David Babakaiff
Written by David Babakaiff · Co-Founder, VanPlex | 25+ Years BC Construction Last reviewed: October 2026

Los Angeles | Permits and Fees

Los Angeles Permits and Fees: Review Paths, Deadlines, Map Fees, Linkage and Park Fees

A Los Angeles housing project passes through several City offices. LADBS, the Department of Building and Safety, issues building permits. City Planning checks zoning, decides subdivision maps and runs the bonus programs. The Los Angeles Housing Department (LAHD) rules on replacing existing rental units. This page gives the review paths, the deadlines in City and state law, and the fees the City publishes. The Los Angeles overview gives the short version.

Los Angeles permits and fees in six facts

The Building Permit at LADBS

"A permit from LADBS is required for any private property construction, alteration, or repair work on buildings within the City of Los Angeles," the LADBS plan review page says. Plan check is the review of drawings against the building and zoning codes before a permit issues. LADBS offers four paths:

  • Express Permits, "for simple projects, which do not require plan check. Can be done on-line."
  • Counter Plan Check, for "simple projects that require a plan check," issued over the counter.
  • Expanded Counter Plan Check, for "modest projects like multi-floor tenant improvements and medium-sized home additions."
  • Regular Plan Check, for "large, complex projects."

Plans go in through ePlanLA, "short for Electronic Plan Review Los Angeles," where "The entire plan check process will be done electronically, including verification and permit issuance." LADBS also offers a preliminary plan check meeting with a plan check engineer before plans are filed, and a Building Permit Clearance Handbook that lists the sign-offs other agencies must give. A clearance is an approval from another office or agency that LADBS needs before it issues the permit.

Zoning is now checked by City Planning. The City Planning summary's January 2026 update records "Zoning Review's transfer from the Department of Building and Safety (LADBS) to the Department of City Planning (DCP)." The Zoning Review page says applications that need a zoning check "are automatically routed to City Planning's Zoning Review Division via ePlanLA," so "a separate request for Zoning Plan Check is not necessary." A Preliminary Zoning Assessment, an early informational zoning review, "is a City Planning application requirement for most housing projects."

LADBS bases its own plan check and permit fees on the cost of the work. For pre-approved ADU plans, its Standard Plan Program says "building plan check and permit fees will be based on the total project valuation (total cost of construction)." LADBS links a permit fee calculator from its plan review page; this guide gives no LADBS fee amounts.

Deadlines in City and State Law

State law sets short clocks for the small-housing paths, and the City code sets the clock for parcel maps. "Deemed approved" means the application is treated as approved by law if the City misses the deadline.

Application Deadline Source
ADU or junior ADU permit 60 days from a complete application, or deemed approved ZA Memo 143, Q.24; Gov. Code 66317
SB 9 two-unit project or urban lot split 60 days from a complete application, or deemed approved SB 9 memo; Gov. Code 65852.21(h)
SHRA parcel or tract map (up to 10 lots) 60 days from a complete application SHRA memo
Preliminary parcel map 30 days after filing, or 44 days after geology and soils reports LAMC Ch. 1A Sec. 13B.7.5
Appeal of a parcel map decision Filed within 15 days; heard within 30 days after the appeal period LAMC Ch. 1A Sec. 13B.7.8
Final parcel map Filed within 36 months of approval; extensions up to 72 months in total LAMC Ch. 1A Sec. 13B.7.5

Sources: ZA Memo 143, SB 9 memo, SHRA memo, LAMC Chapter 1A, Article 13.

For ADUs, ZA Memo 143 says the 60 days run "of receiving a complete application, including payment of fees," and that "Denials are in the form of written comments explaining the deficiencies and what is needed to correct them." For SB 9, the City's memo says a denial needs a written finding of "a specific, adverse impact" on public health and safety, and "If denied, the 60 day clock would reset when a revised application that addresses the comments is received." SHRA applications "will not be deemed complete by City Planning until all required fees from Advisory Agency departments are paid."

Owners can lock in the City's rules early. City Planning's Housing Crisis Act page describes an optional Vesting Preliminary Application (form CP-4062) that "vests or "locks in" local ordinances, policies, or standards adopted and in effect when the complete HCA Vesting Preliminary Application is submitted." It must be filed before the planning application or building plan check, and "These vesting rights do not apply to changes in State law or to changes in the building code."

City Planning Fees

City Planning's Fee Estimator page says the City Council "approved a comprehensive fee update which will be effective February 23, 2026," Ordinance No. 188,796. The ordinance lists base fees and says "The next annual inflation adjustment shall automatically take effect on July 1, 2026," based on the Consumer Price Index for the Los Angeles area. The amounts below are the base fees as printed; the amounts charged after July 1, 2026 include that adjustment. Use the Fee Estimator or ask a public counter for the current figure.

Application Base fee
Preliminary parcel map, residential, up to 4 lots, single-family zones $14,978
Preliminary parcel map, residential, up to 4 lots, multi-family $15,419
Tentative tract map, single-family zones, 5 to 49 lots $14,260
Tentative tract map, multi-family residential, 5 to 49 units $15,309
Bureau of Engineering fee, each parcel map application $8,240
Bureau of Engineering fee, final parcel map $8,240
Parcel map exemption (lot line adjustment) $5,517, plus $1,262 Bureau of Engineering
Parcel map waiver $1,765
Certificate of compliance determination $4,193, plus $1,262 Bureau of Engineering
Administrative Review, Major (the class City Planning uses for an SB 9 lot split) $8,496
Expanded Administrative Review, density bonus programs $12,798
Coastal Development Permit, Administrative Review (ADU) $12,688
Building Permit Clearance, Minor / Major $221 / $1,214

Source: Ordinance No. 188,796, LAMC 19.01 and 19.02 as amended, effective February 23, 2026. Bureau of Engineering tract map fee: $8,240 for each tract of fewer than 20 lots.

Three additions can raise the bill. First, a General Plan Maintenance Surcharge: the ordinance adds "a surcharge in an amount equal to the greater of 7 percent of the fee or $1.00," and the Fee Estimator page says "Effective June 9, 2026, the Los Angeles City Planning General Plan Maintenance Surcharge (GPMS) will increase from 7% to 10%." Second, fire zones: a preliminary parcel map in a Very High Fire Hazard Severity Zone pays "a surcharge of one-third" of the map fee, a tentative tract map one-half, and the Bureau of Engineering adds 50 percent to its final parcel map fee. Third, hourly billing: City Planning "reserves the right to seek reimbursement of the actual costs" when a case uses more staff time than the average.

City Planning's SB 9 FAQ says the fee for an SB 9 urban lot split parcel map "is classified as Administrative Review - Major," listed above, and that "Parcel map fees from other City agencies will also be required." The SHRA page says SHRA maps pay "the normally applicable Parcel Map (up to four lots) or Tract Map (5-10 lots) application fees."

The Affordable Housing Linkage Fee

The linkage fee is a charge per square foot on new market-rate housing that pays for affordable housing. LAMC 19.18 says the applicant "must pay to the City the required Linkage Fee as a condition of the building permit." The rate depends on the Market Area, a fee zone on City maps. City Planning's memo of April 22, 2026 attaches the schedule effective July 1, 2025, which reflects a 3.0 percent inflation adjustment, and new Market Area maps adopted March 25, 2026.

Use Low Medium Medium-High High
Residential, 2 to 5 units in a project $1.28 $1.28 $1.28 $23.20
Residential, 6 or more units $10.32 $12.90 $15.47 $23.20
Single-family detached home $10.32 $12.90 $15.47 $23.20
Net loss of housing units (added to other fees) $3.86 $3.86 $3.86 $3.86

Dollars per square foot. Source: LA City Planning, Affordable Housing Linkage Fee Schedule Effective July 1, 2025, in the memo of April 22, 2026. VanPlex found no schedule dated July 1, 2026 on the City Planning site.

Timing decides the rate: "all projects that are subject to the AHLF shall pay the applicable fee amount that is in place at the time of building permit issuance." Projects "issued building permits on or after April 24, 2026, shall be processed under the "2026 Market Area maps"." The fee counts only added homes: "Additional Housing Units" means a net increase in the number of homes, "after subtracting the number of dwelling units or guest rooms legally removed from the same parcel of real property during the year preceding the issuance of the building permit."

LAMC 19.18 B.2 lists the exemptions LADBS applies, among them:

  • "New construction of any single- family detached home located in a single- family zone that is 1,500 square feet or less of Floor Area," and additions or replacements adding 1,500 square feet or less.
  • "An Accessory Dwelling Unit."
  • Housing with set shares of covenanted affordable units for at least 55 years (such as 20 percent lower income), "or any project approved pursuant to Section 12.22 A.38," which includes Low-Rise and other MIIP projects.

A larger addition or a replacement home that adds 1,501 square feet or more in a single-family zone is exempt only if the owner records a covenant "requiring the owner of the property to pay the Linkage Fee if the home is sold within three years." An applicant may protest the fee under Government Code 66020.

Park Fee, School Fee and Other Charges

Park Fee. LAMC 19.17, as restated in Ordinance No. 188,796, says "The following fees shall be paid to the Department of Recreation and Parks. Current figures are located in the Department of Recreation and Parks Rate and Fee Schedule." It has two rates per home: a subdivision (Quimby in-lieu) fee and a non-subdivision (park mitigation) fee, each adjusted every year. The Recreation and Parks fee pages refused automated requests for this guide, so this page gives no amounts. City Planning's SB 9 FAQ says "Park Fees will be calculated by the Department of Recreation and Parks after an applicant submits the Park Fee Calculation Application." ADUs and junior ADUs are exempt.

School fee. School districts charge new homes per square foot, up to a state cap. The State Allocation Board's item of January 28, 2026 lists the 2026 maximum Level I assessment for residential development at $5.38 per square foot. City Planning says SB 9 homes owe "the Los Angeles Unified School District (LAUSD) Developer Fee," and ZA Memo 143 says school fees apply to ADUs over 500 square feet. The impact fees page explains the state rules.

City taxes. ZA Memo 143 names two more City charges on new homes, the "Residential Development Fee (LAMC 21.13.3) and Dwelling Unit Construction Tax (LAMC 21.10.3)," which state law limits for ADUs. VanPlex did not find their current rates in a City document it could open.

Replacement review. A project that demolishes housing needs a Replacement Unit Determination from LAHD "as part of a complete application to City Planning or, if the project does not require a City Planning application, through the building permit clearance process with LADBS," or a No Net Loss Declaration when it qualifies. The three or more homes page covers the replacement rules.

Best For

  • ✓ A 2 to 5 unit project outside the High Market Area, where the linkage fee is $1.28 per square foot.
  • ✓ An ADU, which skips the linkage fee and the park fee and gets a 60-day decision.
  • ✓ An owner who files an HCA Vesting Preliminary Application before a known rule change.

Usually Fails When

  • ✕ The budget used the base fees in Ordinance No. 188,796 after the July 1, 2026 adjustment and the 10 percent surcharge.
  • ✕ The lot sits in the High Market Area on the 2026 maps and the plan assumed $1.28 per square foot.
  • ✕ The map is in a Very High Fire Hazard Severity Zone and the surcharge was left out.

What To Verify Before Spending Money

  • → Current City Planning fees in the Fee Estimator.
  • → The Market Area of the lot on the 2026 linkage fee maps.
  • → The park fee from the Department of Recreation and Parks.

Where to Go Next

Related on VanPlex: the Los Angeles overview, impact fees in California and CEQA and permit streamlining.

Frequently Asked Questions

How much does a parcel map cost in Los Angeles? +
Ordinance No. 188,796, effective February 23, 2026, sets a base City Planning fee of $14,978 for a preliminary parcel map of up to four lots in a Los Angeles single-family zone and $15,419 in a multi-family zone. The Bureau of Engineering adds $8,240 for each map. These base fees adjust for inflation each July 1, starting in 2026.
What is the City Planning fee for an SB 9 lot split in Los Angeles? +
Los Angeles City Planning classifies the application fee for an SB 9 urban lot split parcel map as Administrative Review, Major. Ordinance No. 188,796 lists that fee at a base of $8,496, adjusted for inflation each July 1. Other City agencies charge parcel map fees too, and the new homes may owe park, school and linkage fees.
Who checks zoning on a building permit in Los Angeles? +
The January 2026 City Planning zoning summary records the transfer of zoning review in Los Angeles from LADBS to the City Planning Zoning Review Division. LADBS routes permit applications that need it through ePlanLA, so no separate request is needed. For most housing projects, City Planning also requires a Preliminary Zoning Assessment with the planning application.
When is the linkage fee paid in Los Angeles? +
The Los Angeles Affordable Housing Linkage Fee is a condition of the building permit. Under LAMC 19.18, all projects subject to the fee pay the amount in place at the time of building permit issuance. Projects issued permits on or after April 24, 2026 use the 2026 Market Area maps, which set the rate for each lot.
Is a new single-family home exempt from the linkage fee in Los Angeles? +
A small one is. LAMC 19.18 B.2(e) exempts new construction of a single-family detached home of 1,500 square feet or less in a Los Angeles single-family zone, additions of 1,500 square feet or less, and replacements that add no more than 1,500 square feet. Larger additions or replacements record a covenant to pay if the home sells within three years.
How much is the park fee for a new home in Los Angeles? +
The Los Angeles Park Fee is set in LAMC 19.17 and paid to the Department of Recreation and Parks, with a subdivision rate and a non-subdivision rate per home that adjust each year. Current amounts are in the department Rate and Fee Schedule, which refused automated requests for this guide. ADUs and junior ADUs are exempt from the Park Fee.
What school fee applies to new homes in Los Angeles? +
California caps the Level I school fee, and the State Allocation Board set the 2026 maximum for residential development at $5.38 per square foot on January 28, 2026. Los Angeles City Planning says SB 9 homes are assessed the LAUSD Developer Fee, and ZA Memo 143 says school fees apply to ADUs larger than 500 square feet.
Can I lock in the Los Angeles rules before I apply? +
Yes, with an optional Housing Crisis Act Vesting Preliminary Application, form CP-4062, filed with Los Angeles City Planning before the planning application or building plan check. City Planning says it locks in the local ordinances, policies and standards in effect when the complete preliminary application is submitted. It does not lock in later state law or building code changes.
What happens if Los Angeles misses the 60-day ADU deadline? +
The ADU application is deemed approved. ZA Memo 143 says Los Angeles departments, including LADBS, City Planning and LADWP, must approve or deny an ADU application within 60 days of receiving a complete application, including fee payment, and a denial must list the deficiencies in writing. The same 60-day deemed-approved rule applies to SB 9 projects.
What surcharges are added to Los Angeles planning fees? +
Ordinance No. 188,796 adds a General Plan Maintenance Surcharge of 7 percent to Los Angeles planning fees, and City Planning says that surcharge rose to 10 percent on June 9, 2026. Maps in a Very High Fire Hazard Severity Zone pay an extra one-third (parcel maps) or one-half (tract maps). City Planning may also bill hourly when a case takes more staff time.

Official sources (checked October 2026)

LADBS, Plan Review and Permitting
https://dbs.lacity.gov/services/plan-review-permitting
LA City Planning, Zoning Review
https://planning.lacity.gov/project-review/zoning-review
Ordinance No. 188,796, City Planning fees (PDF)
https://planning.lacity.gov/odocument/1610be5a-24d8-4e94-8e35-3df61426141d/Ordinance_188796_with_Director_Memo.pdf
LA City Planning, Fee Estimator
https://planning.lacity.gov/project-review/fee-estimator
LA City Planning, Affordable Housing Linkage Fee schedule (April 22, 2026, PDF)
https://planning.lacity.gov/odocument/d3b76bd3-c723-4602-a682-68cdbac71785/AHLF_Fee_Schedule_April_22,_2026.pdf
LAMC Chapter 1A book, Article 13 (procedures), PDF
https://planning.lacity.gov/odocument/35d8aeca-6be9-463b-b6cd-674049f618d0/AA_Chapter1A_Book_v2.pdf
LA City Planning, Senate Bill 9
https://planning.lacity.gov/project-review/senate-bill-9
LA City Planning, SB 9 frequently asked questions (PDF)
https://planning.lacity.gov/odocument/597fb369-6fbd-4148-a057-3f33233405d2/SB9FAQ2.7l.pdf
LA City Planning, SHRA implementation memo (PDF)
https://planning.lacity.gov/odocument/1b081b86-f735-43e8-bba6-c2d73a192db7/SB_684_1123_Memo_Update_ACP.pdf
ZA Memo 143, Revision 1 (PDF)
https://planning.lacity.gov/odocument/6bf1cc9b-0342-4852-ae4c-646d46953d5c/ZA_Memo_143_Revision_1_Chapter1_8.1.25.pdf
LA City Planning, Housing Crisis Act and Resident Protections
https://planning.lacity.gov/project-review/housing-crisis-act
State Allocation Board, 2026 school fee adjustment (January 28, 2026, PDF)
https://www.dgs.ca.gov/-/media/Divisions/OPSC/Resources/CCI-Adjustments/01282026_Index-Adjustment-on-Development_Approved_FINAL.pdf
Government Code 66317 (ADU application deadlines)
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV&sectionNum=66317
Government Code 65852.21 (SB 9 deadline)
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV&sectionNum=65852.21
VanPlex newsletter

Get new guides by email

New VanPlex guides and articles on multiplex rules, building costs and permits, sent to your inbox.

General information, not legal advice. California housing law changes every year, and each city adds its own rules on top of state law. Confirm current requirements with the city or county planning department, and with a California-licensed attorney or architect, before you buy land or file plans.

Planning a multiplex in Los Angeles?

VanPlex builds multiplexes in British Columbia, Canada. For a lot in Los Angeles, our team makes a custom proforma by hand and emails it to you in 24 to 48 hours.

Get a proforma for your address