Menifee, California Hillside, Quail Valley and Fire Zones: Steep Slope Limits, the Hillside Plot Plan, the Quail Valley Septic Ban and Fire Hazard Rules

Three local conditions can stop or reshape a Menifee project before the zone rules are even reached: steep hillsides, the septic system ban in Quail Valley, and fire hazard zones. Each is handled by a different body. The City writes the hillside rules in Chapter 9.190 of the Development Code, in Article 4. The Santa Ana Regional Water Quality Control Board, a state agency, controls septic systems in Quail Valley, and the City explains the rule on its Quail Valley Moratorium page. Fire hazard zones come from state maps that the City Council approved for Menifee by ordinance in June 2025. This page sets out what each one means for ADUs, SB 9 homes, small lot maps and new houses. The Menifee overview has the summary.

Hillside, septic and fire rules in six facts

Where the Hillside Rules Apply

Chapter 9.190 applies "to all development on properties in Menifee that contain significant areas of steep slopes and prominent hillsides and ridgelines" within the areas shown on Figure 9.190.020-1, the Menifee Hillside Map. The chapter says these features "are typical of the properties in the Rural Mountainous (RM) and Rural Residential, 5-acre minimum (RR5) zones, but not limited to these areas." Article 6 defines a steep slope as land with a gradient of at least 25 percent, meaning "25 feet of vertical distance for every 100 feet of horizontal distance," and at least 50 feet of vertical rise. A ridgeline is "an elongated crest, or series of crests, with or without individual peaks, significantly higher than the adjoining ground."

Section 9.190.030 exempts development that stays "a minimum of 50 feet from the top of any steep slope or hillside and is no closer than 200 feet horizontally and 50 feet vertically from prominent ridgelines." It also exempts projects with a valid map, grading permit or other approval consistent with the rules before the General Plan update of December 18, 2013, open space and trails on City land, some access roads and utility lines, and fire clearance that keeps the native root stock.

Development that is not exempt "shall require plot plan approval pursuant to Chapter 9.80," and the application must include a plot plan by a licensed surveyor or civil engineer, a grading plan, a topographic map at a scale of at least 1 inch to 100 feet with contours no more than 10 feet apart, a slope analysis in four bands (0 to 24, 25 to 34, 35 to 50 and over 50 percent), a biological report, a cultural resources report by a qualified archeologist, photographs, an erosion control plan, a landscape and habitat restoration plan, architectural and lighting plans, a line of sight visual analysis, and a fuel modification plan.

Hillside Development Standards

Section 9.190.060 sets the limits for development that encroaches on steep slopes, hillsides or ridgelines:

  • Ridgelines. "Areas situated within 200 feet horizontally and 50 feet vertically of a hilltop or ridgeline shall not be disturbed."
  • Roofs and slopes. "The horizontal distance between a natural or graded steep slope and a roof, or portion thereof, shall not be less than 20 feet."
  • Graded slopes. A graded slope in areas of natural steep slopes "shall not exceed 30 feet" in height.
  • Blasting. Blasting for roads or pads "shall be strongly discouraged," and grading kept to a minimum.
  • Height. "No dwelling, building or structure shall have more than two stories." On a terraced pad the limit is "40 feet measured from the lowest finished floor level, excluding any basement areas."
  • Subdivisions. Each new lot needs "some portion that does not contain steep hillsides" big enough for a home, and later encroachment on a lot is counted against the original subdivision. Cluster subdivisions under Chapter 9.170 are "encouraged."

The share of the steep slope land that may be disturbed depends on how much of the lot is steep:

Share of the lot in steep slope land Largest share of the steep land that may be disturbed
75% or less 10%
More than 75% to 80% 12%
More than 80% to 85% 14%
More than 85% to 90% 16%
More than 90% to 95% 18%
More than 95% to 100% 20%

Source: Table 9.190.060-1, Menifee Development Code Article 4, PDF file dated 8-15-24. "An additional 2% may be added" where the existing development area is not contiguous or has no direct access to a public right-of-way.

As VanPlex arithmetic, on a 5-acre RR5 lot with 4 acres of steep slope land, 80 percent of the lot is steep, so up to 12 percent of the 4 acres, or 0.48 acre, may be disturbed. The approving authority may grant relief from the standards at a public hearing if the applicant shows an alternative that "complies with and furthers the intent" of the chapter and is "equivalent to or better than" the standards. The chapter also applies the "Menifee Steep Hillside Guidelines" and the hillside section of the Menifee Design Guidelines, which this guide did not read.

Hillside Rules and State Housing Laws

The hillside chapter reaches the state housing routes too. Section 9.296.060 lists Chapter 9.190, Hillside Development Standards, among the chapters that apply to SB 9 two-unit projects, and Section 9.298.040 lists it for small lot subdivisions. An ADU follows the zone standards in Section 9.295.020, and an ADU on a steep site may need the hillside plot plan for its grading. Under state law a city may apply only objective standards to these projects, and the slope and distance limits above are numeric (VanPlex reading). The Steep Hillside Guidelines, if they hold judgment-based design rules, would not bind a ministerial project; ask the City.

The Quail Valley Septic Ban

Quail Valley is a neighborhood of Menifee where many homes use septic tanks. The City's Quail Valley page says that "In 2005 The Santa Ana Regional Water Quality Board placed a moratorium on septic systems in the Quail Valley area due to failing septic tanks contaminating Canyon Lake," and that no new septic systems could be installed "until two areas of the community receive sewer." A moratorium is a temporary ban. The Eastern Municipal Water District later installed sewer in part of subarea 9, and the board amended the rule.

Area Rule since the 2020 amendment
Subareas 4 and 9 New septic tanks prohibited; a sewer connection is required before development of residential zoned land
Subareas 1, 2, 3, 5, 6, 7 and 8 A new septic system may be allowed if no sanitary sewer is available and the system meets an approved Local Agency Management Program or, without one, Tier 1 of the state onsite wastewater policy

Sources: City of Menifee, Quail Valley Moratorium page; Santa Ana Regional Water Quality Control Board, notice "Quail Valley Amendment Is Now in Effect".

The board's notice says "Discharges from new septic systems (also known as Onsite Wastewater Treatment Systems or OWTS) continue to be prohibited in Quail Valley," with the exemptions above. It says the amendment was "approved by the Santa Ana Regional Water Quality Control Board on January 16, 2020," and that the Office of Administrative Law approved it on September 14, 2020. The City page directs owners to Riverside County Environmental Health to find out whether a property can meet the conditions, and the board's notice includes a map of the subareas.

What the Septic Ban Means for New Homes

  • ADUs. Section 9.295.020(E)(2)(p) says ADUs "shall not be permitted in those areas of the city which have significant problems with regard to water availability or quality, sewage disposal or other public health or safety concerns," including areas under a sewer moratorium. In Quail Valley subareas 4 and 9, an ADU needs a sewer connection (VanPlex reading).
  • ADUs on septic elsewhere. An ADU on a septic system needs "a percolation test completed within the last five years," or within 10 years if recertified, and written approval from Riverside County Environmental Health.
  • SB 9 two-unit projects. Section 9.296.060 says two-unit developments "shall be required to connect to sewer and shall not be permitted where sewer is not available." That rule applies citywide, so a septic-only lot anywhere in Menifee cannot use the two-unit route.
  • SB 9 lot splits and small lot maps. Each new parcel must have "separate sewer, water, gas, and electrical utility services" and be able to connect before approval.
  • Hillside utilities. The hillside chapter exempts utility lines, but its exemption leaves out septic systems unless the county certifies that no grading or benching is needed.

Fire Hazard Severity Zones

Fire hazard severity zones are mapped areas rated by fire danger. The minutes of June 18, 2025, printed in the July 16, 2025 packet, record that the City Council "Adopted Ordinance No. 2025-416, approving of the Fire Hazard Severity Zone Maps in the Local Responsibility Areas for the City of Menifee." The City Council agenda of November 19, 2025 then lists an ordinance "Adopting by Reference the 2025 California Fire and California Wildland-Urban Interface Codes" for second reading and adoption. This guide did not read the maps, so it cannot say which lots are mapped.

Route Fire zone rule
SB 9 lot split or two-unit project Excluded in a very high fire hazard severity zone unless the site meets all fire-hazard mitigation measures of the building code; two-unit lots there meet state fire access, water supply and building code rules
Small lot subdivision (Chapter 9.298) The same exclusion; lots in a very high or high fire hazard severity zone meet the same mitigation measures
SB 35 projects (design standards) The site may not be in a very high fire hazard zone
Hillside plot plan A fuel modification plan following the state Board of Forestry defensible space guidelines of February 8, 2006

Sources: Menifee Development Code Sections 9.296.040 and 9.296.060 and Chapter 9.190; Section 9.298.030 and 9.298.040 in Ordinance LR24-0135; Multifamily Objective Design Standards, Section 1.3.

The SB 9 rule in Section 9.296.040 excludes a lot "Within a very high fire hazard severity zone, unless the site complies with all fire-hazard mitigation measures required by applicable building code standards." For two-unit projects in that zone, "Emergency access and water supply requirements shall comply with the California Code of Regulations, Title 14 and Title 24, Part 9," and new structures follow the building code for that zone. The 2025 small lot chapter applies the same measures to lots "in a very high or high fire hazard severity zone."

Where the Code and City Documents Disagree

  • Wrong section numbers in Chapter 9.190. Section 9.190.040 requires a plot plan for development "that is not exempt per Section 9.155.020"; the exemptions are in Section 9.190.030. Section 9.190.060 cites "Table 9.90.060-1" for the table numbered 9.190.060-1, and Section 9.190.070 grants relief from "Section 9.290.060," which is the wireless facilities chapter. Read each as the hillside section (VanPlex reading).
  • Hillside pointer in the SB 9 and small lot chapters. Sections 9.296.040 and 9.298.030 send lots in the "Hillside Overlay" to "Chapter 9.195," which is Landscaping Standards.
  • Date of the Quail Valley amendment. The City page says the water board "passed an amendment" on September 14, 2020. The board's notice gives January 16, 2020 for the board's approval and September 14, 2020 for approval by the Office of Administrative Law, the date the amendment took effect.

Best For

  • ✓ Hillside lots where the building pad stays 50 feet from the top of steep slopes and 200 feet from ridgelines, which are exempt from Chapter 9.190.
  • ✓ Quail Valley lots in subareas 1, 2, 3, 5, 6, 7 and 8 with no sewer available, where a septic system meeting county rules may be allowed.
  • ✓ Rural sites of five or more lots, where a cluster subdivision keeps building on the flatter land.

Usually Fails When

  • ✕ An ADU or SB 9 project is planned in Quail Valley subarea 4 or 9 without a sewer connection.
  • ✕ A two-unit SB 9 project is planned on any lot with no sewer service.
  • ✕ A hillside home is designed with three stories, which Section 9.190.060 prohibits.

What To Verify Before Spending Money

  • → Whether the lot is on the Menifee Hillside Map and how much of it is steep slope land.
  • → The Quail Valley subarea of the lot and whether sewer is available, with Eastern Municipal Water District and Riverside County Environmental Health.
  • → Whether the lot is in a very high or high fire hazard severity zone on the maps adopted in June 2025.

Where to Go Next

Related on VanPlex: the Menifee overview, the California SB 9 page and the California ADU law page.

Frequently Asked Questions

What are the hillside rules in Menifee, California? +
Menifee Chapter 9.190 applies to sites with steep slopes, hillsides and ridgelines on the Menifee Hillside Map, typical of the RM and RR5 zones. Development that is not exempt needs a plot plan. Land within 200 feet horizontally and 50 feet vertically of a ridgeline may not be disturbed, graded slopes are limited to 30 feet, and buildings are limited to two stories.
What is a steep slope in Menifee? +
Menifee Article 6 defines a steep slope as land with a natural gradient of at least 25 percent, meaning 25 feet of vertical distance for every 100 feet of horizontal distance, and a vertical elevation of at least 50 feet. The hillside slope analysis sorts land into four bands: 0 to 24, 25 to 34, 35 to 50 and over 50 percent.
How much of a steep slope can I grade in Menifee? +
Menifee Table 9.190.060-1 lets a project disturb 10 percent of its steep slope land when 75 percent or less of the lot is steep, rising in steps to 20 percent when more than 95 percent is steep. Another 2 percent may be added where the existing development area is not contiguous or lacks direct access to a public right-of-way.
Is my Menifee hillside lot exempt from the hillside rules? +
A Menifee project is exempt from Chapter 9.190 if it stays at least 50 feet from the top of any steep slope and at least 200 feet horizontally and 50 feet vertically from prominent ridgelines, under Section 9.190.030. Projects with valid approvals consistent with the rules before December 18, 2013, City open space and trails, and some roads and utilities are also exempt.
Can I install a septic system in Quail Valley in Menifee? +
Only in some subareas. The Santa Ana Regional Water Quality Control Board still prohibits new septic systems in Menifee's Quail Valley. Since the 2020 amendment, lots in subareas 1, 2, 3, 5, 6, 7 and 8 may qualify for an exemption if no sewer is available and the system meets county rules. Subareas 4 and 9 must connect to sewer.
Can I build an ADU in Quail Valley in Menifee? +
Only where the septic or sewer rules allow it. Menifee Section 9.295.020 bars ADUs in areas with sewage disposal problems, including areas under a sewer moratorium, and an ADU on septic needs a percolation test from the last five years. In Quail Valley subareas 4 and 9, plan for a sewer connection, and check with Riverside County Environmental Health.
Can I use SB 9 on a lot with a septic tank in Menifee? +
Not for a two-unit project. Menifee Section 9.296.060 requires SB 9 two-unit developments to connect to sewer and bars them where sewer is not available. An SB 9 lot split also needs separate sewer, water, gas and electric service for each new parcel. A lot on septic would need a sewer connection first.
How tall can a house be on a Menifee hillside? +
A Menifee house on a hillside site may have no more than two stories under Section 9.190.060. On a terraced building pad the maximum height is 40 feet measured from the lowest finished floor, not counting a basement. A roof must also stay at least 20 feet horizontally from a natural or graded steep slope.
Does Menifee have fire hazard severity zones? +
Yes. The Menifee City Council adopted Ordinance No. 2025-416 on June 18, 2025, approving the Fire Hazard Severity Zone Maps for the Local Responsibility Areas, and a November 19, 2025 agenda lists adoption of the 2025 California Fire and Wildland-Urban Interface Codes. Check the maps for the lot, because the zone affects SB 9 and small lot projects.
Can I build SB 9 homes in a Menifee very high fire hazard zone? +
Only if the site meets the fire rules. Menifee Section 9.296.040 excludes SB 9 projects in a very high fire hazard severity zone unless the site complies with all fire-hazard mitigation measures of the building code. Two-unit projects there must meet state rules for emergency access and water supply in Title 14 and Title 24, Part 9.
What does a Menifee hillside plot plan application need? +
A Menifee hillside plot plan under Section 9.190.050 needs a site plan by a licensed surveyor or civil engineer, a grading plan, a topographic map with contours no more than 10 feet apart, a slope analysis, biological and cultural reports, photographs, erosion, landscape, lighting and architectural plans, a visual analysis and a fuel modification plan.

Official sources (checked October 2026)

General information, not legal advice. California housing law changes every year, and each city adds its own rules on top of state law. Confirm current requirements with the city or county planning department, and with a California-licensed attorney or architect, before you buy land or file plans.

Planning a multiplex in Menifee?

VanPlex builds multiplexes in British Columbia, Canada. For a lot in Menifee, our team makes a custom proforma by hand and emails it to you in 24 to 48 hours.

Get a proforma for your address