Sacramento | Three or More Homes
Sacramento Three or More Homes: Missing Middle Housing, the Sliding Scale, SB 79 and Density Bonus
Sacramento has four routes to a building of three or more homes on one lot: the Missing Middle Housing Interim Ordinance in the four house zones, the City's ministerial infill permit, the state's SB 684 and SB 79, and the state density bonus. This page explains how each works in Sacramento, starting with the sliding floor area scale that decides how big a missing middle building can be. The zoning districts page explains which zone you are in.
Three or more homes in six facts
- The City's sliding scale allows a floor area ratio of 0.4 for one home, 0.7 for two, 1.0 for three or four, 1.1 for five to seven, 1.25 for eight to ten and 1.4 for eleven. Source: Missing Middle Housing FAQ, Case Study 1
- A missing middle project with no deviations is decided at staff level through site plan and design review; one with deviations goes to the director level. Source: Ordinance 2024-0027, Section 5
- A project may not be approved if it leaves fewer homes, or demolishes a home covered by a lease in effect within 365 days before the permit is approved. Source: Ordinance 2024-0027, Section 5.C
- Where the lot's maximum floor area ratio is under 2, two or more homes need 125 square feet of common open space per home or 400 square feet, whichever is greater. Source: Ordinance 2024-0027, Section 7.C
- The City's SB 79 checklist applies the law within a half mile of a Tier 2 transit stop, with heights of 55, 65 or 85 feet by distance. Source: City of Sacramento, SB 79 checklist, CDD-0079
- The City says a licensed architect or design professional is required for projects proposing 5 or more units. Source: Missing Middle Housing FAQ, question 3
The Sliding Floor Area Scale
In R-1, R-1A, R-1B and R-2, building size comes from two General Plan tools. Map LUP-6 sets the most floor area any project on the lot may have. Figure LUP-5, the sliding scale, then decides how much of that a project earns by its number of homes. General Plan Policy LUP-3.2 says "Additional building area may increase proportionally to the number of units proposed on a lot, consistent with Figure LUP-5, up to the maximum FAR established by Map LUP-6." The City's Missing Middle Housing page sums it up: "The Sliding FAR Scale limits the building area allowed."
Figure LUP-5 is a drawing in the General Plan. The City's missing middle FAQ prints its values in a worked example: a 2,614 square foot R-1 lot with a General Plan maximum of 2.0 and a minimum density of 18 units per acre.
| Primary homes on the lot | Floor area ratio earned | On the 2,614 sq ft example lot |
|---|---|---|
| 1 | 0.4 | 1,046 sq ft, or 2,000 sq ft under Policy LUP-3.3 |
| 2 | 0.7 | 1,830 sq ft, or 2,000 sq ft under Policy LUP-3.3 |
| 3 or 4 | 1.0 | 2,614 sq ft |
| 5 to 7 | 1.1 | 2,875 sq ft |
| 8 to 10 | 1.25 | 3,268 sq ft |
| 11 | 1.4 | 3,660 sq ft |
| 12 or more | Plus 0.1 for each added unit | Plus 261 sq ft for each added unit |
Source: City of Sacramento, Missing Middle Housing Interim Ordinance FAQ, Case Study #1 (updated January 6, 2025). The ratio earned can never pass the lot's maximum on Map LUP-6.
Three rules shape the numbers. Policy LUP-3.3 allows "up to 2,000 square feet of net building area per lot or the maximum allowed by the Sliding FAR Scale (Figure LUP-5), whichever is greater," which helps one or two homes on a small lot. The scale counts primary homes only: the FAQ says ADUs and junior ADUs "do not count toward the minimum unit count on the Sliding FAR Scale." And the lot's ceiling stays in force. The FAQ's second example explains it: on a lot with a maximum of 1.0, "development is limited to 0.7 FAR if two primary units are proposed," and "if three or more units are proposed, the full 1.0 FAR is allowed."
The same FAQ case study says that on its 2.0 lot, "To be allowed the full 2.0 General Plan FAR, a minimum of 17 units must be provided." Minimum density works in the other direction. Map LUP-8 sets the fewest homes a project must provide; on the example lot, 0.06 acre at 18 units per acre gives a minimum of one home. The FAQ's second case, a 21,750 square foot lot at 3 units per acre, needs two. The FAQ adds that existing homes count against the floor area: a lot of 21,750 square feet at 1.0 with a 2,200 square foot house has "19,550 square feet remaining."
Remodels have an exception. Policy LUP-3.4 says remodels and additions to existing single-unit, duplex and neighborhood-scale multi-unit dwellings "are exempt from the limits established by the Sliding Floor Area Ratio Scale."
Review, Deviations and Anti-Displacement Findings
Section 5 of Ordinance 2024-0027 sends every missing middle project through site plan and design review. Without a deviation, review is "conducted at the staff level under Sacramento City Code section 17.808.150." With a deviation, it is at the director level under Section 17.808.140. A deviation is permission to depart from one of the ordinance's standards. The City's page calls this review "discretionary," meaning the decision-maker must make findings, and the FAQ says deviation requests "will require a director-level hearing (additional review time and fees will apply)."
A deviation needs four findings in Section 5.D: the site has "exceptional or extraordinary circumstances or conditions, such as the location, shape, size, topography, orientation, or property encumbrances"; strict rules "would have an unduly harsh result upon the utilization of the site"; the deviation is no special privilege; and it will not "materially and adversely affect the health and safety of persons residing in the neighborhood."
Every approval also needs three anti-displacement findings in Section 5.C. The project may not result in "Fewer dwelling units than existed at the time the permit is approved"; in "Demolition of a dwelling unit that was covered by a rental or lease agreement that was in effect within 365 days before the permit is approved"; or in the demolition of a home under an affordable housing regulatory agreement. The tenant rules page compares this 365-day test with the state laws.
Applications use Forms CDD-0063 and CDD-0022 through the City's e-Planning system. The FAQ encourages a pre-application meeting with staff and says hiring a licensed architect or design professional "is required for projects proposing 5 or more units." Projects must also meet the Citywide Single-Unit Dwelling and Duplex Dwelling Design Guidelines adopted by City Council resolution.
Common Open Space and the Building Envelope
Section 7.C sets common open space, the shared outdoor area for residents. "If the lot is designated in the general plan with a maximum FAR of less than 2," a project of two or more homes needs "125 square feet per dwelling unit, or 400 square feet, whichever results in the greater amount of open space." Where the maximum is 2 or more, the ratio is 75 square feet per home or 400 square feet. In the Central City Special Planning District, the ratios in City Code Section 17.444.050.B apply instead.
The space must be at least 10 feet by 10 feet, at ground level, off any driveway, next to a walkway to a home's entrance, and visible from the homes' entrances and windows. It may be decks, patios or courtyards, with drought-tolerant planting and seating. Open space inside a required setback counts only if it measures at least 15 by 15 feet and is shaded by a healthy existing tree or a new City-approved tree. Ground-level private yards count when they are at least 3 feet deep and their fences are no higher than 4 feet.
Section 7.B adds bulk control for projects of three or more homes and for some small-lot projects. All primary homes must fit inside a "base building envelope." Its side planes rise "to a height of 16 feet; at this point, the envelope slopes inward from each side at a 45 degree angle," up to 35 feet. Its front plane rises 20 feet, then slopes back at 45 degrees. Dormers may extend past the roof planes, but their total length may not pass 60 percent of the façade width, a limit that falls away on lots with a maximum ratio of 2 or more. If no single-unit or duplex dwelling stands on the same side of the block, the envelope does not apply.
One width rule applies to every missing middle project with a building facing the street: within 40 feet of the front property line, no part may be wider "than the greatest width of the buildings on the adjacent lots, or 55 feet, whichever is greater."
Building Code, Utilities and Waste
Three or more homes change the building code. The City's FAQ says "Buildings containing up to two units shall comply with the California Residential Building Code" and three or more units, excluding junior ADUs, follow the commercial building code. The FAQ sends questions on the building code, permit fees and inspections to the Building Division at [email protected].
The FAQ lists other departments to contact before applying. The Department of Utilities warns that adding more than 500 square feet of hard surfaces such as roofs and paving "may trigger on-site grading/drainage requirements." Development Engineering may require curb, gutter, sidewalk, streetlight or alley work. Projects of five or more homes on one parcel must follow the City's commercial solid waste rules for multi-family properties in City Code 13.24.520. SMUD, the electric utility, asks to be consulted early in site planning.
The City's Ministerial Infill Permit and SB 684
Sacramento has its own staff-approval permit for infill housing in City Code Chapter 17.860, in effect since August 27, 2020. Its Ministerial Housing page says projects that meet objective standards "are approved administratively and do not require a public hearing." It covers residential or mixed-use projects of 2 to 200 units, where residential space is at least two-thirds of the building, on sites where at least 75 percent of the perimeter adjoins developed parcels. It excludes historic districts, sites with variances or conditional use permits, and projects that would demolish units in a building of three or more units occupied by tenants within the last year.
That page and the General Plan disagree on parking. The page still describes parking reductions near light rail stations, while General Plan Policy LUP-4.14, adopted with the plan on February 27, 2024, says the City "shall not require new or existing development to provide off-street vehicle parking spaces." The General Plan policy is the newer rule and controls. Section 3.C of the missing middle ordinance also turns off Section 17.860.030 for missing middle housing.
For up to ten homes on their own lots, SB 684 is often the better path. Sacramento's Chapter 17.868 lets the City approve the homes and the map together by staff review, with lots as small as 600 square feet. Its floor area rules for three to ten homes and the missing middle standards that still apply are on the lot size and subdivisions page.
SB 79 Near Light Rail
SB 79 took effect July 1, 2026. It sets state height, density and floor area limits for housing near transit. Sacramento's SB 79 checklist, Form CDD-0079, asks whether the site is "within one-half mile of a Tier 2 transit-oriented development (TOD) stop" and lists the eligible zones: RE, R-1, R-1A, R-1B, R-2, R-2A, R-2B, R-3, R-3A, R-4, R-4A, R-5, RMX, RO, OB, OB-2, OB-3, EC, SC, C-1, C-2, C-3, C-4 and M-T, plus four industrial zones in the Central City only. "Any portion of the parcel can be within the one-half mile radius to be eligible."
| Distance from the stop | Height | Density | Floor area ratio |
|---|---|---|---|
| Within 200 ft of a Tier 2 stop | 85 ft | 140 units per acre | 4 |
| 200 ft to 1/4 mile | 65 ft | 100 units per acre | 3 |
| 1/4 to 1/2 mile | 55 ft | 80 units per acre | 2.5 |
Sources: City of Sacramento, Form CDD-0079 (July 1, 2026), and the SB 79 table in the March 26, 2026 workshop report.
An SB 79 project needs at least 5 homes, at least 30 homes per acre or the local minimum if higher, and an average home size of 1,750 net habitable square feet or less. With more than 10 homes, it must set aside at least 7 percent for extremely low-income, 10 percent for very low-income or 13 percent for lower-income households, kept affordable for 55 years for rentals or 45 years for sale. Buildings over 85 feet must meet the SB 35 labor rules. The form also bars sites with more than two units where rent-controlled homes occupied by tenants in the last seven years would be demolished.
In Sacramento, an SB 79 project files the City's checklist together with another application. The form "accompanies the applicable form(s)" for site plan and design review, SB 35 or the City's ministerial housing review. A March 26, 2026 workshop report recommended a local implementing ordinance and writing SB 79 heights into the zoning code near transit; VanPlex found no adopted SB 79 ordinance in the City's legislative records on October 9, 2026. The August 2026 zoning update FAQ says the update would add similar standards for some zones and that "In some cases, the City's standards allow for greater development intensity than SB 79."
Density Bonus and What the Update Proposes
The state density bonus law lets a project with affordable units build more homes and ask for relief from standards. Sacramento applies it through City Code Chapter 17.704 and the density bonus application, Form CDD-0451, which covers "Housing developments with five or more dwelling units" that designate units for moderate and lower incomes or specified groups. A density bonus agreement costs $4,339 on the staff fee worksheet. The SB 79 checklist adds that an SB 79 project reaching 75 homes per acre within a quarter mile of a stop, or 60 between a quarter and a half mile, can earn extra concessions.
The zoning update would replace the interim ordinance. Its FAQ says that "In FAR 1.0 areas, the proposal would allow multi-unit residential buildings up to three stories through a staff-level approval process," and four stories in 2.0 areas. The August 3, 2026 webinar slides show draft limits of 35 feet in 1.0 areas and 45 feet in 2.0 areas with no bulk control envelope, and building width caps of 60 and 80 feet. These are proposals until the City Council adopts them.
Best For
- ✓ An R-1 to R-2 lot with a 1.0 maximum, where three or four homes earn the full floor area.
- ✓ A lot with a 2.0 maximum near transit, for a larger missing middle building with less open space per home.
- ✓ A site within a half mile of a Tier 2 stop with room for five or more homes under SB 79.
Usually Fails When
- ✕ An existing home was under a lease in effect within 365 days before approval.
- ✕ The design needs deviations and the site has no exceptional condition to support the findings.
- ✕ An SB 79 plan has more than 10 homes but no affordable units.
What To Verify Before Spending Money
- → Your Map LUP-6 maximum and Map LUP-8 minimum on the Land Information Lookup App.
- → Whether the block face has single-unit or duplex dwellings, which turns on the building envelope.
- → Whether the zoning update has replaced the interim ordinance before you file.
Where to Go Next
Related on VanPlex: the Sacramento overview, SB 79 and duplex to fourplex in California.
Frequently Asked Questions
How much floor area does a fourplex get in Sacramento?
How many homes do I need for a 2.0 floor area ratio in Sacramento?
How does Sacramento review a missing middle project?
What findings does Sacramento need to allow a deviation for missing middle housing?
What is the base building envelope in the Sacramento missing middle ordinance?
Which building code applies to a Sacramento triplex?
Does SB 79 apply in Sacramento?
Has Sacramento adopted its own SB 79 ordinance?
What is Sacramento's ministerial infill housing permit?
Can a Sacramento missing middle project use a density bonus?
Official sources (checked October 2026)
Get new guides by email
New VanPlex guides and articles on multiplex rules, building costs and permits, sent to your inbox.
Planning a multiplex in Sacramento?
VanPlex builds multiplexes in British Columbia, Canada. For a lot in Sacramento, our team makes a custom proforma by hand and emails it to you in 24 to 48 hours.
Get a proforma for your address