Los Angeles | Lots and Subdivisions
Los Angeles Lot Size and Subdivisions: SB 9 Splits, SHRA Maps and Small Lots
Selling homes on separate lots in Los Angeles means dividing the land first. A subdivision is the legal split of one lot into two or more, shown on a recorded map. This page covers the routes the City offers: the ordinary parcel map, the SB 9 urban lot split, the state Starter Home Revitalization Act maps of up to 10 lots, and the City's own small lot subdivision. The Los Angeles overview gives the short version.
Los Angeles lot splits in six facts
- In Los Angeles, a lot may be divided into two, three or four parcels only as shown on a parcel map approved by the Advisory Agency and recorded with the County Recorder. Source: LAMC Chapter 1A, Sec. 13B.7.5
- An SB 9 urban lot split in Los Angeles creates two lots, each at least 1,200 square feet and at least 40 percent of the original lot. Source: LA City Planning, Senate Bill 9
- A lot created by an urban lot split may hold at most two dwelling units of any kind, ADUs and junior ADUs included. Source: LA City Planning, SB 9 memo
- Under the Starter Home Revitalization Act, Los Angeles approves maps of up to 10 lots ministerially, with new lots of at least 600 square feet in multifamily zones. Source: LA City Planning, SHRA memo
- A small lot subdivision under LAMC 12.22 C.27 is allowed in the RD, R3, R4, R5, RAS, P and C zones, with lots of at least 600 square feet and 18 feet of width. Source: Ordinance No. 185,462
- The Advisory Agency must approve, conditionally approve or disapprove a preliminary parcel map within 30 days after it is filed, unless the applicant agrees in writing to more time. Source: LAMC Chapter 1A, Sec. 13B.7.5
Six Ways to Change a Lot in Los Angeles
Each route below has its own size rules and decision maker. The Advisory Agency is the City Planning official who decides subdivision maps. A ministerial approval is one given by checking fixed, written standards, with no public hearing and no room for the City to say no on judgment.
| Route | Lots | Zones | Who decides |
|---|---|---|---|
| Parcel map | 2 to 4 parcels | Any zone, if each lot meets the zone | Advisory Agency, with a public hearing unless waived |
| Tentative and final tract map | 5 or more | Any zone, if each lot meets the zone | Advisory Agency |
| SB 9 urban lot split | 2 | A, RA, RE, RS, R1, RU, RZ, RW1 and 1L | City Planning, no hearing, 60 days |
| SHRA (SB 684 and SB 1123) | Up to 10 | Multifamily zones, or vacant single-family lots | City Planning, no hearing, 60 days |
| Small lot subdivision | Set by zone density | RD, R3, R4, R5, RAS, P and C | Parcel or tract map plus a Director clearance |
| Lot line adjustment | No new lots, 4 or fewer parcels | Any | Map Processing Unit |
Sources: LAMC Chapter 1A, Sec. 13B.7.5; City Planning SB 9 page; SHRA page; Ordinance No. 185,462; Map Processing page.
The minimum lot size of each zone still governs an ordinary map: 5,000 square feet and 50 feet of width in R1, 7,500 square feet and 60 feet in RS, and so on, as listed on the zoning districts page. A lot must also have street frontage. The City's SHRA memo describes the LAMC 12.03 definition of a lot as requiring "that a lot front for at least 20 feet on a street or private street easement and that it maintain a minimum 20-foot wide access strip." The SB 9, SHRA and small lot routes each set their own smaller lot sizes and relax that frontage rule in their own ways.
The Ordinary Parcel Map
Sec. 13B.7.5 of Chapter 1A, which applies to lots under both zoning codes, says "No land shall be separated in ownership or otherwise divided into two, three, or four parcels or condominiums" unless the division matches a parcel map "approved by the Advisory Agency and recorded with the Los Angeles County Recorder." Five or more lots need a tentative tract map, and the City Planning SHRA page describes the two as a "Parcel Map (up to four lots) or Tract Map (5-10 lots)."
The section sets the steps. The Advisory Agency holds a public hearing, with notice 10 days ahead by newspaper, by mail to owners and occupants within 500 feet and to the Certified Neighborhood Council, and by a notice the applicant posts on the property. The hearing may be waived when the applicant files "the written approval of the owners of all properties abutting, across the street or alley from, and/or having a common corner with" the map. The City Engineer and, in a Hillside Area, the Superintendent of Building report within 21 days; the Fire Department reports within seven days on whether each building site is within 1,000 feet of a City fire hydrant.
The Advisory Agency "shall review and either approve, conditionally approve or disapprove the map within 30 days after map is filed," or within 44 days after required geology and soils reports are submitted. A disapproval must be in writing with reasons. The Advisory Agency must find, among eight findings, that the site is "physically suitable for the proposed density of development." An appeal goes to the Appeal Board and must be filed "within a period of 15 days after the date the initial decision was made" (Sec. 13B.7.8). After approval, the subdivider has 36 months to file the final map with the City Engineer, and extensions may not exceed a total of 72 months.
No building permit is issued on land divided into two to four parcels in violation of the section "unless a parcel map is recorded with the Los Angeles County Recorder." A dedication is land given to the City, such as a strip for a wider street. The Advisory Agency may require dedications and street improvements as conditions, and may modify or waive them when it finds that action "is in the public interest."
SB 9 Urban Lot Splits in Los Angeles
SB 9 (2021) lets an owner split a single-family lot in two without meeting the zone's minimum lot size. City Planning's SB 9 page lists the eligible zones as "A, RA, RE, RS, R1, RU, RZ, & RW1" in Chapter 1 and the 1L density district in Chapter 1A. The state rules in Government Code 66411.7 set the sizes, and the City repeats them: "No resulting parcels may be smaller than 40 percent of the lot area of the original parcel proposed for subdivision. Furthermore, both new lots must be at least 1,200 square feet."
The City adds its reading of the two-home limit. Its SB 9 memo says "ADUs and JADUs are not permitted on parcels that use both the Urban Lot Split and Two Unit Development allowances, either together or at different times." So each new lot holds two homes at most: two houses, a duplex, or a house and an ADU. The memo also lists the site limits: no earlier recorded urban lot split on the lot, no split of an adjacent lot by the same owner or someone acting with the owner, and only residential uses on the new lots.
One rule reads differently in the City memo and the statute. The memo says the owner must intend to live in one of the homes "for a minimum of three years from the date of the recordation of an Urban Lot Split Parcel Map." Government Code 66411.7(g)(1) says "three years from the date of the approval of the urban lot split." The statute controls, and the City's form is what you sign, so ask City Planning which date it will enforce before you plan a sale.
Historic districts follow AB 1061 (2025). The memo says urban lot splits are allowed in HPOZs and California Register districts, but the split may not require "demolition or alteration of a contributing structure or any existing exterior structural wall of a structure located within the district." Lots that are individually designated Historic-Cultural Monuments stay ineligible. In the Coastal Zone, a Coastal Development Permit is also required, and "The SB 9 project cannot proceed until the CDP is approved."
The process: the owner files forms CP-3604 and CP-3605 at a City Planning Development Services Center, plus a habitat form. "All SB 9 projects (Two Unit Developments and Urban Lot Splits) must be approved or denied within 60 days of the date the City receives a completed application." LADBS may check building plans at the same time, "but no building permit may be issued until the final map is effectuated by the recordation of a final Parcel Map." The City may not require dedications or off-site improvements for the parcels themselves, but the memo says "any such requirements would still apply for the construction of residential units."
The SHRA: Up to 10 Lots by Right
The Starter Home Revitalization Act (SHRA) is the state law amended by SB 684 and SB 1123. City Planning's memo of October 28, 2025 says it "establishes a ministerial approval process for a parcel map or a tentative and final map for a subdivision resulting in 10 or fewer parcels." The City lists the eligible multifamily zones as "R2, RD, RW2, R3, RAS3, R4, RAS4, R5, and all C Zones," and the eligible single-family zones, when the lot is vacant, as "A, RA, RE, RS, R1, RU, RZ, and RW1."
| SHRA rule in Los Angeles | Number |
|---|---|
| Lots and homes | No more than 10 parcels and 10 homes, not counting a remainder parcel, ADUs or junior ADUs |
| Site size | Under 5 acres in a multifamily zone; under 1.5 acres and vacant in a single-family zone |
| New lot size | At least 600 sq ft (multifamily zones) or 1,200 sq ft (single-family zones) |
| Average home size | No more than 1,750 net habitable sq ft across the homes |
| Minimum density, sites outside the Housing Element list | The greater of 66 percent of zone density or 20 homes per acre (1 per 2,178 sq ft) |
| Floor area ratio the City must allow | At least 1.0 for 3 to 7 homes, 1.25 for 8 to 10 homes |
| Side and rear setbacks from the original lot lines | No more than 4 feet |
| Parking | No more than 1 space per home, none near qualifying transit or car share; no covered parking rule |
Source: LA City Planning, SHRA implementation memo (October 28, 2025) and SHRA page, applying Government Code 65852.28 and 66499.41.
The memo explains what local rules give way. Zone density "cannot be used to prohibit the creation of up to 10 parcels or 10 units," so the count depends on how many 600 or 1,200 square foot lots fit. The City may not set a minimum lot width, depth or frontage, may not require setbacks between the new homes, and must allow a floor area ratio of at least 1.0 or 1.25. Height limits still apply, and in single-family zones the City may deny relief from them. The Advisory Agency may require dedications and off-site improvements as conditions of the map.
Several sites are excluded. The SHRA does not apply in "High or very high fire hazard severity zones," in wetlands, on habitat for protected species, or on land under a conservation easement. A project may not demolish or alter housing occupied by a tenant "within the five years prior to the application date," housing under the Rent Stabilization Ordinance (RSO, the City's rent control law), or covenanted affordable housing. Existing homes on the lot "may not be legally separated as part of a SHRA subdivision." Applications go to City Planning and are decided within 60 days, at the normal parcel map or tract map fee.
State law is changing again. The Legislature's database shows Government Code 66499.41 and 65852.28 as amended by SB 1090 (Chapter 1006, Statutes of 2026), with new versions operative January 1, 2027. The SB 684 and SB 1123 page tracks those changes; the City memo describes the law in force in 2025 and 2026.
The City's Small Lot Subdivision
Los Angeles had its own small-lot rule long before the SHRA. LAMC 12.22 C.27, rewritten by Ordinance No. 185,462 (effective April 18, 2018), aims "to create alternative fee-simple home ownership within the multifamily and commercial zones." Fee-simple ownership means each buyer owns the land under the home outright, with no condominium association owning the ground. "A small lot subdivision shall be permitted in the RD, R3, R4, R5, RAS and the P and C zones pursuant to an approved tract or parcel map." The ordinance's title says it was written to "restrict small lot subdivisions from R2 zones."
- Each small lot may hold one, two or three homes, and the whole subdivision must meet the zone's lot area per home.
- "The minimum lot width shall be 18 feet and the minimum lot area shall be 600 square feet."
- Lot coverage by all structures may not exceed 75 percent of a small lot, unless the map provides an open space easement of 25 percent of the lot area.
- No yards are required between interior lot lines; the zone's front yard applies along the street.
- Along the outer edge, a side yard of at least 5 feet and a rear yard of at least 10 feet, or 5 feet at an alley; next to an R1 or stricter zone, the zone's own yards apply.
- No permit is issued until the Director of Planning finds that the project complies with the Small Lot Design Standards, a ministerial clearance filed with the map.
The same ordinance lets owners subdivide existing group dwellings, bungalow courts and detached single, duplex and triplex buildings that are more than 45 years old, so each home can be sold on its own small lot. A bungalow court is "A group of three or more single, duplex or triplex dwelling structures oriented around a shared outdoor space on a single parcel." Existing homes keep the parking on their latest permit.
The Low-Rise Ordinance of June 2026 adds a third set of small-lot numbers for its own projects: a minimum lot area of 600 square feet, a minimum lot width of 15 feet, and "A three-foot pedestrian access easement may be provided in lieu of vehicular access requirements." The three or more homes page explains where that ordinance applies.
City Planning is rewriting these rules. Its Missing Middle LA program released second drafts of a new Small Lot Subdivision Ordinance and a "Starter Home Bonus Program" in September 2026 and set a webinar and public hearing for October 1, 2026. These are drafts; the 2018 rules above apply until the City Council adopts a change.
Lot Line Adjustments and Certificates of Compliance
Two smaller tools fix lot lines without a subdivision. City Planning's Map Processing page says a lot line adjustment lets "four or fewer existing adjacent parcels relocate their lot lines, taking land from one parcel and adding it to an abutting parcel, but creating no more parcels than originally existed." A certificate of compliance certifies "that a parcel of land is legal and complies with the Subdivision Map Act and local zoning laws," which matters when an old lot was created by deed. The base City Planning fees in Ordinance No. 188,796 are $5,517 for a lot line adjustment and $4,193 for a certificate of compliance determination, plus Bureau of Engineering fees; the permits and fees page lists them.
Best For
- ✓ A single-family lot of 2,400 sq ft or more that can split into two lots of at least 1,200 sq ft each.
- ✓ A vacant single-family lot under 1.5 acres, or a multifamily lot under 5 acres, for an SHRA map of up to 10 lots.
- ✓ An RD or R3 lot where small lots of 600 sq ft and 18 ft fit the zone density.
Usually Fails When
- ✕ The plan adds an ADU to a lot created by an SB 9 split.
- ✕ A tenant lived in the home in the past three years (SB 9) or five years (SHRA).
- ✕ The site is in a high or very high fire hazard severity zone and the plan relies on the SHRA.
What To Verify Before Spending Money
- → The SB 9 and SHRA eligibility checklists in ZIMAS for the lot.
- → Which date City Planning uses to start the three-year residence affidavit.
- → The current City Planning fee for the map, which adjusts each July 1.
Where to Go Next
Related on VanPlex: the Los Angeles overview, SB 9 in California and SB 684 and SB 1123.
Frequently Asked Questions
Can I split my lot in Los Angeles under SB 9?
How many homes can I build after an SB 9 lot split in Los Angeles?
Do I have to live in the house after an SB 9 lot split in Los Angeles?
What is the minimum lot size for a small lot subdivision in Los Angeles?
Can I do a small lot subdivision in the R2 zone in Los Angeles?
What is the SHRA and how does Los Angeles apply it?
Can I use the SHRA on a lot with an existing house in Los Angeles?
How long does a parcel map take in Los Angeles?
Do neighbors get notice of a parcel map in Los Angeles?
What is a lot line adjustment in Los Angeles?
Official sources (checked October 2026)
Get new guides by email
New VanPlex guides and articles on multiplex rules, building costs and permits, sent to your inbox.