Austin | Plats, Permits and Fees
Austin Plats, Building Permits, Review Deadlines and Development Fees
An Austin project with new lots needs two approvals: the plat, the recorded map that creates lots, and the building permit. The plat steps are in Chapter 25-4 of the Land Development Code (LDC) and the permit rules in Chapter 25-11. Section 25-1-111 says the fees "shall be established by separate ordinance," and the City publishes them as its FY 2026-27 fee schedules, in effect from October 1, 2026. This page gives the steps, the deadlines and the fees. The Austin overview gives the short version.
Austin plats, permits and fees in six facts
- The director must approve, approve with conditions, or disapprove a preliminary plan or plat not later than the 30th day after it is filed, or it is approved by operation of law. Source: Austin LDC 25-4-32
- A residential infill project includes a resubdivision of up to 1.00 acre of SF-1, SF-2 or SF-3 land that was platted as a residential subdivision and needs no plat vacation. Source: Austin LDC 25-1-21
- The FY 2026-27 schedule lists the Infill Plat at $6,782.57 for Development Services, with a County recordation fee of $1,081.20. Source: City of Austin, Subdivision Plan Review Fees
- Since July 1, 2026, the City's review time for new residential construction and additions is 10 business days. Source: City of Austin, Residential Plan Review
- A building permit expires if work does not begin before the 181st day after it is issued, with one 180-day extension for good cause. Source: Austin LDC 25-11-94
- For lots platted after October 1, 2023, Austin Water's impact fees are $4,800 for water and $2,900 for wastewater per service unit, $7,700 in all. Source: City of Austin, Water Rates and Fees
When a Plat Is Needed
Section 25-1-21 defines "subdivide" in three ways: to divide land into two or more lots or sites for sale or development, to resubdivide an existing lot, or to combine two or more lots into the same number or fewer lots with different boundaries. Splitting an SF-3 lot into two small lots is a resubdivision, also called a replat. Inside the zoning jurisdiction a subdivision must meet all of Title 25.
A house needs a legal lot even when nothing is split. The City's Water Rates and Fees page notes that state law "prohibits connection of utility service to any parcel of land that is not legally platted or excepted from the platting requirements of the municipality." Section 25-4-2 lists the exceptions the director may grant. One covers a parcel that existed in its current configuration before it came under the City's subdivision rules. Inside the full-purpose city limits, another covers a parcel of five acres or less that existed in its current configuration on January 1, 1995, received authorized utility service then, is on an existing street and meets the frontage rules. The City calls this a land status determination, and the water page says its date sets the impact fee schedule for the parcel.
A preliminary plan, a layout of streets and lots made before the final plat, is required first, with one exception. Under Section 25-4-51, a plat may be approved without one if each lot abuts an existing dedicated public street and the director finds that no new or extended street is needed, that the applicant has dedicated any right-of-way needed to widen the street, and that drainage is handled. An approved preliminary plan expires five years after its application is submitted.
The 30-Day Decision and Other Plat Deadlines
Section 25-4-30 names the director, a City staff official, as the authority that reviews preliminary plans and plats. Section 25-4-32 carries the state deadline into the code and says the requirements "are mandated by state law and supersede any contrary provisions of the City Code." The director "shall approve, approve with conditions, or disapprove with reasons an application for preliminary plan or plat not later than the 30th day after the application is filed." If the director misses that date, the application "is approved by operation of law." The same rule is in Local Government Code 212.009.
A condition or a reason for disapproval must be in writing, may not be arbitrary, and must cite the statute or ordinance it rests on. The applicant may then answer. Under Section 25-4-40 the director decides within 15 days after the response, and a response that meets the rules is approved by operation of law if that deadline is missed. The applicant may ask once, in writing, to extend the first review period, under Section 25-1-89.
| Step | Time limit | Section |
|---|---|---|
| Completeness of the application | The applicant has 45 days to provide all required information; the City explains any gap in writing within 10 working days | 25-1-83(E) |
| Life of the application | Expires 180 days after filing unless approved | 25-1-83(B) |
| Decision on the plan or plat | Not later than the 30th day after filing, unless the director approves one written request to extend | 25-4-32, 25-1-89 |
| Decision after the applicant answers the conditions | Not later than 15 days after the response is submitted | 25-4-40 |
| Fiscal security | Approval expires on the 90th day if the City has not certified that the applicant posted fiscal security | 25-4-84(D) |
| Recording | Items and fees for the County Clerk are due within 80 business days of approval; the application expires on the 81st | 25-4-85 |
| Notice after an administrative replat | Mailed by the 15th day after approval to owners of lots in the original subdivision within 200 feet | 25-4-88(C) |
Sources: Austin LDC 25-1-83, 25-1-89, 25-4-32, 25-4-40, 25-4-84, 25-4-85 and 25-4-88, Supplement 174.
Fiscal security is a bond or other guarantee that the street, utility and drainage work the plat needs will be built. Under Section 25-4-38, the subdivider either builds that work or posts the security before the director approves the plat. If the director disapproves a plan or plat, Section 25-4-33 lets the applicant appeal to the Land Use Commission or the Council.
The Infill Plat
HOME Phase 2 lets a lot in SF-1, SF-2 or SF-3 be split into lots as small as 1,800 square feet, and the City added a process for those splits. Section 25-1-21 defines a residential infill project as development of a site not exceeding 1.00 acre that is either five to sixteen dwelling units, or a re-subdivision of property that is zoned SF-1, SF-2 or SF-3, includes only land that was originally platted as a residential subdivision, and does not require a plat vacation. A plat vacation is the cancelling of an old plat.
The City's HOME amendments page lists the Infill Plat and Site Plan Lite Phase 2 as adopted by the Council on March 6, 2025, with applications accepted from June 16, 2025. It tells applicants who qualify to check the box for streamlined drainage review on the re-subdivision application. The drainage rules are on the watersheds page, and the lot sizes are on the lot size page.
Subdivision Fees
The Subdivision Plan Review fee schedule lists each application with several columns, one for each City office. The table gives the Development Services fee and the subtotal the schedule prints, which adds some of the other columns, such as the County recordation fee on a plat row.
| Application | Development Services fee | Subtotal in the schedule |
|---|---|---|
| Infill Plat | $6,782.57 | $7,863.77 |
| Final plat without preliminary plan | $11,106.01 | $12,187.21 |
| Final plat with preliminary plan | $11,239.81 | $12,321.01 |
| Preliminary plan | $14,758.83 | $16,128.95 |
| Subdivision Public Hearing Preparation | $1,370.12 | $1,919.33 |
| Completeness check | $901.67 | $1,001.67 |
| Amended plat, basic (scrivener's error or name change) | $2,463.23 | $3,544.43 |
Source: City of Austin, Subdivision Plan Review Fees, updated and effective October 1, 2026, read October 8, 2026. The schedule notes that its completeness check fee is charged and collected separately.
Other offices add their own columns to the Infill Plat row: $254.44 for Austin Water engineering review, $916.02 for Parks and Recreation, $375.00 for Fire and $295.00 for Austin Energy. The schedule says fees marked this way "may or may not apply" and are considered case by case. The completeness check fee of $1,176.67 is collected separately. A note on the Infill Plat row says that for a resubdivision the Subdivision Public Hearing Preparation fee, the basic notification fee and the newspaper notification fee also apply: $1,370.12, $549.21 and $183.07. Read the schedule row by row for your case, because the notes decide which columns are charged.
Building Permits and Review Times
Section 25-11-32 requires a permit from the building official before work under the building, electrical, mechanical or plumbing codes. For up to four homes on a legal lot outside the 100-year floodplain, Section 25-5-2 removes the site plan step, so the project goes straight to a residential building permit. A demolition needs its own permit under Section 25-11-37, and the applicant must give notice to the homes next door of a date or dates between five and ten days after the notice is given.
The completeness check comes first. Under Section 25-1-82(E), the City accepts a building permit application as complete once the fee is paid and the information is provided, within 45 days after submittal. If it rejects the application as incomplete, it explains why in writing within 10 working days. The City's Residential Plan Review page then lists its review times, which it says it shortened for some project types starting July 1, 2026:
- New construction and additions: 10 business days.
- Update submittals, the revised plans sent after review comments: 7 business days.
- Demolition, minor revisions and S.M.A.R.T. Housing projects: 5 business days each.
The page says an update gets the same review time as the first submittal and that comments must be cleared before approval. State law sets an outer limit. Under Local Government Code 214.904, a city must grant or deny a permit, give written reasons why it cannot, or agree a deadline with the applicant by the 45th day after the application is submitted. If it then misses the later deadline, it "may not collect any permit fees associated with the application" and must refund those it collected.
A permit also expires. Under Section 25-11-94, it expires if work does not begin before the 181st day after issue, or if work begins and is then abandoned or suspended for more than 180 days. The building official may grant a single 180-day extension if the request comes before expiry and shows good cause. The City's Additional Dwelling Units page adds that each inspection performed extends the expiration date by 180 days, and a cancelled inspection does not.
Residential Plan Review and Permit Fees
Austin bills plan review and permits separately. The Residential Building Plan Review and Inspection Permit fee schedule covers one- and two-family dwellings. Two of its lines set the timing: "The review fee is payable at the time of submittal" and "The permit fee is payable at the time of permit issuance for building and trade permits."
| Fee | FY 2026-27 amount |
|---|---|
| Application processing fee | $112.76 |
| New construction plan review, base fee | $986.15 |
| New construction plan review, 1,001 to 2,000 sq ft | $1,183.38 plus $0.1972 per sq ft over 1,000 |
| New construction plan review, 2,001 to 3,000 sq ft | $1,380.61 plus $0.1972 per sq ft over 2,000 |
| Added fee for each dwelling unit over two | $143.75 |
| Added fee for each structure over two | $159.10 |
| Residential plan review resubmittal | $585.77 |
| Building permit, base fee | $318.48 |
| Electrical, mechanical and plumbing permits, base fees | $183.69, $127.68 and $220.47 |
| Demolition permit | $81.07 |
| General contractor registration, new | $82.56 |
Source: City of Austin, Residential Building Plan Review and Inspection Permit Fees, updated and effective October 1, 2026, read October 8, 2026. The schedule also prints a per square foot charge for each trade permit above 1,000 sq ft.
The schedule charges by home and by building. A three-unit project pays the added $143.75 for its third dwelling unit, and three detached homes also pay $159.10 for the third structure. Other review groups add their own fees when the project needs them, such as tree plan review at $566.93 and the detailed floodplain review at $470.00. The schedule also sets refund terms: refunds for permits equal 75 percent of the original permit less the minimum fee, and no refund is given once an inspection has been performed, scheduled or requested.
Water and Wastewater Impact Fees
An impact fee is a charge on new development to pay for the water and sewer capacity it will use. Austin Water calls these Capital Recovery Fees. Under Section 25-9-322 the fee is assessed at final plat approval, and under Section 25-9-325 it is collected when the City issues a building permit. Section 25-9-323 leaves the amount to a separate ordinance, and the City publishes the current amounts on its Water Rates and Fees page. The plat date decides which schedule applies.
| Lot platted | Water fee | Wastewater fee | Combined, per service unit |
|---|---|---|---|
| After October 1, 2023 | $4,800 | $2,900 | $7,700 |
| October 1, 2018 to September 30, 2023 | $4,700 | $2,500 | $7,200 |
| January 1, 2014 to September 30, 2018 | $5,400 | $2,200 | $7,600 |
| Before January 1, 2014 | By zone | By zone | $800 to $3,900 |
Source: City of Austin, Water Rates and Fees, impact fee schedules, read October 8, 2026. For lots platted before 2014 the page lists six zones in each of two date ranges, from $800 to $3,900 combined.
A service unit is set by the water meter. Section 25-9-331 counts a 5/8-inch simple meter as 1 service unit, a 3/4-inch meter as 1.5 and a 1-inch meter as 2.5. So at $7,700 per unit, a 5/8-inch meter on a lot platted after October 1, 2023 carries $7,700 and a 3/4-inch meter $11,550. Under Section 25-9-324 the fee adds up the service units of all meters bought for the development, so a project with a meter for each home pays for each meter. The water page adds that meter and inspection fees may also apply.
Two rules help an owner. Under Section 25-9-326, the owner of a single-family home used as a homestead may pay the fee in installments when paying in full would cause undue financial hardship: at least 10 percent with the connection fees, and the rest in equal yearly payments over not more than five years at 7 percent interest. Under Section 25-9-341, no impact fee is collected for exchanging one existing 5/8-inch meter that serves an existing duplex for two 5/8-inch meters, one for each home.
Parkland Dedication
Article 14 of Chapter 25-1 requires new residential development to provide for park needs. Section 25-1-601 applies it to a subdivision that includes residential units, to a site plan that includes them, and to some building permits. The code defines single-family as "a residential use consisting of detached single-family or two units," and treats every other residential use as multi-family. For single-family development the City may take land, or a fee in lieu of land when less than six acres would be due or the land does not meet the dedication standards, plus a parkland development fee. Section 25-1-606 says the fee in lieu "is established in the annual fee schedule," and Section 25-1-607 says the same of the development fee.
Timing follows the approval. A fee required as a condition of a subdivision is paid before final plat approval. The applicant may defer it to site plan approval, unless the homes will be exempt from a site plan. A multi-family fee is paid before the certificate of occupancy. VanPlex did not find the parkland amounts in the Development Services fee schedules it opened, so this page states none. Ask the Parks and Recreation Department for the current figures before you budget a lot split.
Best For
- ✓ A split of a platted SF-3 lot on an existing street, which can skip the preliminary plan.
- ✓ A builder who files a complete plat application, since the 30-day clock runs from filing.
- ✓ Up to four homes on a legal lot outside the floodplain, which go straight to a building permit.
Usually Fails When
- ✕ The land has never been platted and meets no exception in Section 25-4-2.
- ✕ Fiscal security for the plat is not posted within 90 days of approval.
- ✕ A budget leaves out impact fees for each new meter, or the parkland fee.
What To Verify Before Spending Money
- → The plat date of the lot, which sets the impact fee schedule.
- → Which notes on the Infill Plat row apply to your resubdivision.
- → The current parkland fee in lieu and development fee, from the Parks and Recreation Department.
Where to Go Next
Related on VanPlex: the Austin overview, other 2025 Texas housing laws, and building codes from duplex to fourplex.
Frequently Asked Questions
Do I need to plat my lot before building in Austin?
Who approves a plat in Austin?
What happens if Austin misses the 30-day plat deadline?
How much does it cost to split a lot in Austin?
Do I need a preliminary plan to split a lot in Austin?
How long does a residential building permit review take in Austin?
How much is a building permit for a new home in Austin?
How are water impact fees counted for a new home in Austin?
Can I pay Austin water impact fees in installments?
Does a new home in Austin pay a parkland fee?
Official sources (checked October 2026)
Get new guides by email
New VanPlex guides and articles on multiplex rules, building costs and permits, sent to your inbox.
Planning a multiplex in Austin?
VanPlex builds multiplexes in British Columbia, Canada. For a lot in Austin, our team makes a custom proforma by hand and emails it to you in 24 to 48 hours.
Get a proforma for your address