San Francisco | Parking, Setbacks and Height
San Francisco Parking, Setbacks and Height: RH Building Rules
Once the zoning says how many homes a lot may hold, the building rules decide whether they fit. In San Francisco the "buildable area" of a residential lot is, in the words of ZA Bulletin No. 5, "the entire lot, minus the applicable front setback, side yard, and rear yard requirement, plus permitted obstructions." This page sets out those yards, the height limits and the parking rules for the RH districts, from the Family Zoning Plan ordinance and the Zoning Administrator's bulletin.
San Francisco building rules in six facts
- San Francisco requires no off-street parking for any use; Table 151.1-1 sets maximums instead. Source: Ordinance No. 245-25, Section 151.1
- A lot with one dwelling may have up to 2.0 parking spaces, a lot with two up to 3.0, and a lot with three or more up to 1.0 per unit. Source: Ordinance No. 245-25, Table 151.1-1
- The rear yard in every RH district is 30 percent of lot depth, but in no case less than 15 feet. Source: Ordinance No. 245-25, Table 209.1
- The required front setback in RH districts matches the shorter adjacent setback and is never more than 10 feet when based on neighbors. Source: Ordinance No. 245-25, Table 209.1
- Side yards are required only in RH-1(D), on lots 28 feet and wider. Source: SF Planning, ZA Bulletin No. 5
- A dwelling in RH-1(D) may be no taller than 35 feet, and in RH-1 districts the maximum height is 35 feet regardless of the mapped limit. Source: Table 209.1 and ZA Bulletin No. 5
RH Building Standards at a Glance
| Rule | RH-1(D) | RH-1, RH-1(S) | RH-2 | RH-3 |
|---|---|---|---|---|
| Height | No dwelling taller than 35 ft | Varies, generally 40 ft on the map; 35 ft maximum in RH-1 under Section 261 | Varies, generally 40 ft; no building over 40 ft in RH-2 | Varies, generally 40 ft |
| Front setback | Shortest adjacent setback, at most 10 ft | Same | Same | Same |
| Rear yard | 30% of lot depth, at least 15 ft | Same | Same | Same |
| Side yard | Required on lots 28 ft and wider | Not required | Not required | Not required |
| Usable open space per unit | 300 sq ft private or 400 common | 300 private or 400 common | 125 private or 166 common | 100 private or 133 common |
| Parking | None required | None required | None required | None required |
Sources: Ordinance No. 245-25, Table 209.1, pages 59 to 64, checked on the page images; ZA Bulletin No. 5 for the RH-1 and RH-2 height rules of Section 261. RH-1(S) open space is 300 sq ft private for the first unit and 100 sq ft for the minor second unit.
Front Setbacks
A front setback is the strip at the front of the lot that cannot be built on. Table 209.1 sets it for all RH districts: "Based on the front setback of the adjacent property with the shortest front setback or if subject property has a Legislated Setback. When front setback is based on adjacent properties, in no case shall the required setback be greater than 10 feet." A legislated setback is a deeper setback the code sets for some lots one by one; ZA Bulletin No. 5 points to Sections 131 and 132 for them.
ZA Bulletin No. 5 (revised September 2025) gives the worked example: "if one adjacent building is set back 10 feet from its front property line and the building on the other adjacent lot is set back 5 feet from its front property line, the required front setback for your lot would be 5 feet." It adds one exception to the 10-foot cap: where "more than 75 percent of the properties on the subject block face have a setback of 15 feet or greater, and both adjacent buildings have a front setback of 15 feet or greater," the maximum is 15 feet. On a corner lot, the setback is only required along the street chosen as the front, and its depth is "one-half the depth of the adjacent building's front setback." A neighbor in an RC, C, M or P district is ignored, and the setback follows the neighbor on the other side.
The setback must also be green. Table 209.1 requires that "At least 50% of Front Setback shall be permeable so as to increase storm water infiltration and 20% of Front Setback shall be unpaved and devoted to plant material." Permeable means water can soak through it.
Rear Yards and the Pop-Out
The rear yard is the open area at the back of the lot. In every RH district, Table 209.1 sets it at "30% of lot depth, but in no case less than 15 feet," and ZA Bulletin No. 5 says that in RH, RM-1, RM-2, RTO and RTO-M districts this applies "at all levels." The yard runs the full width of the lot. By VanPlex arithmetic, a lot 100 feet deep keeps a 30-foot rear yard, leaving a building depth of 70 feet less the front setback. Any lot under 50 feet deep reaches the 15-foot floor.
The bulletin covers two special cases. On a through lot, a lot that reaches streets at both ends, a second building may be built and the rear yard moves to the middle of the lot, at "least 30% of lot depth or no less than 15 feet, whichever is greater." On a standard lot where a dwelling already stands legally at the rear, a new building may go in front with the yard between the two, at "least 25% of lot depth or no less than 15 feet." This matters for owners who plan a second building on the lot.
A permitted obstruction is a building feature allowed in a required yard, such as stairs or bay windows. The largest is the pop-out, an extension into the rear yard "that does not go into the rear 25% or 15 feet of the lot." The bulletin says it "can cover the full width of the lot if it is no higher than 10 feet above grade," or be two stories "if a 5-foot setback is provided at each side." On "a typical 100-foot-deep lot, this obstruction will allow for an additional 5 feet of depth." It cannot be added to a building that already sits in the required rear yard in a noncomplying way.
Small yard structures follow a 2025 change. Ordinance No. 146-25, effective September 8, 2025, allows accessory structures "with a maximum size of no more than 120sqft and no more than 10ft tall" in required yards, including ones with "wetbars and bathrooms," though "full kitchens and sleeping quarters are not permitted." The same ordinance lets existing noncomplying structures in side and rear yards be repaired or relocated to meet the Building Code. Housing Choice-SF projects keep the RH rear yard: the program's 18 percent rear yard excludes residential districts other than RTO-C.
Side Yards in RH-1(D)
Side yards run along the side lot lines from the front setback to the rear yard. ZA Bulletin No. 5 says "Side yards are required only in RH-1(D) (Single-Family, Detached) districts," and the width depends on lot width.
| Lot width | Side yards required in RH-1(D) |
|---|---|
| Less than 28 ft | No side yard |
| 28 ft to less than 31 ft | One side yard equal to the width over 25 ft, or two side yards of the same total, one at least 3 ft |
| 31 ft to less than 40 ft | Two side yards of 3 ft each |
| 40 ft to less than 50 ft | Two side yards of 4 ft each |
| 50 ft or more | Two side yards of 5 ft each |
Source: ZA Bulletin No. 5, Side Yards, Planning Code Section 133.
Height Limits
Each lot has a height limit on the City's Height and Bulk map, and the RH districts add their own limits in Section 261. Table 209.1 says no portion of a dwelling in RH-1(D) "may be taller than 35 feet," and that the limit in the RH-1, RH-1(S), RH-2 and RH-3 districts "Varies, but generally 40 feet." ZA Bulletin No. 5 reads the Section 261 rules this way:
- "In RH-1 districts, regardless of the mapped height limit, the maximum allowable height is 35 feet."
- In RH-1 and RH-2, the limit is 30 feet at the front lot line or front setback line, and it rises "at an angle of 45 degrees from the horizontal toward the rear of the lot" until it meets the maximum, unless the rear of the lot is 20 or more feet higher than the front.
- The RH-1 limit may rise to 40 feet where the rear is 20 or more feet higher than the front, and falls to 30 feet where the rear is 20 feet lower and 25 feet where it is 40 feet lower.
- "In RH-2 Districts, no building is permitted to exceed a height of 40 feet," and the limit falls to 35 feet where the rear of the lot is 20 or more feet lower than the front.
The bulletin dates from September 2025, before the Family Zoning Plan. The plan's ordinance changed the wording of the RH-1 to RH-2 cell in Table 209.1 but did not list Section 261 among the sections it amended, so the slope and front limits above still read as the code's rules. SF Planning describes the existing limit off the corridors as "typically 4 stories." On R-4 lots, a Housing Choice-SF project uses the second height number on the map, and Section 261 does not apply. State Program ADUs have their own heights: 18 feet plus 2 feet for a roof pitch for a detached ADU, and 25 feet for an attached ADU.
Parking: No Minimum, Set Maximums
The Family Zoning Plan deleted Section 151, the old table of required parking, and rewrote Section 151.1. The new text, checked on the page image, says: "Off-street accessory parking shall not be required for any use, and the quantities of off-street parking specified in Tables 151.1-1 and 151.1-2 shall serve as the maximum amount of off-street parking that may be provided." For dwellings in most districts, Table 151.1-1 allows "up to 2.0 parking spaces on Lots with one Dwelling Unit; P up to 3.0 parking spaces on Lots with two Dwelling Units; P up to 1.0 parking space for each Dwelling Unit for Lots with three or more Dwelling Units."
| Transit tier | Area | Maximum residential parking |
|---|---|---|
| Tier 1 | Within a half mile of Embarcadero, Montgomery, Powell or Civic Center BART, or Salesforce Transbay Transit Center | 0.375 space per unit |
| Tier 2 | Within a half mile of 16th Street, 24th Street, Glen Park or Balboa Park BART | 0.5 space per unit |
| Tier 3 | Within a half mile of Muni rail stops on the F, J, K, L, M, N or T lines, Caltrain stations and Van Ness Bus Rapid Transit stops | 1.0 space per unit |
| Tier 4 | Within a half mile of ferry terminals, including the Ferry Building, 16th Street/Mission Bay and Treasure Island | 1.0 space per unit |
Source: Ordinance No. 245-25, Table 151.1-2, pages 135 to 137, checked on the page images. Where a site falls in a tier, "the lower of the maximum limits in either Table 151.1-1 or Table 151.1-2 shall apply."
The tiers come from the Metropolitan Transportation Commission's Transit-Oriented Communities policy, which the ordinance follows, and the half mile is measured by that agency's method. By VanPlex arithmetic, a fourplex within a half mile of 24th Street BART may have two spaces, while the same building elsewhere may have four. Parking above the maximum is a separate use that needs its own approval.
A 2026 ordinance changed what counts as parking. Since March 15, 2026, the code permits "parking of up to two operable vehicles" in residential driveways, even in required front setbacks and yards, and that parking is exempt from "screening requirements, setback requirements, and parking maximums." Boats, trailers, recreational vehicles, mobile homes and buses are excluded, and vehicles "may not encroach onto the public right-of-way." For SB 9 projects, state law lets a city require at most one space per unit, but San Francisco requires none.
Best For
- ✓ A deep RH-2 or RH-3 lot where a 30 percent rear yard still leaves room for four units.
- ✓ A project near BART or Muni rail that plans little or no parking.
- ✓ An owner who wants a shed or studio of up to 120 sq ft in the yard without a variance.
Usually Fails When
- ✕ The design ignores the 30-foot front height limit and 45-degree rise in RH-1 and RH-2.
- ✕ The plan counts on an old parking minimum or plans more spaces than the transit tier allows.
- ✕ A pop-out is drawn on a building that already sits in the required rear yard.
What To Verify Before Spending Money
- → Adjacent front setbacks and the share of the block face set back 15 feet or more.
- → The front-to-rear slope of the lot, which changes the RH-1 and RH-2 height limits.
- → Whether the lot falls in a Transit-Oriented Communities parking tier.
Where to Go Next
Related on VanPlex: the San Francisco overview and is your lot eligible.
Frequently Asked Questions
Do I need to provide parking for new homes in San Francisco?
How much parking can I build for a fourplex in San Francisco?
How deep is the rear yard in San Francisco RH zoning?
What front setback is required in San Francisco?
How tall can I build in an RH-2 district in San Francisco?
Do San Francisco houses need side yards?
Can I park in my driveway in San Francisco?
Can I build a shed in my rear yard in San Francisco?
How much open space does each unit need in an RH-3 district in San Francisco?
What is the pop-out rule for San Francisco rear yards?
Official sources (checked October 2026)
Get new guides by email
New VanPlex guides and articles on multiplex rules, building costs and permits, sent to your inbox.
Planning a multiplex in San Francisco?
VanPlex builds multiplexes in British Columbia, Canada. For a lot in San Francisco, our team makes a custom proforma by hand and emails it to you in 24 to 48 hours.
Get a proforma for your address