David Babakaiff
Written by David Babakaiff · Co-Founder, VanPlex | 25+ Years BC Construction Last reviewed: October 2026

Cities | Sacramento

Sacramento Missing Middle Housing: Multi-Unit Homes by Right

Sacramento lets owners build duplexes and multi-unit buildings by right on lots zoned for single-family homes. "By right" means the use is allowed in the zone without a rezoning or a use permit. The city also replaced the cap on units per acre with a cap on building floor area. This page covers Ordinance 2024-0027, its building standards, the review process, and how it compares with SB 9 (2021) and the other state laws. For how Sacramento compares with other cities around the world, see VanPlex's Sacramento policy page.

Sacramento in six facts

Start With State Law

The state laws set the minimum here as everywhere in California. SB 9 (2021) allows two primary homes on a lot in a single-family zone, a split into two lots, or both. ADU law sets the accessory dwelling units (ADUs), second smaller homes on the lot, that every city must approve. SB 684 and SB 1123 allow up to 10 lots with 10 homes. And Sacramento County is one of the seven counties where SB 79 took effect July 1, 2026, for buildings of five or more homes near qualifying transit.

Sacramento's own ordinance goes further than SB 9 on the same lots. SB 9 allows two primary homes per lot and needs a lot split to reach four. The Sacramento ordinance sets no maximum number of units in the R-1, R-1A, R-1B and R-2 zones, so an owner can plan a triplex or fourplex on one lot and let the building standards decide the count. SB 9 still matters where its 4-foot side and rear setbacks or its 60-day decision deadline help a project. Three 2026 state laws start January 1, 2027: AB 956 (two detached ADUs), AB 2601 (SB 9 homes and lot splits processed together) and AB 1751 (for-sale townhome projects).

Sacramento in Numbers

The US Census Bureau estimates 536,449 people in the City of Sacramento on July 1, 2025. The California Department of Finance's E-5 estimate for January 1, 2026 counts 539,765 people and 216,076 housing units, of which 19,203 are in buildings of two to four units. The two agencies use different dates and methods.

Ordinance 2024-0027

The City Council passed Ordinance 2024-0027 for publication on September 10, 2024, published it September 13, 2024, and adopted it on September 17, 2024. It took effect October 17, 2024. The vote was 9 to 0: "Ayes: Members Guerra, Jennings, Kaplan, Maple, Talamantes, Thao, Valenzuela, Vang, and Mayor Steinberg Noes: None."

The core rule is short: "The following uses are permitted by right in the R-1, R-1A, R-1B, or R-2 zones ... A. Dwelling, duplex; and B. Dwelling, multi-unit." Lots inside specified airport safety and noise zones are left out. The city's Missing Middle Housing page calls Sacramento "the first in the State to allow multi-unit housing in every neighborhood." That is the city's own description.

The ordinance also covers small single homes. It applies to "Development of a single-unit dwelling on a lot that is between 1,200 and 2,899 square feet," and an owner may choose its standards for a single home on a larger lot. The ordinance is an interim ordinance. On October 5, 2026, the city's page still described it as the active rules for missing middle housing, so check the page for a permanent replacement before you file.

Building Standards

Standard Missing middle rule
Zones R-1, R-1A, R-1B and R-2, outside specified airport safety and noise zones
Uses permitted by right Duplex and multi-unit dwelling
Maximum height 35 feet
Density Minimum set in the General Plan; no maximum
Lot coverage No maximum
Building size Floor area ratio from the General Plan sliding scale (Figure LUP-5)
Minimum lot size 1,200 sq ft
Lot width and depth At least 16 ft wide (31 ft on a corner); at most 160 ft deep
Interior side setback 5 ft; 3 ft on interior lots under 52 ft wide or corner lots under 62 ft wide
Rear setback 15 ft; 4 ft on lots under 2,900 sq ft or backing onto a public alley
Common open space (2 or more units) 125 sq ft per unit or 400 sq ft, whichever is greater, where the maximum FAR is under 2; 75 sq ft per unit or 400 sq ft where it is 2 or more
Parking "With few exceptions, no onsite parking is required by the City code."

Sources: Ordinance 2024-0027, Sections 1, 3, 5 and 6, and the city's Missing Middle Housing page.

Setbacks are the required gaps between a building and the property lines. The ordinance cuts them on small lots: the rear setback drops from 15 feet to 4 feet "If the lot is less than 2,900 square feet, or if the rear lot line abuts a public alley." Common open space works out as follows where the maximum floor area ratio is under 2: a triplex needs 400 square feet (three times 125 is 375, which is less than 400), and a fourplex needs 500 square feet (four times 125).

Floor Area Ratio Replaces Units per Acre

Floor area ratio (FAR) is a building's total floor area divided by the lot area. Ordinance 2024-0027 explains the switch: "Under the 2040 General Plan, floor area ratio (FAR) has replaced maximum density limits as the standard used to regulate development intensity." The General Plan's sliding FAR scale, Figure LUP-5, gives more building area to projects that provide more units.

The city's page explains how to read it: the scale limits the building area allowed, and the unit counts shown on it are the minimum you need to earn the higher FAR. So an owner can split the allowed floor area into more, smaller homes. ADUs do not count toward the minimum unit count or the maximum FAR.

The FAR values sit in Figure LUP-5 of the 2040 General Plan, which is an image in the plan. Read your lot's value there, or ask the Planning Division, before you size a building.

Adding ADUs to a Missing Middle Project

State ADU law and the Sacramento FAR rule work well together. The city says ADUs do not count toward the maximum FAR, so ADU floor area comes on top of the missing middle building. State law then sets how many ADUs a city must approve. On a lot with a proposed multifamily building, a city must allow up to two detached ADUs. HCD treats "a structure with two or more attached dwellings on a single lot" as a multifamily dwelling, so a new triplex or fourplex counts.

Once the building exists, the numbers change. On a lot with an existing multifamily building, a city must allow up to eight detached ADUs, but no more than the number of existing units, plus ADUs inside existing space that is not lived in (at least one, up to 25 percent of the units). A detached ADU may be at least 16 feet tall, or 18 feet within one-half mile walking distance of a major transit stop. An ADU of 750 square feet or less pays no impact fees. The ADU law page covers each rule.

Plan financing before you add ADUs to a two- to four-unit building. Fannie Mae's Selling Guide says "ADUs are not permitted with a two- to four-unit dwelling," while Freddie Mac allows one ADU on a one-, two- or three-unit property. The financing page has the details.

SB 684 and SB 79 on Sacramento Lots

SB 684 allows a small-lot subdivision of up to 10 lots and 10 homes on "A lot zoned to allow multifamily residential dwelling use" of five acres or less. Since the Sacramento ordinance permits multi-unit dwellings by right in R-1, R-1A, R-1B and R-2, ask the Planning Division whether the city treats those lots as zoned for multifamily use under Government Code 66499.41. SB 1123 already covers vacant single-family lots of up to 1.5 acres. Through December 31, 2026, the state rules bar a city from setting a floor area ratio below 1.0 for an SB 684 project of 3 to 7 units.

SB 79 took effect in Sacramento County on July 1, 2026. It covers residential, mixed and commercial lots within a half mile of a qualifying stop. Light rail stops are Tier 2: within a quarter mile, a city cannot set a height limit below 65 feet, a density limit below 100 units per acre or a residential FAR below 3. An SB 79 project needs at least five homes. See the SB 79 page for the other tiers and the transit maps.

Review Process and Tenant Rules

Projects go through Site Plan and Design Review. Staff decide a project that meets every standard; the Planning Director decides one that asks for deviations from the standards. The city's page calls this review "discretionary." Ask the Planning Division what the review covers before you apply. Applications use forms CDD-0063 and CDD-0022 and are filed through the city's e-Planning system. Questions go to the Planning Division at [email protected].

Section 5 of the ordinance protects existing homes. To be approved, a project may not reduce the number of units on the site. It may not demolish deed-restricted affordable units. And it may not demolish "a dwelling unit that was covered by a rental or lease agreement that was in effect within 365 days before the permit is approved." If you buy a rented house to redevelop, that 365-day test decides when you can apply. State law adds its own tests: SB 9 blocks demolishing housing a tenant occupied in the last three years, and SB 684 uses five years. See the rent and tenant rules page.

To sell homes one by one, the city says "Property can be further subdivided to allow the sale of units." The 1,200 square foot minimum lot and 16-foot minimum width set how small each new lot can be.

Fees and Loan Limits

State fee rules apply in Sacramento. ADUs of 750 square feet or less pay no impact fees. The 2026 maximum Level I school fee is $5.38 per square foot of assessable space, and a district may charge less. Ask the city for its current development fee schedule; state law requires cities to post one online. See the impact fees page.

The Federal Housing Finance Agency's 2026 conforming loan limits for Sacramento County are $832,750 for one unit, $1,066,250 for two, $1,288,800 for three and $1,601,750 for four. These match the FHFA baseline, which the agency says applies "In most of the United States," and they are lower than the limits in Los Angeles or Santa Clara County. A new building with a certificate of occupancy from the previous 15 years is exempt from the statewide rent cap in Civil Code 1947.12.

Best For

  • ✓ Owners of R-1, R-1A, R-1B or R-2 lots who want three or more homes on one lot without a lot split.
  • ✓ Small lots under 2,900 square feet, where the rear setback drops to 4 feet.
  • ✓ Owners who want to add ADUs outside the FAR limit.

Usually Fails When

  • ✕ The lot is in an airport safety or noise zone the ordinance excludes.
  • ✕ A lease on an existing unit was in effect within 365 days before approval.
  • ✕ The design needs deviations, which move the decision to the Planning Director.

What To Verify Before Spending Money

  • → Your lot's FAR on General Plan Figure LUP-5.
  • → Whether a permanent ordinance has replaced the interim ordinance.
  • → The city's development fee schedule and any parking exception that applies.

Where to Go Next

Related on VanPlex: Sacramento Missing Middle Housing in the global zoning comparison and California SB 9.

Frequently Asked Questions

Can I build a fourplex in Sacramento? +
Yes, in the R-1, R-1A, R-1B and R-2 zones. Sacramento Ordinance 2024-0027, in effect since October 17, 2024, permits duplexes and multi-unit dwellings by right in those zones, outside specified airport safety and noise zones. The ordinance sets no maximum density, so the number of homes depends on the floor area ratio scale and the other building standards.
What is Sacramento's Missing Middle Housing ordinance? +
Sacramento's Missing Middle Housing ordinance is Ordinance 2024-0027, an interim ordinance the City Council adopted 9 to 0 on September 17, 2024. It took effect October 17, 2024. It allows duplexes and multi-unit homes by right in the R-1, R-1A, R-1B and R-2 zones, with a 35-foot height limit and no maximum density or lot coverage.
Is there a unit limit in Sacramento's R-1 zone? +
No. Under Sacramento Ordinance 2024-0027, "There is no maximum density" for missing middle housing in the R-1 zone. The city says its sliding floor area ratio scale limits building area, and the units shown on the scale are the minimum needed to earn more floor area. A 35-foot height limit and setbacks also shape what fits.
How tall can missing middle buildings be in Sacramento? +
Sacramento Ordinance 2024-0027 sets a maximum height of 35 feet for missing middle housing in the R-1, R-1A, R-1B and R-2 zones. The ordinance has no maximum lot coverage and no maximum density. Building area is set by the floor area ratio scale in the 2040 General Plan, so height and floor area work together.
Do I need parking for missing middle housing in Sacramento? +
Onsite parking is not required, with few exceptions. The City of Sacramento says: "With few exceptions, no onsite parking is required by the City code." That statement is on the city page for missing middle projects under Ordinance 2024-0027. Ask the Planning Division at [email protected] whether one of the exceptions applies to your lot.
Do ADUs count toward the floor area limit in Sacramento? +
No. The City of Sacramento says accessory dwelling units do not count toward the minimum number of units on its sliding floor area ratio scale, and do not count toward the maximum floor area ratio. That lets a Sacramento owner add ADUs under state ADU law on top of a missing middle project's building area.
Can I sell missing middle units separately in Sacramento? +
Yes. The City of Sacramento says that under its Missing Middle Housing rules, "Property can be further subdivided to allow the sale of units." Ordinance 2024-0027 sets a minimum lot size of 1,200 square feet and a minimum lot width of 16 feet, or 31 feet on a corner, which shape how small each new lot can be.
What is the minimum lot size for missing middle housing in Sacramento? +
Sacramento Ordinance 2024-0027 sets a minimum lot size of 1,200 square feet, a minimum lot width of 16 feet (31 feet on a corner lot), and a maximum lot depth of 160 feet. The ordinance also covers a single home on a lot of 1,200 to 2,899 square feet, and an owner may choose it for a single home on a larger lot.
Can I demolish a rented house for missing middle housing in Sacramento? +
Only if no lease was in effect within the last 365 days. Sacramento Ordinance 2024-0027 bars approval of a project that demolishes a unit covered by a rental or lease agreement in effect within 365 days before the permit is approved. It also bars projects that reduce the number of units or demolish deed-restricted affordable units.
How many people live in Sacramento? +
The US Census Bureau estimates 536,449 people in the City of Sacramento on July 1, 2025 (Vintage 2025). The California Department of Finance counts 539,765 people on January 1, 2026, with 216,076 housing units, of which 19,203 are in buildings of two to four units. The two agencies use different dates and methods.
How much open space does a Sacramento missing middle project need? +
A Sacramento missing middle project of two or more units needs common open space of 125 square feet per unit or 400 square feet, whichever is greater, where the maximum floor area ratio is under 2. Where it is 2 or more, the rule is 75 square feet per unit or 400 square feet. A fourplex under the first rule needs 500 square feet.

Official sources (checked October 2026)

City of Sacramento, Missing Middle Housing
https://www.cityofsacramento.gov/community-development/planning/housing/missing-middle-housing
City of Sacramento, Ordinance 2024-0027 (PDF)
https://www.cityofsacramento.gov/content/dam/portal/cdd/Planning/Housing/Missing-Middle-Housing/O2024-0027%20An%20Interim%20Ordinance%20Broadening%20the%20Range%20of%20Housing%20Types%20Permitted%20by%20Right.pdf
US Census Bureau, Vintage 2025 city population estimates (CSV)
https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/cities/totals/sub-est2025_6.csv
California Department of Finance, E-5 population and housing estimates 2020 to 2026
https://dof.ca.gov/forecasting/demographics/estimates/e-5-population-and-housing-estimates-for-cities-counties-and-the-state-2020-2026/
Government Code 65852.21 (SB 9 two-unit projects)
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV&sectionNum=65852.21
Government Code 66411.7 (SB 9 urban lot splits)
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV&sectionNum=66411.7
HCD ADU Handbook (updated March 2026, PDF)
https://www.hcd.ca.gov/sites/default/files/docs/policy-and-research/adu-handbook-update.pdf
Government Code 66499.41 (SB 684 subdivision maps)
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV&sectionNum=66499.41
Government Code 66323 (ADUs approved by staff review)
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV&sectionNum=66323
Government Code 66321 (ADU size and height limits)
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV&sectionNum=66321
Government Code 65912.157 (SB 79 height, density and floor area rules)
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV&sectionNum=65912.157
Fannie Mae Selling Guide B2-3-04, special property eligibility
https://selling-guide.fanniemae.com/sel/b2-3-04/special-property-eligibility-considerations
Freddie Mac ADU fact sheet (February 2026, PDF)
https://sf.freddiemac.com/docs/pdf/fact-sheet/adu-fact-sheet.pdf
HCD SB 79 Advisory on Metropolitan Planning Organizations (March 20, 2026)
https://www.hcd.ca.gov/sites/default/files/docs/planning-and-community/sb-79-mpo-advisory.pdf
State Allocation Board, 2026 school fee adjustment (January 28, 2026, PDF)
https://www.dgs.ca.gov/-/media/Divisions/OPSC/Resources/CCI-Adjustments/01282026_Index-Adjustment-on-Development_Approved_FINAL.pdf
Civil Code 1947.12 (statewide rent cap)
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=1947.12
FHFA, 2026 county loan limit file (XLSX)
https://www.fhfa.gov/document/d/cll/fullcountyloanlimitlist2026_hera-based_final_flat.xlsx
General information, not legal advice. California housing law changes every year, and each city adds its own rules on top of state law. Confirm current requirements with the city or county planning department, and with a California-licensed attorney or architect, before you buy land or file plans.