Key SSMUH changes for 2026-2027

Reduced parking minimums near transit

SSMUH projects within 400m of frequent transit now require only 0.5 parking spaces per unit, down from 1.0. This reduces construction costs by $30,000-$60,000 per project and allows more efficient site layouts with additional green space or larger units.

Pre-approved design guidelines

Burnaby introduced pre-approved design guidelines for common multiplex configurations (3-unit and 4-unit). Projects following these guidelines receive expedited review, typically reducing processing time by 4-6 weeks.

Clarified transit proximity bonus

Burnaby clarified that lots within 400m of a SkyTrain station or frequent bus route can build up to 6 units (previously ambiguous for some areas). The measurement is now from the lot boundary to the transit stop, not the building.

Online submission expansion

Burnaby expanded its digital permit portal to accept all SSMUH applications online, with real-time status tracking and digital plan review comments.

Updated fee schedule

Burnaby adjusted fees in 2026 to reflect updated infrastructure costs. Development Cost Charges increased 4-6%, while Building Permit fees saw a modest 2-3% increase. However, reduced parking requirements for transit-adjacent projects can offset these increases by lowering construction costs.

2025 Fees

  • DCC: $14-$26/sq ft
  • BP fees: $11,000-$23,000
  • Parking: 1.0 space/unit (all locations)

2026-2027 Fees

  • DCC: $15-$28/sq ft
  • BP fees: $12,000-$25,000
  • Parking: 0.5 space/unit (near transit)

FAQs

What SSMUH changes did Burnaby make?

Key changes include reduced parking near transit, pre-approved design guidelines for faster review, clarified transit proximity bonus for 6-unit projects, and expanded online submissions.

Did parking requirements change?

Yes. Projects within 400m of frequent transit now require only 0.5 spaces per unit, saving $30,000-$60,000 in construction costs per project.

Are fees higher?

DCCs increased 4-6% and BP fees increased 2-3%. Reduced parking requirements partially offset these increases for transit-adjacent projects.