 lists divisions that need no plat once the City approves an exemption determination; the City lists that platting determination at $106. The lot size page explains the exemptions homeowners use most, including splitting a recorded duplex lot.

A second kind of plat covers building on land that was never platted. Under Section 19.05.010, a development plat is required for new construction or enlarging a building on a tract "which has not been platted or replatted," on land whose "only access is a private easement or street," or on tracts over five acres where no public improvement is dedicated. No building, utility or electrical permit is issued "until a development plat, or if applicable a subdivision plat, has been approved by the city plan commission" and recorded with El Paso County.

Plat Types and Who Decides

Type When it applies Who decides Decision time Approval lasts
Minor plat Four or fewer lots, all fronting an existing public street, with no new street or alley and no extension of City facilities City manager or designee 30 days; deemed approved if no action 2 years to record
Amending plat Corrects errors or moves lot lines between adjacent lots without adding lots City manager or designee 10 days Same recording period as a final plat
Replat Changes a recorded plat; four or fewer lots may be approved as a minor plat when no hearing or notice is needed City Plan Commission 30 days As a final plat
Preliminary plat First stage of a subdivision plat City Plan Commission 30 days from completeness 3 years
Final plat Last stage, before recording City Plan Commission 30 days 3 years to record
Development plat Development of an unplatted tract, a tract reached only by a private easement, or tracts over five acres City Plan Commission 30 days 2 years to record

Source: El Paso Municipal Code, Title 19, Article 1 (Sec. 19.01.040, 19.03.060, 19.04.060, 19.05.010, 19.06.010 to 19.06.050, 19.07.010 and 19.07.040), Supplement 95 Update 4.

A subdivision plat may pass through three stages under Section 19.01.060: a land study where required, a preliminary plat and a final plat. An applicant may file a preliminary and final plat together as a "combination," which must meet every final plat requirement before the City Plan Commission approves it. The minor plat is the shortcut for a small split: "the purpose of a minor plat is to simplify divisions of land," and the applicant files a combined preliminary and final plat prepared by a registered professional land surveyor. An appeal of a staff decision on a minor plat goes to the City Plan Commission at its next available meeting.

Two rules on small replats use different numbers. Section 19.07.010 lets "a replat of four or fewer lots" be approved administratively as a minor plat when no hearing or notice is required, while the infill incentives in Section 19.26.020 speak of "replats with less than four lots." For a four-lot infill replat the two numbers differ, and the code does not say which controls; ask the planning division which route applies.

Completeness and the Thirty-Day Clock

Every application gets a completeness check. Under Section 19.37.020, the City must tell the applicant in writing whether an application is complete "no later than the fifth business day" after it is submitted. If it is incomplete, the letter lists what is missing and the applicant has forty-five days to supply it, or the application expires. If the City sends no letter within five business days, the application counts as submitted on the day it came in. Fees "shall not be refundable" and are due no later than the date the application is found complete (Section 19.37.070).

Section 19.01.040 then requires action on "all preliminary plat, final plat, minor plat, development plat, replat, and land study applications" within thirty days "from the date a submitted application is deemed complete." An applicant may ask in writing for an extension of up to thirty days. State law sets the same period: Local Government Code 212.009 requires a decision "within 30 days after the date the plat is filed," and a plat counts as filed when the applicant submits it "along with a completed plat application and the application fees." If the two ever conflict, Section 19.65.010 says "the conflicting portion of Title 19 shall be replaced with the prevailing portion" of chapter 212.

A conditional approval or a denial must come with a written statement of each condition or reason, "directly related to the requirements in Title 19" and the Street Design Manual, with "a citation to the law" behind it. The applicant may answer in writing, and the City Plan Commission decides the resubmitted plat within fifteen days (Sections 19.03.030 and 19.04.030).

Replats on Older Residential Lots

Section 19.07.030 adds steps when, in the past five years, the area was limited by zoning "to residential use for not more than two residential units per lot," or any lot in the earlier plat was limited that way by deed restrictions:

  • No variance needed. Within fifteen days after approval, the City mails notice to each owner of a lot in the original subdivision within two hundred feet, with the new zoning and a contact for the City.
  • Variance needed. The City Plan Commission holds a public hearing, with newspaper notice and mailed notice before the fifteenth day before the hearing (Sections 19.38.010 and 19.38.020).
  • Protest. When the replat needs a variance and owners of at least twenty percent of the land within two hundred feet, inside the original subdivision, file written protests before the hearing closes, approval takes "at least three-fourths of the members of the city plan commission present."

An amending plat avoids these steps for its listed purposes, such as fixing a survey error or moving a lot line between adjacent lots without adding lots: "Notice, a hearing, and the approval of other lot owners are not required" (Section 19.07.040).

Subdivision Fees

Title 19 sets no dollar amounts. Section 19.60.010 says all fees "shall be in the amount authorized by city council in the annual budget resolution." The City publishes the plat fees on its Subdivision Application Fees sheet, which the Planning and Inspections forms page links as its latest. The sheet is headed "Effective September 1, 2025" and "FY2026," and says "Technology fee is included in fee amounts shown."

Application Fee, effective September 1, 2025
Platting determination $106
Pre-application meeting $181 per hour
Amending plat $865
Minor subdivision $1,040
Development plat $1,886
Resubdivision preliminary $1,890
Resubdivision final $2,140
Resubdivision combination $2,390
Major preliminary $2,290
Major final $2,260
Major combination $2,340
Subdivision extension or reinstatement $630
Vesting request $356
Dedication of right-of-way or easements $1,790

Source: City of El Paso, Subdivision Application Fees, FY2026, read October 8, 2026. El Paso's fiscal year starts September 1, so confirm that no newer sheet has been posted.

"Resubdivision" is the sheet's word for a replat. A four-lot split on an existing street that qualifies as a minor plat costs $1,040 on this sheet; the same split filed as a resubdivision combination costs $2,390.

Parkland Dedication and Fees

Every residential subdivision provides parkland under Chapter 19.20: one acre for every one hundred single-family or two-family units, and one acre for every two hundred multifamily units. Where more than one home per lot may be allowed, the count uses "the gross density permitted by the zoning classification." The City may take cash instead, for example when less than one acre is due. The fee in Section 19.20.110 is "one thousand three hundred seventy dollars per dwelling unit" for single-family and two-family homes and $680 for multifamily, "indexed to any increase in the National Consumer Price Index (CPI) and adjusted no less frequently than every three years." It is paid by cashier's check with the recording plat.

Section 19.20.060 excludes "a residential replat of an area where the density has not been increased from the original subdivision," as well as PMD land and land in an adaptive reuse or transit oriented development overlay.

Water and Wastewater Impact Fees

An impact fee is a one-time charge on new development that pays for the added water and sewer capacity it needs. Chapter 15.22, the City of El Paso Impact Fee Ordinance, is administered by El Paso Water Utilities. It sets three service areas, the Westside, Eastside and Northeast, within the city and its extraterritorial jurisdiction. A service unit is the water and wastewater flow "for a single family residential or equivalent unit with a water meter smaller than one inch." Ordinance No. 019626 of May 7, 2024 adopted the current land use assumptions, capital improvements plan and fee amounts.

Service area Water, meter under 1 inch Wastewater, meter under 1 inch Water, 1-inch meter Wastewater, 1-inch meter
Northeast $1,508 $372 $2,518 $622
Westside $844 $1,187 $1,409 $1,981
Eastside $892 $1,178 $1,489 $1,967

Source: El Paso Municipal Code, Chapter 15.22, Appendix B (Impact Fee Assessment Schedules), Ord. No. 019626, § 5, May 7, 2024. The schedule runs to 12-inch meters.

The adopted amounts sit below the maximum the law allows. Section 15.22.100 lists a maximum allowable water fee per service unit of $5,012 in the Northeast, $1,568 on the Westside and $7,477 on the Eastside, after a credit of fifty percent of the plan's projected cost under Local Government Code 395.014(7), and says "the impact fee to be assessed is the impact fee adopted by the city council." Timing works in two steps. The fee is assessed when the plat or replat is recorded, and after that it "cannot be increased" unless the plat expires and the service units or meter size grow (Sections 15.22.110 and 15.22.120). It is collected, for land platted inside the city limits, "at the time a building permit is issued" (Section 15.22.130), and "No building permit shall be issued without payment of an impact fee" (Section 15.22.140).

  • Affordable housing. The city manager or designee "shall administratively reduce or waive an impact fee for a service unit" that qualifies as affordable housing under 42 U.S.C. Section 12745, under the City's fee waiver program and an enforced affordability period (Section 15.22.145).
  • Conversions. No impact fee on land where a building has been converted to mixed-use residential or apartment use, unless the land already owed one (Section 15.22.200, added November 18, 2025).
  • Refunds. A fee not spent within ten years is refunded to the record owner with interest (Section 15.22.150).

Section 15.22.145 begins "Notwithstanding Section 15.20.130 of this chapter," a section number outside Chapter 15.22; the collection rule it sits beside is Section 15.22.130.

The Building Permit

A required subdivision must be recorded first. Section 19.08.020 says "no building permit shall be issued for any lot until the subdivision has been recorded," except that for industrial, commercial and multi-family developments and subdivisions with several single-family lots, permits for up to fifty percent of the buildings or lots may issue once the improvement plans are reviewed and the work is under way.

Chapter 18.02 sets the permit rules. The fee for a new home is "based on the square footage cost prescribed by the FY Schedule C in effect on the date of the permit application" (Section 18.02.106.6.1). VanPlex did not find the current Schedule C residential rate on a City page, so this page gives no permit fee per square foot. The City's Planning and Inspections page lists, effective September 1, 2025, a residential submittal fee deposit of $200.00, "credited to permit fee," and a residential expedited plan review submittal fee of $200.00.

  • Plan review clock. If no permit is secured within 180 days of the application, the application expires and a plan review fee of thirty percent of the permit fee is due (Section 18.02.106.11).
  • Expiry. A permit expires if work does not start within six months, stops for six months, or goes six months without a called-for inspection (Section 18.02.105.23).
  • Extensions. Up to two extensions of not more than 180 days each, requested in writing before expiry; "There shall be no fee for the extension of an unexpired permit."
  • Owner-builders. A homeowner may pull a permit for work on the home the owner lives in as a primary residence, acting as general contractor, when registered contractors do the electrical, plumbing, mechanical and irrigation work (Section 18.02.105.29.1).

State law sets the outer deadline. Local Government Code 214.904 requires a city, by the 45th day after a permit application, to grant or deny it, give written reasons for the delay, or agree on a deadline in writing. A city that misses the deadline "may not collect any permit fees associated with the application" and must refund those it collected.

Where a detailed site development plan is required, Section 20.04.150 lets the zoning administrator approve it for a site of two acres or less with no more than two buildings. Others go to the City Plan Commission, which hears them within thirty days of the staff recommendation. An approved plan expires if construction does not start within four years.

Best For

  • ✓ A split into four lots or fewer on an existing public street, which staff decide as a minor plat for $1,040.
  • ✓ A home on the Westside, where the water impact fee for a small meter is $844.
  • ✓ An applicant who files a complete application, since the thirty-day clock runs from completeness.

Usually Fails When

  • ✕ The replat lies in a subdivision once limited to two units per lot and needs a variance, which brings a hearing and a protest right.
  • ✕ The budget leaves out water, wastewater and parkland fees due at the building permit or recording plat.
  • ✕ Work does not start within six months of the permit and no extension was requested in writing.

What To Verify Before Spending Money

  • → Which impact fee service area the lot is in, with El Paso Water Utilities.
  • → Whether a newer subdivision fee sheet has replaced the FY2026 one.
  • → The current CPI-indexed parkland fee and the Schedule C building permit rate.

Where to Go Next

Related on VanPlex: the El Paso overview, how Texas zoning works, and other 2025 Texas housing laws.

Frequently Asked Questions

Do I need a plat to divide land in El Paso? +
Usually, yes. El Paso Section 19.01.020 requires a final plat to be submitted, approved and filed before any non-exempt land division, and a replat any time a platted, recorded lot is further divided. Section 19.01.030 lists exemptions, such as splitting a recorded duplex lot into two lots by metes and bounds, each needing an approved exemption determination.
What is a minor plat in El Paso? +
A minor plat in El Paso, under Chapter 19.06, divides land into four or fewer lots that all front an existing public street, needs no new street or alley, and needs no extension of City facilities. The city manager or designee decides it within thirty days of completeness, or it is deemed approved. The approval lasts two years for recording, and the City lists the fee at $1,040.
How long does El Paso have to approve a plat? +
El Paso Section 19.01.040 requires action on preliminary, final, minor, development, replat and land study applications within thirty days from the date the application is deemed complete. An applicant may request in writing an extension of up to thirty days. Local Government Code 212.009 sets the same thirty-day period from filing, and Section 19.65.010 says state law prevails over any conflicting part of Title 19.
How long is an El Paso final plat approval valid? +
An El Paso final plat approval remains in effect for three years from the date the City Plan Commission approves it, under Section 19.04.060, and the plat must be recorded in that time. Section 19.41.030 allows a first extension of up to one year if requested in writing at least thirty business days before expiration. The City lists the extension fee at $630.
What are the El Paso water and wastewater impact fees for a house? +
For a single-family home with a meter smaller than one inch, El Paso Appendix B of Chapter 15.22 sets the water and wastewater impact fees at $1,508 and $372 in the Northeast service area, $844 and $1,187 on the Westside, and $892 and $1,178 on the Eastside. Ordinance No. 019626 adopted these amounts on May 7, 2024.
When are impact fees paid in El Paso? +
For land platted inside the El Paso city limits, Section 15.22.130 collects water and wastewater impact fees when the building permit is issued. Outside the city limits, or where land is developed without platting, they are collected when the application for a water or wastewater meter connection is filed. The fee amount is assessed when the plat or replat is recorded.
Can El Paso waive impact fees for affordable housing? +
Yes. El Paso Section 15.22.145 directs the city manager or designee to reduce or waive an impact fee for a service unit that qualifies as affordable housing under 42 U.S.C. Section 12745. The waiver must follow the City fee waiver program and an affordability period enforced by agreement, covenant or lien. If affordable housing is not built, the City may assess the fee later.
When does an El Paso building permit expire? +
An El Paso building permit expires under Section 18.02.105.23 if work does not start within six months of issue, if work stops for six months, or if no inspection is called for and received in six months. A holder may request up to two extensions of up to 180 days each, in writing before expiration, and pays no fee for an extension.
How much is the El Paso parkland fee per home? +
El Paso Section 19.20.110 sets the fee in lieu of parkland dedication at $1,370 per single-family or two-family unit and $680 per multifamily unit. The section says the fees are indexed to the Consumer Price Index and adjusted at least every three years, so the amount charged may be higher. The fee is paid by cashier check with the recording plat.
Can I get a building permit before my El Paso plat is recorded? +
Only in limited cases. El Paso Section 19.08.020 says no building permit is issued for any lot until a required subdivision is recorded. For industrial, commercial and multi-family developments, and subdivisions with several single-family lots, permits for up to fifty percent of the buildings or lots may issue early when the improvement plans are reviewed and the work is under way.
Who approves a detailed site plan in El Paso? +
In El Paso, the zoning administrator approves a detailed site development plan under Section 20.04.150 when the site is two acres or less, has no more than two buildings and meets every code provision. Other plans go to the City Plan Commission, which must hold a hearing within thirty days of the staff recommendation. An approved plan expires if construction does not start within four years.

Official sources (checked October 2026)

El Paso Municipal Code, Title 19, Article 1 (platting procedures)
https://library.municode.com/tx/el_paso/codes/code_of_ordinances?nodeId=TIT19SUDEPL_ART1PLPR
El Paso Municipal Code, Chapter 19.06 (minor plats)
https://library.municode.com/tx/el_paso/codes/code_of_ordinances?nodeId=TIT19SUDEPL_ART1PLPR_CH19.06MIPL
El Paso Municipal Code, Chapter 19.07 (revisions to recorded plats)
https://library.municode.com/tx/el_paso/codes/code_of_ordinances?nodeId=TIT19SUDEPL_ART1PLPR_CH19.07REREPL
El Paso Municipal Code, Title 19, Article 4 (application processing)
https://library.municode.com/tx/el_paso/codes/code_of_ordinances?nodeId=TIT19SUDEPL_ART4SPAPPRRE
El Paso Municipal Code, Title 19, Article 8 (conflict of laws)
https://library.municode.com/tx/el_paso/codes/code_of_ordinances?nodeId=TIT19SUDEPL_ART8COLA
El Paso Municipal Code, Chapter 19.20 (parks and open space)
https://library.municode.com/tx/el_paso/codes/code_of_ordinances?nodeId=TIT19SUDEPL_ART2SUST_CH19.20PAOPSP
El Paso Municipal Code, Chapter 15.22 (water and wastewater impact fees)
https://library.municode.com/tx/el_paso/codes/code_of_ordinances?nodeId=TIT15PUSE_CH15.22WAWAIMFE
El Paso Municipal Code, Chapter 18.02 (building administrative code)
https://library.municode.com/tx/el_paso/codes/code_of_ordinances?nodeId=TIT18BUCO_CH18.02BUCOADCO
El Paso Municipal Code, Chapter 20.04, Article III (detailed site development plans)
https://library.municode.com/tx/el_paso/codes/code_of_ordinances?nodeId=TIT20ZO_CH20.04ADPR_ARTIIIDESIDEPLAPPR
City of El Paso, Subdivision Application Fees, effective September 1, 2025 (PDF)
https://www.elpasotexas.gov/assets/Documents/CoEP/Planning-and-Inspections/Applications/Subdivision-Application-Fees/Subdivision-Application-Fees-latest.pdf
City of El Paso, Planning and Inspections (plan review and submittal fees)
https://www.elpasotexas.gov/planning-and-inspections
Local Government Code 212.009 (plat approval deadlines)
https://statutes.capitol.texas.gov/Docs/LG/htm/LG.212.htm#212.009
Local Government Code chapter 212 (plats and replats)
https://statutes.capitol.texas.gov/Docs/LG/htm/LG.212.htm
Local Government Code 214.904 (building permit deadlines)
https://statutes.capitol.texas.gov/Docs/LG/htm/LG.214.htm#214.904
General information, not legal advice. Texas has no statewide zoning code. Each city writes its own rules, and deed restrictions recorded on a lot can forbid what the city allows. Confirm current requirements with the city planning department, read the deed restrictions for your lot, and talk to a Texas-licensed attorney or architect before you buy land or file plans.