Menifee, California Multiplex Rules 2026: Zoning, Lot Sizes, ADUs, SB 9, Three or More Homes, Hillside and Septic Rules, Permits and Fees

This guide covers the City of Menifee, California, a city of 118,592 people in Riverside County. Its zoning rules are Title 9 of the Menifee Municipal Code, the Development Code, which the City publishes as six article PDFs whose file names carry the date 8-15-24. One later ordinance changed them: Municipal Code Amendment No. LR24-0135, adopted by the City Council on July 16, 2025. This guide reads the PDFs and that ordinance together. Three facts shape a project here. Since the 2025 change, duplexes and apartments are allowed by zone only in LMDR, MDR, MHDR and HDR. Much of the city lies in 19 specific plans with their own rules. And parts of Quail Valley remain under a state ban on new septic systems. The seven guide pages below cover each topic in depth.

Menifee in six facts

Menifee Guide Pages

Start With State Law

Five state laws set the minimum Menifee must allow. SB 9 (2021) allows two main homes on a lot in a single-family zone, a split into two lots, or both, approved by staff with no hearing. ADU law sets the accessory dwelling units (ADUs), second homes on a lot, and junior ADUs a city must allow. SB 684 and SB 1123 allow maps of up to 10 lots with 10 homes. The state density bonus gives extra homes to projects that include affordable homes. And SB 79, the 2025 law on housing near transit, does not reach Menifee yet: HCD, the state housing department, says in its advisory that it "will take effect on July 1, 2026, in Alameda, Los Angeles, Sacramento, San Francisco, San Mateo, Santa Clara, and San Diego Counties."

Menifee has written the first four into Title 9. ADUs are in Section 9.295.020, SB 9 in Chapter 9.296 (added in 2024), the density bonus in Chapter 9.180, and SB 684 and SB 1123 in Chapter 9.298, added by the 2025 ordinance. Parts of the ADU section still repeat state law as it stood before 2024. Where the City text and today's statutes differ, the guide pages say so and note that the statute controls.

Menifee in Numbers

The US Census Bureau's Vintage 2025 city file estimates 118,592 people in the City of Menifee on July 1, 2025. The 2020 estimates base is 102,526, so the city grew by 16,066 people, or 15.7 percent (VanPlex arithmetic), and the 2024 estimate is 116,618. In that file Menifee is the 55th largest city in California, after Antioch (118,958) and ahead of Temecula (114,865). Riverside County has 2,544,916 people, so the City holds 4.7 percent of them (VanPlex arithmetic: 118,592 divided by 2,544,916).

The City's 2021-2029 Housing Element, the part of the General Plan that plans housing for each income level, lists the sites where affordable projects on HDR land are approved by right. The Development Code points to "Figure B-1 and Table B-12 of Appendix B" for that list. This guide did not read the Housing Element, so no site count or housing target is given here.

The Ways to More Homes Compared

Way Where Homes Approval
ADU and junior ADU All residential and rural zones One ADU and one junior ADU on a house lot; ADUs up to 1,500 sq ft; up to 8 detached ADUs on a lot with existing apartments Building permit, ministerial, 60 days
SB 9 two-unit project Single-family zones Two homes of 500 to 800 sq ft each Director, ministerial, 60 days
SB 9 urban lot split Single-family zones Two lots of at least 1,200 sq ft and 40% each; two homes on each Director, ministerial, 60 days
Duplex or apartments LMDR, MDR, MHDR, HDR 5 to 24 homes per acre by zone Minor Plot Plan (6 or fewer) or Major Plot Plan
Corridor zone apartments Five Economic Development Corridor zones Mixed use, General Plan density Conditional use permit
SB 35, AB 2011, by-right HDR sites Qualifying sites Affordable or mixed-income projects Ministerial review
Density bonus Projects with affordable homes Up to 50% more homes; 80% if fully affordable With the project
Small lot subdivision (SB 684 / SB 1123) Multifamily lots to 5 acres; vacant single-family lots to 1.5 acres Up to 10 lots and 10 homes Ministerial, Chapter 9.298

Sources: Menifee Development Code Article 3, Article 4 and Article 5, PDFs dated 8-15-24, as amended by Ordinance LR24-0135; Government Code 65852.21, 66411.7, 65915 and 66499.41.

Zones That Allow Homes

Menifee has six agricultural and rural zones (AG, RM, RR5, RR2, RR1 and RR1/2) and six residential zones. LDR-1 and LDR-2 need lots of 10,000 and 7,200 square feet. LMDR, MDR, MHDR and HDR are set by density: 5 to 8, 8 to 14, 14 to 20 and 20 to 24 homes per acre. Since July 2025 duplexes and apartments are permitted only in those four; the 2025 ordinance removed duplexes from LDR-1 and LDR-2. Five Economic Development Corridor zones allow apartments mixed with commercial uses, with a conditional use permit. Nineteen specific plans, from Audie Murphy Ranch to Town Center, set their own zones. See the zoning districts page.

Lot Sizes and Dividing Land

Residential lots run from 3,000 square feet in MHDR and HDR to 10,000 in LDR-1; rural lots from one-half acre to 10 acres. Chapter 9.296 sets the SB 9 urban lot split: two lots "of approximately equal size," each at least 40 percent of the original and 1,200 square feet, each with 24 feet of street frontage, decided within 60 days. The new Chapter 9.298 allows small lot maps of up to ten lots, with lots as small as 600 square feet on multifamily land. Title 7, the subdivision ordinance, is published on a host this guide could not read. See the lot size and subdivisions page.

House Lots: ADUs and SB 9

Section 9.295.020 allows a new attached or detached ADU of up to 1,500 square feet, 18 feet tall when detached, with side and rear setbacks of no more than four feet, approved through building plan check within 60 days. The City offers eight permit-ready ADU plans from 306 to 1,198 square feet. SB 9 two-unit projects allow two homes of 500 to 800 square feet each, require a sewer connection, and may not be sold separately. See the ADUs and SB 9 page.

Three or More Homes

A residential project of up to six homes goes to staff as a Minor Plot Plan where streets and utilities are in place; more than six needs a Major Plot Plan and a Planning Commission hearing. Projects follow the City's Multifamily Objective Design Standards, adopted April 6, 2022. Apartments need 1.00 to 2.50 parking spaces per unit by bedroom count plus one guest space per 10 units. See the three or more homes page.

Parking, Setbacks and Height

Residential front yards are 15 feet, with 20 feet in front of a street-facing garage. Buildings may be 40 feet tall in LDR-1 to MDR and 50 feet in MHDR and HDR, with 50 to 60 percent building coverage. A house needs two parking spaces in a two-car garage at least 20 by 20 feet. See the parking, setbacks and height page.

Hillsides, Quail Valley and Fire Zones

Chapter 9.190 limits building on steep slopes and ridgelines: no disturbance within 200 feet horizontally and 50 feet vertically of a ridgeline, between 10 and 20 percent of the steep land disturbed, and homes of two stories at most. In Quail Valley the Santa Ana Regional Water Quality Control Board still prohibits new septic systems, with exemptions since 2020 in seven subareas. The City Council approved Fire Hazard Severity Zone maps in June 2025. See the hillside, Quail Valley and fire zones page.

Permits and Fees

The Director decides ministerial permits, the Planning Commission most discretionary ones, and the City Council legislative changes. The Director must rule on completeness within 30 days. City impact fees for July 1, 2026 to June 30, 2027 total $13,560 per single-family home and $8,322 per multi-family home, before storm drain, habitat and school fees, and the planning fee schedule adds a 5.7 percent technology fee. See the permits and fees page.

How Current the Code Is

The City page on the Development Code says the City Council adopted it on December 18, 2019 (Ordinance No. 2019-289) and that it "became effective January 17, 2020," and links an interactive version and a list of amending ordinances ending with Ordinance No. 2024-384. The interactive version loads its text with a script and was not read. The six article PDFs were read in full on October 11, 2026.

Item What the City documents show
Article 1: General Provisions PDF, file dated 8-15-24, 18 pages
Article 2: Administration, Permits and Procedures PDF, file dated 8-15-24, 77 pages
Article 3: Zones PDF, file dated 8-15-24, 47 pages
Article 4: Site Development Regulations and Performance Standards PDF, file dated 8-15-24, 113 pages
Article 5: Special Use Standards PDF, file dated 8-15-24, 68 pages
Article 6: Definitions PDF, file dated 8-15-24, 46 pages
Latest ordinance in the history notes No. 2024-384, adopted February 7, 2024
Later Title 9 text ordinance LR24-0135, introduced June 18 and adopted July 16, 2025

Sources: City Development Code page; the six article PDFs, for example Article 3; Ordinance No. 2024-384; City Council minutes of July 16, 2025.

To check for changes after the PDFs, VanPlex searched the agendas of 69 City Council meetings from January 2024 to October 7, 2026 on the City's agenda system. Only LR24-0135 changes the text of Title 9. Other ordinances in that period rezone named sites or amend named specific plans, and one amends improvement security rules in Title 7. These are the ordinances behind the rules on the guide pages:

Ordinance Date Subject
Ord. No. 2019-289 December 2019 (see differences below) The Development Code, Title 9, effective January 17, 2020
Ord. No. 2022-338 April 6, 2022 SB 35 multi-family ministerial review, Chapter 9.87
Ord. No. 2022-351 September 21, 2022 Comprehensive code clean-up, including the hillside chapter
Ord. No. 2023-370 April 19, 2023 Housing Element Program Action 5; its history note is on the residential use table
Ord. No. 2024-384 February 7, 2024 Housing update: ADUs, SB 9 chapter, density bonus, AB 2011
LR24-0135 July 16, 2025 Zones, ADUs, SB 9, small lot subdivisions, parking, accessory structures
Ord. No. 2025-416 June 18, 2025 Fire Hazard Severity Zone maps for Local Responsibility Areas

Sources: City Development Code page; history notes in the article PDFs; Ordinance LR24-0135 and the June 18, 2025 minutes printed in the same packet.

Recent City Council Actions

  • June 18, 2025. The minutes record the introduction of the ordinance approving LR24-0135, the adoption of Ordinance No. 2025-416 on fire hazard maps, and the 2025 fee adjustments.
  • July 16, 2025. The minutes record LR24-0135 "Adopted as Part of Consent" by a 5-0 vote.
  • November 19, 2025. The agenda lists adoption of the 2025 California Fire and Wildland-Urban Interface Codes and a $20,000 regional grant for the "Permit-Ready Accessory Dwelling Unit Plans Update."
  • April 15, 2026. The agenda lists an ordinance on Title 7 improvement security and an ordinance adding construction cost index adjustments to the regional transportation fee.
  • June 3 and June 17, 2026. The agendas list an update of the permit-ready ADU plans to the 2025 building codes and the 2026 fee and impact fee adjustments.
  • July 15 and October 7, 2026. The agendas list the Menifee North Specific Plan amendment and zone change for the Heritage Valley Business Center for adoption, and the introduction of Menifee Village Specific Plan Amendment No. 7.

Agenda listings are published before each meeting; only the July 16, 2025 and June 18, 2025 minutes were read for votes.

Where the Code, City Documents and State Law Differ

  • Junior ADU owner occupancy. Section 9.295.020 asks for an owner-occupancy covenant for every junior ADU; Government Code 66333 requires it only where the junior ADU shares sanitation facilities.
  • ADU impact fee threshold. The City exempts ADUs "less than 750 square feet"; Government Code 66311.5 exempts 750 square feet or less.
  • ADU guidebook. The June 2026 guidebook prints a 1,200 square foot maximum and a 16-foot height; the code says 1,500 square feet and 18 feet.
  • Small lot home size. Chapter 9.298 caps each home at 1,750 square feet; Government Code 66499.41 applies 1,750 to the average.
  • Density bonus. The City table stops at 50 and 80 percent; the 2026 statute adds a further bonus.
  • Section numbers. Table 9.120.020-1 gives zone chapters as 9.25 to 9.55 instead of 9.125 to 9.155; Chapter 9.190 cites Sections 9.155.020 and 9.290.060 and Table 9.90.060-1; Chapters 9.296 and 9.298 send hillside lots to Chapter 9.195.
  • Adoption date of the code. The City Development Code page says the City Council adopted the code on December 18, 2019; the recitals of Ordinance LR24-0135 say the Council adopted Ordinance No. 2019-289 on December 4, 2019. The City page also gives the effective date, January 17, 2020.
  • Fee documents. The impact fee memo prints the single-family total as $13,560 on page 1 and $13,561 on page 2, and two rows of the application fee table show totals lower than their amounts.

Limits of This Guide

Not read: the interactive code viewer, Title 7 (published only on a host that refused the one request that reached it), the zoning map, the General Plan and Housing Element, the 19 specific plans and the planned development resolutions, the Steep Hillside Guidelines and Design Guidelines, the fire hazard maps, the engineering, building and fire fee schedules, the TUMF amounts, school fees, and staff reports other than the LR24-0135 item. Minutes were read only for June 18 and July 16, 2025.

Ask the Planning Division, which the City lists at 951-723-3741, which zone, specific plan and standards apply to your lot, and whether an ordinance newer than October 7, 2026 is in force.

Best For

  • ✓ MHDR and HDR lots, where apartments are permitted, buildings may reach 50 feet, and projects of up to six homes go to staff.
  • ✓ House lots with sewer service, where a detached ADU of up to 1,500 square feet and a junior ADU can be added through building plan check.
  • ✓ Single-family lots of 2,400 square feet or more, which can be split under SB 9 into two lots of at least 1,200 square feet, each with 24 feet of street frontage.

Usually Fails When

  • ✕ A duplex or apartment is planned in LDR-1 or LDR-2 from the 8-15-24 PDF, which predates the July 2025 change.
  • ✕ An ADU or SB 9 project is planned in Quail Valley subarea 4 or 9 without a sewer connection.
  • ✕ A lot inside one of the 19 specific plans is planned from the Title 9 tables alone.

What To Verify Before Spending Money

  • → The zone, General Plan designation and any specific plan or planned development for the lot, with the Planning Division.
  • → Whether the lot is on the Hillside Map, in a fire hazard severity zone or in a Quail Valley subarea.
  • → The impact, storm drain, habitat, school and transportation fees for the project.

Where to Go Next

Related on VanPlex: the California ADU law page, the California impact fees page and the California SB 684 and SB 1123 page.

Frequently Asked Questions

How many people live in Menifee, California? +
The US Census Bureau estimates 118,592 people in the City of Menifee, California on July 1, 2025, in its Vintage 2025 city file, against an April 2020 estimates base of 102,526. In that file Menifee ranks 55th among California cities, after Antioch at 118,958 and ahead of Temecula at 114,865. Riverside County as a whole has 2,544,916 people.
Where can I read the Menifee zoning code? +
The Menifee zoning code is Title 9 of the Municipal Code, the Development Code. The City posts it as six article PDFs whose file names carry the date 8-15-24 and links an interactive version from its Municipal/Development Code page. The PDFs do not include Ordinance LR24-0135 of July 16, 2025, which is in that meeting's City Council packet.
What changed in the Menifee Development Code in July 2025? +
Menifee Municipal Code Amendment No. LR24-0135, adopted July 16, 2025, changed 24 chapters of Title 9. It removed duplexes from LDR-1 and LDR-2 and apartments from LDR-2, added a 60-day deadline to SB 9, raised the number of detached ADUs allowed on apartment lots, added Chapter 9.298 for small lot subdivisions, and changed parking and accessory structure rules.
What is the easiest way to add a home to a Menifee house lot? +
On a Menifee house lot with sewer service, an ADU has the fewest steps. Section 9.295.020 approves ADUs through building plan check within 60 days, allows up to 1,500 square feet, and requires side and rear setbacks of no more than four feet. Using one of the eight permit-ready ADU plans skips building plan check.
Which state housing laws apply in Menifee, California? +
SB 9, state ADU law, the SB 684 and SB 1123 small lot map law, the density bonus, SB 35 and AB 2011 all apply in Menifee, and the City has written each into Title 9. SB 79 does not apply yet: HCD says it took effect on July 1, 2026 in seven counties, and Riverside County is not among them.
Can I build apartments in Menifee? +
Yes, in four Menifee residential zones. Since July 2025, Table 9.130.030-1 permits multiple family homes in LMDR, MDR, MHDR and HDR, at 5 to 24 homes per acre by zone. Projects of up to six homes go to staff as a Minor Plot Plan where streets and utilities are in place, and larger ones to the Planning Commission.
What should I check before buying a Menifee lot to add homes? +
Check the zone of the Menifee lot and whether it lies in one of the 19 specific plans or seven planned developments, which set their own rules. Then ask whether it is on the Hillside Map, in a fire hazard severity zone, or in a Quail Valley septic subarea, and whether it has sewer service and has had a tenant in the last three years.
Does Menifee allow septic systems for new homes? +
It depends on the route and the area. An ADU on septic needs a percolation test from the last five years, and SB 9 two-unit projects must connect to sewer. In Quail Valley the Santa Ana Regional Water Quality Control Board still bans new septic systems, with exemptions since 2020 in subareas 1, 2, 3, 5, 6, 7 and 8 where no sewer is available.
How much are impact fees on a new home in Menifee? +
Menifee City development impact fees for July 1, 2026 to June 30, 2027 total $13,560 per single-family home and $8,322 per multi-family home, covering animal shelter, general government, fire, law enforcement, parks and transportation. Storm drain fees by area, the habitat fee, school district fees and the regional transportation fee are added, and ADUs of 749 square feet or less pay no City impact fees.
Who do I ask about a zoning question in Menifee? +
Ask the Menifee Community Development Department, Planning Division, which the City lists at 951-723-3741 for general inquiries. City Hall is at 29844 Haun Road, Menifee, CA 92586. The Planning Division confirms the zone, any specific plan and the standards for a lot, and the Building and Safety Division issues building permits.
Is Menifee rewriting its zoning rules? +
Menifee made its last broad change to Title 9 with Ordinance LR24-0135 in July 2025, and City Council agendas through October 7, 2026 list no newer Title 9 text amendment. The agendas do list specific plan amendments for named sites, a 2026 update of the permit-ready ADU plans, and Quimby park fee changes as a future item targeted for Winter 2027.

Official sources (checked October 2026)

City of Menifee, Municipal/Development Code and Design Guidelines page
https://www.menifee.ca.gov/494/MunicipalDevelopment-Code-and-Design-Gui
Menifee Development Code, Article 3: Zones (City PDF, file dated 8-15-24)
https://www.menifee.ca.gov/DocumentCenter/View/20967/Article-3-Zones_8-15-24
Menifee Development Code, Article 5: Special Use Standards (City PDF, file dated 8-15-24)
https://www.menifee.ca.gov/DocumentCenter/View/20968/Article-5-Special-Use-Standards_8-15-24
City of Menifee, City Council packet of July 16, 2025, item 10.6: Municipal Code Amendment No. LR24-0135 (PDF)
https://cityofmenifee.primegov.com/Public/CompiledDocument?compileOutputType=1&meetingTemplateId=11952
City of Menifee, City Council minutes of July 16, 2025 (PDF)
https://cityofmenifee.primegov.com/Public/CompiledDocument?compileOutputType=1&meetingTemplateId=11951
City of Menifee, agendas and minutes (cityofmenifee.primegov.com)
https://cityofmenifee.primegov.com/public/portal
City of Menifee, Development Code Article 1: General Provisions (PDF, file dated 8-15-24)
https://www.menifee.ca.gov/DocumentCenter/View/20966/Article-1-General-Provisions_8-15-24
City of Menifee, Development Code Article 2: Administration, Permits and Procedures (PDF, file dated 8-15-24)
https://www.menifee.ca.gov/DocumentCenter/View/20970/Article-2-Administration-Permits-and-Procedures_8-15-24
City of Menifee, Development Code Article 4: Site Development Regulations (PDF, file dated 8-15-24)
https://www.menifee.ca.gov/DocumentCenter/View/20971/Article-4-Site-Development-Regulations-and-Performance-Standards_8-15-24
City of Menifee, Development Code Article 6: Definitions (PDF, file dated 8-15-24)
https://www.menifee.ca.gov/DocumentCenter/View/20969/Article-6-Definitions_8-15-24
City of Menifee, Ordinance No. 2024-384 (PDF)
https://www.menifee.ca.gov/DocumentCenter/View/20685/Ordinance-No-2024-384---Dev-Code-Amendment-No-LR23-0012
City of Menifee, City Council agenda of June 18, 2025 (PDF)
https://cityofmenifee.primegov.com/Public/CompiledDocument?compileOutputType=1&meetingTemplateId=11991
City of Menifee, City Council agenda of July 16, 2025 (PDF)
https://cityofmenifee.primegov.com/Public/CompiledDocument?compileOutputType=1&meetingTemplateId=11950
City of Menifee, City Council agenda of November 19, 2025 (PDF)
https://cityofmenifee.primegov.com/Public/CompiledDocument?compileOutputType=1&meetingTemplateId=12449
City of Menifee, City Council agenda of April 15, 2026 (PDF)
https://cityofmenifee.primegov.com/Public/CompiledDocument?compileOutputType=1&meetingTemplateId=12788
City of Menifee, City Council agenda of June 3, 2026 (PDF)
https://cityofmenifee.primegov.com/Public/CompiledDocument?compileOutputType=1&meetingTemplateId=12932
City of Menifee, City Council agenda of June 17, 2026 (PDF)
https://cityofmenifee.primegov.com/Public/CompiledDocument?compileOutputType=1&meetingTemplateId=12952
City of Menifee, City Council agenda of July 15, 2026 (PDF)
https://cityofmenifee.primegov.com/Public/CompiledDocument?compileOutputType=1&meetingTemplateId=13040
City of Menifee, City Council agenda of October 7, 2026 (PDF)
https://cityofmenifee.primegov.com/Public/CompiledDocument?compileOutputType=1&meetingTemplateId=13248
City of Menifee, Permit Ready ADU program page
https://www.menifee.ca.gov/751/Permit-ready-ADU-program
City of Menifee, Quail Valley Moratorium page
https://www.menifee.ca.gov/663/Quail-Valley-Moratorium
City of Menifee Planning Division, Application Fees FY26/27 (PDF)
https://www.menifee.ca.gov/DocumentCenter/View/25561/APPLICATION-FEES---FY26-27
City of Menifee, Development Impact Fees Schedule July 1, 2026 to June 30, 2027 (PDF)
https://www.menifee.ca.gov/DocumentCenter/View/25562/Development-Fee-Memo---DIF-MSHCP-FY26-27
US Census Bureau, Vintage 2025 city population estimates (CSV)
https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/cities/totals/sub-est2025_6.csv
HCD, SB 79 advisory, March 20, 2026 (PDF)
https://www.hcd.ca.gov/sites/default/files/docs/planning-and-community/sb-79-mpo-advisory.pdf
Government Code 65852.21 (SB 9 two-unit projects)
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV&sectionNum=65852.21
Government Code 66411.7 (SB 9 urban lot splits)
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV&sectionNum=66411.7
Government Code 66323 (ADUs a city must approve)
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV&sectionNum=66323
Government Code 66499.41 (SB 684 and SB 1123)
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV&sectionNum=66499.41
Government Code 65915 (state density bonus)
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV&sectionNum=65915
General information, not legal advice. California housing law changes every year, and each city adds its own rules on top of state law. Confirm current requirements with the city or county planning department, and with a California-licensed attorney or architect, before you buy land or file plans.