Sacramento | Historic Districts and Tenant Rules
Sacramento Historic Districts and Tenant Rules: Preservation Review, Historic ADUs and the Tenant Protection Act
Two sets of Sacramento rules decide whether an older house can become several homes. Historic preservation rules apply to landmarks and to the City's historic districts. Tenant rules apply when the house, or the building you plan to replace, is rented. This page covers both, with the City's 2026 fees and the rent cap in force since July 1, 2026. The California rent and tenant rules page covers the state law.
Historic and tenant rules in six facts
- The Sacramento Register of Historic and Cultural Resources lists historic landmarks, historic districts and contributing resources inside those districts. Source: City of Sacramento, Historic Preservation page
- On a parcel more than 100 feet deep, a new ADU must stand at least 30 feet from a contributing resource on the same parcel. Source: ADU Design Standards for Historic Properties, 1.1
- A Mills Act contract application costs $4,603 for a building of 2,500 square feet or less and $8,416 for a larger one, plus an 8 percent surcharge. Source: City of Sacramento, Mills Act Program page
- From July 1, 2026, the maximum annual rent increase under the Tenant Protection Program is 8.6 percent. Source: City of Sacramento, Tenant Protection Program
- City Code Chapter 5.156 exempts rental units built after February 1, 1995, single dwelling units and condominium units. Source: City Code Section 5.156.030
- A missing middle project cannot be approved if it demolishes a home covered by a lease in effect within 365 days before the permit is approved. Source: Ordinance 2024-0027, Section 5.C
The Sacramento Register and Its Districts
Sacramento's historic preservation program "began in 1974 with the City Council's adoption of the City's first preservation ordinance." It is now a Certified Local Government program, a status under the California Office of Historic Preservation, with "a seven-member Preservation Commission." The Preservation Director keeps the Sacramento Register of Historic and Cultural Resources. Properties on it are "either individually as historic Landmarks, Historic Districts, or Contributing Resources within historic districts."
The City's register listing page names 31 historic district entries (VanPlex count), from the 1200-1300 Q Street Historic District to the Winn Park Historic District, including Alkali Flat, Boulevard Park, Bungalow Row, Capitol Mansions, Marshall Park, Newton Booth, Oak Park, Poverty Ridge and the R Street Historic District. The Historic District Plans page says plans "have been prepared for nearly all of the City's listed historic districts" under City Code Section 17.604.300, and lists 26 adopted plans plus one forthcoming. Each plan includes the district's "historic context, period of significance, character defining features, and design standards and criteria."
The two City lists do not match name for name. The plans page includes the South Land Park Hills (Eichler) Historic District Plan, which the register page's district list does not name, and the register page lists districts, such as the Sacramento City College Historic District, with no plan on the plans page. The register is the official list of what is protected; check your address on the Land Information Lookup App, which both pages point to.
Landmark status stays with the property when the zone changes. The zoning update FAQ says the proposed zoning changes "will not affect a historic property's landmark status or existing historic districts" and that historic districts keep their own development standards.
Preservation Review Before a Building Permit
"If a property has been designated a historic Landmark, or is located within a Historic District, preservation staff are responsible for overseeing the Site Plan and Design Review" before the building permit, the program page says. Work on the exterior, "including windows and doors," construction on the site, or significant interiors open to the public will likely need a Planning Entitlement Application for Preservation Site Plan and Design Review. "Many small projects, such as maintenance, is exempt."
The Preservation Step by Step page sets out five steps: check the address; email a scope of work and photos to [email protected]; ask preservation staff for a preliminary review; apply online and pay fees; and, after the decision and appeal period, apply for the building permit. Staff review against "the City Code, the Secretary of the Interior's Standards for Treatment of Historic Properties, any applicable historic district plans or design guidelines." Some projects are decided by staff, "some projects require a public hearing by the Preservation Director," and some go to the Preservation Commission. Any later change to an approved project must go back to preservation staff.
Demolition can start a nomination. The staff and director fee worksheets list a "Historic Nomination Triggered by a Demolition Request" at $7,035, and the director worksheet lists a preservation hearing fee of $5,129. The 2025 omnibus ordinance amended Section 17.604.220 so that notice of a nomination hearing goes by mail under Section 17.812.030.B.4.
Most streamlined paths stop at the district line. The City's own ministerial infill permit excludes a project in a historic district or on a historic or cultural resource. The SB 9 application asks whether a lot split would demolish or alter "a contributing structure" or "an existing exterior structural wall" in a historic district, and whether the parcel is a landmark; for two-unit projects it asks whether the site contains a contributing structure or is individually listed. Under SB 9, those answers mean the site is not eligible. The missing middle ordinance has no historic exclusion, so missing middle housing in a district goes through preservation review. The SB 9 form also points to Sections 25 to 31 of the Infill Housing Design Standards, which cover additions to contributing resources, raising a building, new infill and alley-facing infill in historic districts.
ADU Design Standards for Historic Properties
The City has objective standards for detached ADUs "in historic districts and on landmark-designated properties." Objective means they can be checked against a measurement, so staff can approve a design without discretion. The standards document says they "supplement the base ADU development standards contained in Section 17.228.105.B" and that "Where a conflict exists ... the Historic ADU Standards prevail." The City's ADU application of June 23, 2026 applies them to ADUs "proposed under the Sacramento Local ADU Ordinance." The standards themselves say local rules "do not override state-mandated allowances under Government Code Section 66323."
| Historic ADU standard | Rule |
|---|---|
| Separation from a contributing resource | 30 ft on parcels more than 100 ft deep; 4 ft on parcels 100 ft deep or less |
| Alley lots | Detached ADU no more than 5 ft from the alley property line |
| Location | Behind the rear façade of the main home, if the rear yard has a clear area of at least 20 by 40 ft; otherwise behind the front setback and not past the parcel midpoint |
| Height | No more than 150% of the height of a contributing resource or landmark on the same or adjacent parcel |
| Width | No wider than the contributing resource on the same parcel |
| Roof | Same general roof type as the reference building, slope within 10 degrees; flat only if the main building's roof is at least 60% flat |
| Siding | Traditional profiles in wood or fiber cement; vinyl, aluminum and T-1-11 siding prohibited |
| Windows and doors | No sliding windows or internal grids; paneled doors; flush doors prohibited in the Central City |
Source: City of Sacramento, Accessory Dwelling Unit Design Standards for Historic Properties, Standards 1.1 to 3.5.
The height rule uses a simple test. The standards' own example: a "16' TALL HISTORIC BUILDING X 150% = 24' TALL ADU." Two parcels are adjacent "if they share a rear or side property line." A matching roof shares "the same type, orientation, and slope range (within ±10 degrees)." Siding must match the historic building's orientation, its exposure width within one inch, and its surface texture. If a design cannot meet a standard, the owner may revise it or apply for site plan and design review to deviate, which is discretionary. Alterations to the historic building itself, such as an attached ADU, go through site plan and design review.
The Mills Act and Other Incentives
A Mills Act contract lowers property taxes in return for keeping up a historic building. Landmarks, contributing resources in a local district and properties on the state or national register qualify. Sacramento amended its Mills Act section, City Code 17.604.720, in 2018. Applications are due July 1 each year and need a 10-year workplan, the grant deed, the latest tax bill and photos. The City Council decides; if it denies, the owner must wait one year.
The fees are $4,603 for a building of 2,500 square feet or less and $8,416 for 2,501 square feet or more, with a five-year workplan and inspection fee of $921 or $1,578, "Plus an 8% technology and administrative overhead surcharge on all fees." If the City cancels a contract for breach, state law lets it charge "a cancellation fee equal to 12 ½ percent of the property's current fair market value." The City and Sacramento Heritage, Inc. also run a Historic Places Grant Program for projects "between $1,000 and $24,999." For a missing middle project, the General Plan adds one more relief: Policy LUP-3.10 waives minimum density and minimum floor area for a non-residential historic building converted to housing.
The Sacramento Tenant Protection Act
City Code Chapter 5.156 "shall be known and may be cited as the 'Sacramento Tenant Protection Act.'" It limits rent increases and evictions. Section 5.156.030 exempts seven kinds of units, including "A rental unit that was built after February 1, 1995," "Single dwelling units and rental units in a condominium or stock cooperative," and a unit the landlord or the landlord's immediate family occupy. The City's landlord page lists apartments and duplexes "built prior to February 1995" as covered.
"The annual rent adjustment is 5% plus the percentage of the annual increase in the cost of living adjustment, if any, but not to exceed a combined total of 10%." The City publishes the number each year: "Effective July 1, 2026, the annual rent adjustment maximum is 8.6%." Rent may rise once in 12 months. After a unit is vacated, the landlord may set a new base rent. A landlord who needs more may petition a hearing examiner for a fair rate of return. Landlords register covered units each year and pay $20 per unit, and violations can bring "administrative penalties up to $25,000 per offense," the landlord page says.
After a tenant has lived in a unit for more than 12 months, Section 5.156.090 allows eviction only for one of seven just causes. Three matter for redevelopment. "Necessary and substantial repairs" need permits, 120 days' notice and work that makes the unit uninhabitable for at least 30 days, and the tenant gets the right to return at the old rent. "Owner move-in" needs 120 days' notice and an owner who is "a natural person with at least 51% ownership." "Withdrawal of rental unit from rental market" needs at least 120 days' notice to withdraw "the unit and all of the rental units in the building and on the same parcel from the rental market for at least 12 months, including landlord's intent to demolish the rental units," and a withdrawal notice filed with the City first. The chapter "remains in effect until December 31, 2029."
Rented Homes and Each Path to More Homes
Each approval path has its own test for tenants. They are separate from the Tenant Protection Act: a unit can be lawfully vacated under Chapter 5.156 and still block a project for months or years.
| Path | Tenant and demolition test |
|---|---|
| Missing middle (Ordinance 2024-0027) | No demolition of a home under a lease in effect within 365 days before the permit is approved; no net loss of homes |
| City ministerial infill (Chapter 17.860) | No demolition of units occupied by tenants in a multi-unit dwelling (3 units) within the last year |
| SB 9 (Chapter 17.864) | No demolition or alteration of housing occupied by a tenant in the last three years; no Ellis Act withdrawal in the last 15 years |
| SB 684 (Chapter 17.868) | No demolition or alteration of housing occupied by tenants within the five years before the application |
| SB 79 | No site with more than two units where rent-controlled housing occupied by a tenant in the past seven years would be demolished |
Sources: Ordinance 2024-0027, Section 5.C; Ministerial Housing page; City forms CDD-0436, CDD-0684 and CDD-0079.
The missing middle test counts from the date the permit is approved, so a lease that ends after you apply can still stop approval. The City's FAQ words the test as a home "occupied by a tenant within the past year." The ordinance is the rule where the two differ; it speaks of "a rental or lease agreement that was in effect within 365 days before the permit is approved." A missing middle project also may not leave "Fewer dwelling units than existed."
The City's SB 9 form also bars demolishing housing "subject to any form of rent or price control through a public entity's valid exercise of its police power," and the SB 684 form has the same rule. Neither the City's forms nor Chapter 5.156 says whether a unit under the Tenant Protection Act counts as rent control for SB 9 or SB 684. Ask the Planning Division in writing before you buy a rented duplex or apartment building to redevelop.
Best For
- ✓ A vacant or owner-occupied house outside any historic district, for the fastest approval paths.
- ✓ A historic lot more than 100 feet deep with an alley, where a detached ADU fits the 30-foot separation rule.
- ✓ A landmark owner who plans to keep the historic building and apply for a Mills Act contract by July 1.
Usually Fails When
- ✕ A tenant's lease was in effect within 365 days before the missing middle permit is approved.
- ✕ An SB 9 lot split would alter a contributing structure in a historic district.
- ✕ The design adds vinyl siding or sliding windows to an ADU on a historic lot.
What To Verify Before Spending Money
- → Landmark, district and contributing resource status on the Land Information Lookup App.
- → The build date of any rental unit, which decides Tenant Protection Act coverage.
- → The lease history of every unit for the last one, three, five and seven years.
Where to Go Next
Related on VanPlex: the Sacramento overview, California rent and tenant rules and property tax and insurance.
Frequently Asked Questions
How do I know if my Sacramento house is in a historic district?
What review does a Sacramento historic property need before a building permit?
Where can a detached ADU go on a Sacramento historic lot?
How tall can an ADU be next to a historic building in Sacramento?
Can I use SB 9 on a historic property in Sacramento?
What does a Mills Act contract cost in Sacramento?
Which Sacramento rentals are covered by the Tenant Protection Act?
How much can rent go up in Sacramento in 2026?
Can I evict tenants to demolish a Sacramento rental?
When does Sacramento's Tenant Protection Act end?
Official sources (checked October 2026)
Get new guides by email
New VanPlex guides and articles on multiplex rules, building costs and permits, sent to your inbox.
Planning a multiplex in Sacramento?
VanPlex builds multiplexes in British Columbia, Canada. For a lot in Sacramento, our team makes a custom proforma by hand and emails it to you in 24 to 48 hours.
Get a proforma for your address