Sacramento | ADUs and SB 9
Sacramento ADUs and SB 9: Local and State ADU Options, Junior ADUs and Two-Unit Projects
An ADU, or accessory dwelling unit, is a second, smaller home on a lot with a main home. A junior ADU is a unit of up to 500 square feet built inside the walls of a house. Sacramento writes its ADU rules in City Code Section 17.228.105 and its SB 9 rules in Chapter 17.864. This page gives both, the January 2026 state review of the ADU rules, and the changes the City has proposed. State law is on the ADU law page and the SB 9 page.
Sacramento ADUs and SB 9 in six facts
- Sacramento City Code Section 17.228.105 offers a local ADU option (subsection B) and a state option under Government Code 66323 (subsection C). Source: City Code 17.228.105, as printed in the 2026 omnibus redline
- Under the local option, a lot with a single-unit dwelling may have two ADUs, one ADU and one junior ADU, or two junior ADUs. Source: City Code 17.228.105.B.1
- A local detached ADU may have up to 1,200 square feet, and two detached ADUs on one lot may not exceed 1,200 square feet combined. Source: City Code 17.228.105.B.2.b
- On January 20, 2026, HCD found parts of the City's ADU rules out of line with state law, including the rule that the local and state options may not be combined. Source: HCD letter to the City of Sacramento
- The City accepts SB 9 two-unit projects in the RE and R-1 zones, with 4-foot interior side and rear setbacks and a 35-foot height limit. Source: City of Sacramento, SB 9 application, CDD-0436
- Since July 12, 2026, the optional ADU zoning review application has no fee. Source: City of Sacramento, ADU application, CDD-0009
Two ADU Options in One Section
Section 17.228.105 is built around a choice. Subsection A says an applicant "may choose to proceed under subsection B, which sets forth the city's local development options," or "under subsection C below, which sets forth an alternative development option, consistent with California Government Code section 66323." It then adds: "The two options may not be combined." The City's ADU application repeats the rule: "There is no pick/choose or mix/match of local and state standards."
The local option allows larger units and more design freedom, with more standards to meet. The state option follows Government Code 66323, the section that lists the ADUs every California city must approve by staff review. Under subsection C.3, "No other objective development standard or design standard within this title" applies to an ADU that meets subsection C. Either way, approval is ministerial, which means staff check the plans against fixed standards and no hearing is held.
This page reads the section as it stands in the redline of the 2026 Title 17 omnibus ordinance, printed in the report the City prepared for the Law and Legislation Committee for September 22, 2026. A redline shows the current text with proposed deletions struck through and additions underlined. The text quoted here is the current text. The proposed changes are described in their own section below, because the City Council had not adopted them on October 9, 2026.
The Local Option (Subsection B)
"A lot developed with a single-unit dwelling may have a maximum of two accessory dwelling units, one accessory dwelling unit and one junior accessory dwelling unit, or two junior accessory dwelling units," the section says. A lot with a duplex or multi-unit dwelling may have up to two ADUs. ADUs and junior ADUs "shall not be included in the calculation of density," and the code calls them residential uses consistent with the General Plan and zoning of the lot.
| Local option standard | Rule |
|---|---|
| Number on a single-unit lot | Two ADUs, one ADU and one junior ADU, or two junior ADUs |
| Number on a duplex or multi-unit lot | Up to two ADUs |
| Attached ADU size | The greater of 50% of the primary dwelling floor area, or 850 sq ft (one bedroom or less) or 1,000 sq ft (more than one bedroom) |
| Detached ADU size | 1,200 sq ft; two detached ADUs share 1,200 sq ft |
| Separation | 4 ft from the primary dwelling and between detached ADUs |
| Within 60 ft of the front line | Front-yard setback of the lot; interior side and rear setbacks of the zone or 3 ft, whichever is less |
| More than 60 ft from the front line | No setback for a one-story ADU or first floor; upper floors 3 ft or the zone setback, whichever is less |
| Lot coverage and open space | Zone rules apply, but ADUs covering less than 800 sq ft in total are exempt |
| Junior ADU | Up to 500 sq ft, inside the walls of a single-unit dwelling, separate entrance, efficiency kitchen |
Source: Sacramento City Code Section 17.228.105.B, read from the redline in the 2026 Title 17 omnibus ordinance report, pages 9 to 16 of the redline (page images checked).
The size rules count "all floor area within the accessory dwelling unit building envelope, excluding garages and accessory structures." An attached ADU may have the greater of 50 percent of the primary dwelling's existing floor area, or 850 square feet with one bedroom or less and 1,000 square feet with more. "The floor area of one detached accessory dwelling unit may not exceed 1,200 square feet," and two detached ADUs share that 1,200 square feet. A detached ADU must stand 4 feet from the main home and 4 feet from another detached ADU, or it may be joined to the other detached ADU.
The setback rule turns on a 60-foot line from the front of the lot. Within 60 feet, an ADU must meet the lot's front-yard setback and "minimum interior side-yard and rear-yard setbacks as required by the zoning designation for the primary dwelling or 3 feet each, whichever is less." Beyond 60 feet, "No setback is required for a single-story accessory dwelling unit or the first floor of a multistory accessory dwelling unit," and upper floors keep 3 feet or the zone setback, whichever is less. The current text also requires every ADU to "comply with the street side-yard setbacks applicable to the lot," the street-facing side of a corner lot.
Four more rules round out subsection B. One ADU of 800 square feet or less may sit inside the front-yard setback when the rear and side yards cannot fit a two-story detached ADU of at least 800 square feet or an attached ADU of at least 800 square feet. No balcony, deck or open-stair landing within 10 feet of a rear or side lot line may be higher than three feet above the ground, unless that line abuts a nonresidential use, an alley or a street. An ADU "may not project into the required setback from the landside toe of a levee." And an ADU in a historic district or on a landmark property must meet the City's historic ADU standards, explained on the historic districts page.
A junior ADU under the local option may not exceed 500 square feet, must sit "within the walls of a single-unit dwelling, which may include an attached garage," needs its own entrance and an efficiency kitchen with cooking appliances, a counter and storage. If it has no separate bathroom, it also needs an interior entry to the main living area. A deed restriction must be recorded before the final building inspection.
The State Option (Subsection C)
Subsection C copies the state list. "Notwithstanding subsection B, above, the city shall ministerially approve an application for a building permit within a residential or mixed-use zone to create any of the following":
| State option unit | Limit in City Code 17.228.105.C |
|---|---|
| ADU and junior ADU inside existing or proposed space | One of each per single-unit lot; up to 150 sq ft added to an accessory structure for access |
| Detached new ADU on a single-unit lot | One, up to 800 sq ft, 4-ft side and rear setbacks, 18 ft tall (20 ft to match the roof pitch) |
| ADUs inside unused space of an existing multi-unit building | At least one, up to 25% of the existing units |
| Detached ADUs on a lot with an existing multi-unit building | Up to eight, but no more than the number of existing units |
| Detached ADUs on a lot with a proposed multi-unit building | Up to two |
Source: Sacramento City Code Section 17.228.105.C, as printed in the 2026 omnibus redline; the eight-ADU rule was added by the 2025 Title 17 omnibus ordinance to follow SB 1211.
The 2025 omnibus ordinance raised the multifamily count. Its staff report says SB 1211, in effect since January 1, 2025, lets an existing multifamily development have "up to eight (8) ADUs but not more than the number of existing units on the lot." So a lot with an existing fourplex may add four detached ADUs, and a lot with an existing duplex may add two. A detached ADU on a multi-unit lot may be 18 feet tall, or 20 feet to line up with the roof pitch of the main building, with 4-foot rear and side setbacks.
This matters for the missing middle ordinance. The City's missing middle FAQ says ADUs "are not subject to the MMH interim ordinance and do not count toward the project's FAR," but "are not allowed to be constructed within or encroach into any open space areas required by the Sacramento City Code." A new fourplex built under the ordinance is a proposed multi-unit dwelling, so the state option allows two detached ADUs with it.
The State's Findings and the City's Proposed Changes
HCD, the state housing department, reviews city ADU ordinances. In a letter of January 20, 2026, it reviewed Sacramento's Ordinance No. 2024-0051, adopted December 10, 2024, and Section 17.228.105, and found that the code "fails to comply with State ADU Laws." It listed five problems: the ban on combining the two options, the street side setback, the front setback rule as applied to state ADUs, owner occupancy for junior ADUs, and the multifamily ADU count. The letter asked for a written response by February 20, 2026.
On combinations, HCD wrote that "restricting lots to one format is inconsistent with State ADU Law" and that the City "must amend its Ordinance to allow the full allotment and combination of both 66314 and 66323 units." Government Code 66323(a) tells a city to approve "any of the following units, or any combination of the following units." The City's 2026 omnibus report says staff "refuted the HCD Letter's claims but, nonetheless, agreed to make specified clarifying changes." The proposed rewrite would let a lot always have three state units (one detached ADU, one attached ADU and one junior ADU) and, "regardless of the number of State ADUs present on a lot, two (2) local ADUs."
On junior ADUs, the current code says "Unless owned by a government agency, land trust, or housing organization, the property owner must reside onsite." Since January 1, 2026, Government Code 66333 says owner occupancy "shall not be required if the junior accessory dwelling unit has separate sanitation facilities." The statute controls where the code is stricter. The City's own ADU application, dated June 23, 2026, already says owner occupancy "is not required if the JADU has separate sanitation facilities from the primary dwelling." The proposed ordinance would also make the street side setback 4 feet and limit any junior ADU offered for rent to terms longer than 30 days.
Until the City Council adopts the 2026 omnibus ordinance, plan an ADU project under one option at a time, as the City's form asks, and raise any combination with the Planning Division in writing, citing Government Code 66323. Check the City's planning forms page for a new ADU form after adoption.
Rentals, Fees and Permits for ADUs
The two options differ on short stays. Under the current code, a local ADU "may be rented for a term less than 30 days in accordance with section 17.228.104.C," the City's short-term rental rule. A state ADU or junior ADU "may not be rented for a term less than 30 days." An ADU may not be sold apart from the main home "except as provided in California Government Code section 66341."
State law bars impact fees on an ADU of 750 square feet of interior livable space or less, and on a junior ADU of 500 square feet or less, under Government Code 66311.5. Larger ADUs may be charged "proportionately in relation to the square footage of the primary dwelling unit." Two City fees exempt ADUs outright: the Transportation Development Impact Fee schedule says "second residential units (accessory dwelling units) are exempt," and the Housing Impact Fee page lists "Second residential units" among exempt projects. The permits and fees page lists the other fees.
An ADU goes straight to a building permit. The optional zoning review application lets staff check the zoning first; the form says, "Beginning July 12, 2026, there is no fee for this application. Until then, the fee is $117." State law requires a decision on a complete ADU application within 60 days when the lot already has a home, under Government Code 66317.
SB 9 Two-Unit Projects (Chapter 17.864)
SB 9 lets an owner build two primary homes on a lot in a single-family zone with staff approval. Sacramento's SB 9 application limits it to lots "zoned Rural Estate (RE) or Single-Unit Dwelling (R-1)." Since the missing middle ordinance already permits duplexes by right in R-1, the main gains from SB 9 there are a staff decision within 60 days and the lower setbacks below.
The 2025 Title 17 omnibus ordinance rewrote the setbacks in Section 17.864.020. The front-yard setback is "the average of the two front-yard setbacks of the nearest two buildings" on the block, the setback of the one neighbor if there is one, or 20 feet if there is none. "The minimum interior side-yard setback is four feet," the street side-yard setback is 12.5 feet, and "The minimum rear-yard setback is four feet." The same ordinance deleted the bulk control standard, because HCD advised that no other rule may produce a setback larger than 4 feet.
The SB 9 form adds the rest. The maximum height is 35 feet. In R-1, "there is no maximum lot coverage for SB 9 developments," because the missing middle ordinance sets none. Development must stay 20 feet from the landside toe of a flood control levee, or 50 feet on a site of five acres or more. Parking is not required. A protected tree may be removed when keeping it would physically stop up to two units or stop either unit from being at least 800 square feet, which matches Government Code 65852.21.
The form's housing checklist asks whether the project has "no more than two dwellings per parcel, including accessory dwelling units and junior accessory dwelling units." Government Code 65852.21(f) lets a city refuse ADUs only "on parcels that use both" the two-unit section and the urban lot split section. On a lot that is not split, ask the Planning Division whether the City counts ADUs against the two units; the statute is the rule that controls.
The review clock is 60 days. Section 17.864.020.C now says the City "shall approve or deny an application submitted under this section within 60 days of receipt of a complete application," or it is deemed approved. The staff fee worksheet lists $2,696 for each SB 9 single-unit or duplex dwelling. Rentals of SB 9 units must be for longer than 30 days.
Best For
- ✓ A house lot that needs one large detached ADU of up to 1,200 square feet under the local option.
- ✓ An existing duplex to fourplex that can add detached ADUs up to the number of existing units under the state option.
- ✓ An RE or R-1 lot where 4-foot side and rear setbacks make two homes fit under SB 9.
Usually Fails When
- ✕ The plan mixes local and state ADUs on one lot before the 2026 omnibus ordinance is adopted.
- ✕ An ADU is placed in a required open space area of a missing middle project.
- ✕ An SB 9 project would demolish a home rented in the last three years.
What To Verify Before Spending Money
- → Which ADU option your plans follow, stated on the plans and the application.
- → Whether the 2026 omnibus ordinance has been adopted and changed Section 17.228.105.
- → Historic district status and any EA-2 or EA-3 airport overlay on the Land Information Lookup App.
Where to Go Next
Related on VanPlex: the Sacramento overview, California ADU law and financing 2 to 4 units.
Frequently Asked Questions
How many ADUs can I build on a Sacramento house lot?
How big can a detached ADU be in Sacramento?
What setbacks apply to a Sacramento ADU in the back yard?
Can I build an ADU in my front yard in Sacramento?
Does a Sacramento junior ADU owner have to live on site?
What did HCD tell Sacramento about its ADU ordinance?
Can I rent a Sacramento ADU as a short-term rental?
Which Sacramento zones allow an SB 9 duplex?
What setbacks apply to an SB 9 project in Sacramento?
How much does the City charge for an SB 9 duplex in Sacramento?
Official sources (checked October 2026)
Get new guides by email
New VanPlex guides and articles on multiplex rules, building costs and permits, sent to your inbox.
Planning a multiplex in Sacramento?
VanPlex builds multiplexes in British Columbia, Canada. For a lot in Sacramento, our team makes a custom proforma by hand and emails it to you in 24 to 48 hours.
Get a proforma for your address