Cities | San Marcos
San Marcos, California Multiplex Rules 2026: Zoning, Lot Sizes, ADUs, SB 9, Three or More Homes, Ridgelines and Hillsides, Permits and Fees
This guide covers the City of San Marcos in San Diego County, California, a city of 94,908 people. A city of the same name in Texas has its own code. Three facts matter most for a project in San Marcos. The R-2 zone permits duplexes and 3-unit or 4-unit buildings that look like a house, at up to 12 homes per gross acre, and the R-3 zones allow 20 or 30. Every attached project in R-2 and R-3 needs a Planning Commission hearing, and an inclusionary housing rule reaches projects of one or more units. And much of the city is on hills, where a ridgeline overlay and slope-based lot sizes limit what can be built. The seven guide pages below cover each topic in depth.
San Marcos in six facts
- The US Census Bureau estimates the population of the City of San Marcos, California at 94,908 on July 1, 2025. Source: US Census Bureau, Vintage 2025
- The City Council rewrote the zoning code, Title 20, with Ordinance 2025-1568 on December 9, 2025, and Municode includes it. Source: San Marcos Municipal Code, supplement history table
- R-2 permits duplexes and 3-unit or 4-unit buildings that look like a house, at up to 12 homes per gross acre. Source: San Marcos Municipal Code, Tables 20.215-2 and 20.215-3
- An ADU may have 850 square feet with one bedroom or 1,000 with more, and a detached ADU may be 16 feet tall. Source: San Marcos Municipal Code 20.410.060(C)
- An SB 9 lot split creates two lots of at least 1,200 square feet each, decided by the City Engineer within 50 calendar days. Source: San Marcos Municipal Code 19.44.050 and 19.44.100
- Rental projects of more than six units must reserve 15 percent of the units for lower-income households or pay an in-lieu fee. Source: San Marcos Municipal Code 20.310.040(B)
San Marcos Guide Pages
Start With State Law
Five state laws set the minimum San Marcos must allow. SB 9 (2021) allows two main homes on a lot in a single-family zone, a split into two lots, or both, approved by staff with no hearing. ADU law sets the accessory dwelling units (ADUs), second homes on a lot, and junior ADUs a city must allow. SB 684 and SB 1123 allow maps of up to 10 lots with 10 homes. The state density bonus gives extra homes to projects that include affordable homes. And SB 79, the 2025 law on housing near transit, reaches San Diego County: HCD, the state housing department, says in its advisory that its upzoning "will take effect on July 1, 2026, in Alameda, Los Angeles, Sacramento, San Francisco, San Mateo, Santa Clara, and San Diego Counties."
San Marcos writes most of these into its own code. SB 9 two-unit projects are in Chapter 20.470 and SB 9 lot splits in Chapter 19.44, both from Ordinances 2021-1510 and 2021-1511. ADUs are in Chapter 20.410, which opens by saying that where it conflicts with the Government Code, "State Government Code shall prevail." The density bonus is in Chapter 20.305. VanPlex found no local chapter for SB 684 and SB 1123 maps or for SB 79, so those statutes apply on their own terms. San Marcos is a charter city, and the SB 9 statutes define a local agency as a city "whether general law or chartered", so they apply here either way.
San Marcos in Numbers
The US Census Bureau's Vintage 2025 city file estimates 94,908 people in the City of San Marcos on July 1, 2025. The April 2020 estimates base is 94,860, so the city grew by 48 people, or 0.05 percent (VanPlex arithmetic), and the 2025 figure is 616 below the 2024 estimate of 95,524. In that file San Marcos is the 82nd largest city in California, after Manteca (96,693) and ahead of Indio (94,269). San Diego County has 3,282,248 people, so the City holds 2.9 percent of them (VanPlex arithmetic: 94,908 divided by 3,282,248).
The Ways to More Homes Compared
| Way | Where | Homes | Approval |
|---|---|---|---|
| ADU and junior ADU | Every zone that allows homes | One ADU and one junior ADU on a house lot; more on an apartment lot under state law | Building permit, ministerial; 60 days |
| SB 9 second unit | Single-family zones | Two main homes, the new one up to 800 sq ft | Ministerial; 60 days under state law |
| SB 9 urban lot split | Single-family zones | Two lots, up to four units in total | City Engineer; 50 days in City code |
| R-2 duplex to fourplex | R-2 | Up to 12 per gross acre in house-like buildings of up to 4 units | Site plan review by the Planning Commission |
| Apartments and townhomes | R-3-10, R-3-6, MU-1, MU-2 | 20 to 45 per acre by zone | Planning Commission; City Council at 10 or more units |
| Planned residential development | Any residential zone | Zone density on smaller lots with 40% open space | Conditional use permit or site plan review |
| Starter homes (SB 684, SB 1123) | Multifamily lots up to 5 acres; vacant single-family lots up to 1.5 acres | Up to 10 lots and 10 homes | Ministerial under state law; 60 days |
| Density bonus | Projects of 5 or more units with affordable homes | Bonus under Government Code 65915 | City Council review |
Sources: San Marcos Municipal Code Chapter 20.215, 20.225, 20.305, 20.410, 20.435, 20.470 and 19.44; Government Code 66499.41 and 65915.
Zones That Allow Homes
San Marcos has six residential zones: R-1-20 at 2.0 homes per gross acre, R-1-10 at 4.0, R-1-7.5 at 6.0, R-2 at 12.0, R-3-10 at 20 and R-3-6 at 30. The R-1 zones permit single-family detached homes, R-2 adds attached homes, duplexes and house-like buildings of up to four units, and the R-3 zones permit apartments. MU-1 and MU-2 allow 20 to 45 homes per acre. The code gives three different densities for R-1-7.5. See the zoning districts page.
Lot Sizes and Dividing Land
New lots need 20,000 square feet in R-1-20, 10,000 in R-1-10, 7,500 in R-1-7.5 and 3,500 in R-2 on flat land, and up to one acre on steep slopes. The City Engineer decides maps of four or fewer lots within 50 calendar days, and the Planning Commission decides larger maps. SB 9 lot splits follow Chapter 19.44. See the lot size and subdivisions page.
House Lots: ADUs and SB 9
Chapter 20.410 allows ADUs of 850 to 1,000 square feet, 16 feet tall when detached, with 4-foot side and rear setbacks, decided within 60 days. Chapter 20.470 caps SB 9 units at 800 square feet and 16 feet, and limits a parcel to four units in all. Several City rules are stricter than today's statutes, and the page names each one. See the ADUs and SB 9 page.
Three or More Homes
Multifamily projects need common open space of 30 percent of the livable ground floor area, a tot lot for every 25 units, and 2 parking spaces per unit of two or more bedrooms plus guest spaces. Rental projects of more than six units reserve 15 percent of units as affordable or pay a fee. See the three or more homes page.
Parking, Setbacks and Height
Homes in the R-1 and R-2 zones may be 35 feet or 2 stories. Front setbacks run from 35 feet in R-1-20 to 10 feet in R-2, and roads in the General Plan add setbacks of 77 or 86 feet from the centerline. A house of up to 3,000 square feet needs two attached covered spaces. See the parking, setbacks and height page.
Ridgelines, Hillsides and the Airport
The Ridgeline Overlay Zone bars buildings within 100 vertical feet of a primary ridgeline, caps buildings at 28 feet, and needs a Planning Commission permit for two or more main buildings near a ridgeline. Land in the McClellan-Palomar Airport Influence Area goes through site plan review even for a building permit. See the ridgelines, hillsides and airport page.
Permits and Fees
The Director answers on completeness within 30 days, and appeals are due within 10 days. Public facilities fees, a park fee and, where a school district finds overcrowding, school fees are set by City Council resolution. VanPlex could not read the fee resolutions, so the page gives each fee's timing without amounts. See the permits and fees page.
How Current the Code Is
Municode's reader for San Marcos names the current edition "Supplement 14 Update 1." Its supplement history table ends with Ordinance 2026-1577 of March 10, 2026, which amended the Davia Village-MARC Specific Plan and is marked "Omit", meaning it was not added to the code text. The comprehensive zoning update, Ordinance 2025-1568 of December 9, 2025, is marked "Include" in Supplement 13, and its history notes appear on the residential, growth management and ridgeline chapters. Municode's ordinance records show nothing adopted after March 10, 2026.
| Item | What the record shows |
|---|---|
| Code edition | Municode, client 4211, "Supplement 14 Update 1" |
| Last ordinance in the supplement table | Ordinance 2026-1577, March 10, 2026 (Davia Village-MARC Specific Plan, omitted) |
| Zoning rewrite | Ordinance 2025-1568, December 9, 2025, included in Supplement 13 |
| ADU chapter | Chapter 20.410, last amended by Ordinance 2024-1551, September 24, 2024 |
| SB 9 chapters | Chapter 20.470 and Chapter 19.44, Ordinances 2021-1510 and 2021-1511 |
| Inclusionary housing | Chapter 20.310, Ordinance 2024-1550, September 10, 2024 |
| Development fees chapter | Chapter 17.44, rewritten by Ordinance 2024-1553, December 2, 2024 |
| City website | Answered 403; no City agenda or fee resolution was read |
Sources: Supplement history table and the history notes in Title 20, Title 19 and Chapter 17.44.
To find changes adopted after the code edition, VanPlex tried the City's own website. It answered the first request with a refusal (HTTP 403), and VanPlex sent no further requests to it. So this guide could not check City Council agendas, staff reports or ordinances adopted after March 10, 2026, including any local rules for SB 79, which took effect in San Diego County on July 1, 2026. Ask the Planning Division whether any zoning, subdivision or fee ordinance newer than Ordinance 2026-1577 is in force before relying on a rule here.
Where the Code, City Documents and State Law Differ
- Junior ADU owner occupancy. Always required in Sections 20.410.020(C) and 20.410.060(O); Government Code 66333(b) requires it only with shared sanitation.
- ADU fee line. No fees "on ADUs smaller than 750 square feet"; Government Code 66311.5 covers 750 square feet or less.
- ADU rental term. "30 days or longer" in the City code; "longer than 30 days" in Government Code 66323(e) and 66333(g).
- SB 9 unit size and height. 800 square feet, 16 feet and one story in Sections 20.470.030 and 19.44.050(L); Government Code 65852.21(b)(3) bars standards that do not apply uniformly in the zone.
- SB 9 denial grounds. Section 19.44.110(D) says "public health and safety of the physical environment"; the statutes allow denial for a specific, adverse impact on public health and safety.
- Ridgeline permits and SB 9. A Planning Commission permit for two or more main structures near a ridgeline, against the ministerial approval SB 9 requires.
- Within the code. R-1-7.5 at 6.0, 8.0 or "4.1-8.0" homes per acre; PRD density of "one (1) to eight (8)" or "four (4) to eight (8)"; R-2 listed under "Single-Family Zones" while it permits multifamily buildings; the Director or the Planning Commission as the ridgeline permit decider; and Planning Commission or both bodies for R-2 and R-3 building permits.
Limits of This Guide
Not read: the Zoning Map and the mixed use Regulating Plan; the General Plan and housing element; adopted specific plans such as San Elijo Hills; the McClellan-Palomar Airport Land Use Compatibility Plan; the ridgeline area maps; the fee resolutions (2024-9385, 2024-9386, 2024-9389), the park fee and inclusionary in-lieu fee resolutions; school district fees; and any City Council action after March 10, 2026. The City's website refused automated requests, so no City page is linked.
Ask the San Marcos Planning Division which zone, overlay and standards apply to your lot, which side of a code conflict it applies, what the current fees are, and whether an ordinance newer than March 10, 2026 is in force.
Best For
- ✓ R-2 lots of 14,520 square feet or more, for a house-like fourplex at 12 homes per gross acre.
- ✓ R-3-6 lots, which allow 30 homes per gross acre and buildings of 45 feet or 3 stories.
- ✓ Flat house lots, where an ADU of 850 to 1,000 square feet needs only a 60-day building permit.
Usually Fails When
- ✕ The lot is in the Ridgeline Overlay Zone or on a steep slope, where setbacks, height and lot size rules tighten.
- ✕ A budget leaves out the inclusionary in-lieu fee, which reaches projects of one or more units.
- ✕ A schedule leaves out the Planning Commission hearing that every attached R-2 and R-3 project needs.
What To Verify Before Spending Money
- → The zone of the lot, and whether it is in the ridgeline or airport overlay.
- → The current fee resolutions and the inclusionary in-lieu fee.
- → Any ordinance adopted after March 10, 2026, including local SB 79 rules.
Where to Go Next
Related on VanPlex: the California ADU law page, the California impact fees page and the California SB 684 and SB 1123 page.
Frequently Asked Questions
How many people live in San Marcos, California?
Where can I read the San Marcos zoning code?
Is San Marcos a charter city?
What is the easiest way to add a home to a San Marcos house lot?
Which San Marcos zones allow fourplexes?
Which state housing laws apply in San Marcos?
What should I check before buying a San Marcos lot to add homes?
Does San Marcos have inclusionary housing rules?
How does the San Marcos ridgeline overlay affect building?
Has San Marcos grown since 2020?
Official sources (checked October 2026)
Planning a multiplex in California?
VanPlex builds multiplexes in British Columbia, Canada. For a lot in California, our team makes a custom proforma by hand and emails it to you in 24 to 48 hours.
Get a proforma for your address