San Antonio | Three or More Homes
San Antonio Triplexes, Fourplexes, Townhouses and Infill: Three or More Homes on a Lot
This page covers seven routes to three or more homes on one site under San Antonio's Unified Development Code (UDC). The RM-5 and RM-4 districts allow a triplex or fourplex on an ordinary city lot. Section 35-373 sets rules for townhouses and cottage housing. The Infill Development Zone (IDZ) and Section 35-312, San Antonio's version of the state law SB 840, allow more. This page gives the numbers for each route. The San Antonio overview gives the short version.
Three or more homes in San Antonio, in six facts
- An RM-5 lot may hold three dwellings and an RM-4 lot four, when the lot meets the district minimum of 5,000 or 4,000 square feet. Source: San Antonio UDC 35-310.06
- On a lot of one-third of an acre or smaller, the units must be within a single structure with a front entry facing the primary street. Source: San Antonio UDC 35-310.06 and Table 310-1, Note 13
- A three-family or four-family dwelling needs at least 1.5 parking spaces per unit and may have no more than 2 per unit. Source: San Antonio UDC Table 526-3a
- A townhouse lot needs at least 1,200 square feet and 15 feet of width, and a townhouse development may not exceed 40 units per gross acre outside the TOD district. Source: San Antonio UDC 35-373
- IDZ-1 is limited to 18 dwelling units per acre and IDZ-2 to 50, and the minimum parking rules do not apply in IDZ-1. Source: San Antonio UDC 35-343.01
- Property zoned office, commercial, light industrial or mixed use may be built as multifamily housing at up to 65 units per acre without a rezoning. Source: San Antonio UDC 35-312
The Seven Routes
| Route | Where it is allowed | Main number | UDC section |
|---|---|---|---|
| Triplex (three-family dwelling) | RM-5, RM-4 and all MF districts | 3 units on an RM-5 lot of 5,000 sq ft or more | 35-310.06, Table 311-1 |
| Fourplex (four-family dwelling) | RM-4 and all MF districts | 4 units on an RM-4 lot of 4,000 sq ft or more | 35-310.06, Table 311-1 |
| Townhouses | R-6, R-5, R-4, R-3, R-2, R-1, RM and MF districts | Lots of 1,200 sq ft and 15 ft wide, up to 40 units per gross acre | 35-373(b) |
| Cottage housing development | RM-6, RM-5, RM-4 and IDZ | Site of 11,600 sq ft or more, cottages of up to 975 sq ft | 35-373(d) |
| Multi-family (5 or more units) | MF-18 to MF-65 | 18 to 65 units per acre | Table 310-1, Table 311-1 |
| Infill Development Zone | Land rezoned to IDZ-1, IDZ-2 or IDZ-3 | 18 units per acre, 50 units per acre, or a density stated in the ordinance | 35-343.01 |
| Housing on commercial land | O-1, O-1.5, O-2, NC, C-1, C-2, C-3, L and listed mixed-use districts | Up to 65 units per acre, no rezoning | 35-312 |
Source: San Antonio UDC sections named in the last column, Supplement 25 Update 1, read through 35-311, 35-373, 35-343.01 and 35-312.
The first four routes need no public vote when the lot already has the right zoning. IDZ needs a rezoning, a change of zoning district, by City Council. A rezoning from an R district to RM-5, RM-4 or MF is also a Council decision, and the zoning districts page covers the steps and the vote.
Triplexes and Fourplexes in RM-5 and RM-4
Appendix A defines a three-family dwelling (triplex) and a four-family dwelling (quadraplex) the same way: a "detached structure (on a platted single lot) with common walls or common floor/ceiling between the units," for no more than three or four families, "each living as an independent housekeeping unit." A plat is the recorded map that creates lots.
Section 35-310.06 sets the count. The table density of 9 units per acre in RM-5 and 11 in RM-4 may be exceeded when the lot meets the district minimum, and the number of dwellings "is limited to two (2) units for RM-6, three (3) units for RM-5, and four (4) units for RM-4." These limits came from Ordinance No. 2022-11-03-0831, effective January 1, 2023.
| Rule | RM-5 | RM-4 |
|---|---|---|
| Minimum lot | 5,000 sq ft | 4,000 sq ft |
| Most dwellings on the lot | 3 | 4 |
| Street frontage and lot width | 15 feet each | 15 feet each |
| Maximum lot width (detached houses only) | 100 feet | 80 feet |
| Front setback | 10 feet | 10 feet |
| Side setback | 5 feet | 5 feet |
| Rear setback | 10 feet | 10 feet |
| Height | 35 feet, 3 stories | 35 feet, 3 stories |
| Largest single building | 65% of lot area | 65% of lot area |
| Parking, three or four-family | 1.5 to 2 spaces per unit | 1.5 to 2 spaces per unit |
Sources: San Antonio UDC Table 310-1, 35-310.06 and Table 526-3a, Supplement 25 Update 1.
A setback, in the table above, is the distance a building must keep from a lot line. Three design rules apply on a lot of one-third of an acre (14,520 square feet) or smaller:
- One building. Multi-unit construction "shall be within a single structure." Three or four separate small houses on one RM lot do not meet this rule.
- Front entry. Note 13 of Table 310-1 says construction of two to four units "shall have a front entry oriented to the primary street in which the lot is addressed on," and a "front walkway from the door shall also be provided."
- Front yard paving. Table 515-1 limits driveways and other impervious surfaces to 50 percent of the front yard in the RM districts. Impervious means a surface that water cannot pass through, such as concrete.
Table 526-3a sets the parking: a minimum of 1.5 spaces per unit and a maximum of 2 for a three-family or four-family dwelling. A fourplex needs 6 spaces. A triplex comes to 4.5, and Section 35-526(i) says that when fewer than five spaces are required, "a full parking space shall be required to fulfill a fractional space requirement," so the triplex needs 5. Each space is at least 9 feet by 18 feet. A parking area with three or more spaces must include a turnaround so that cars "can enter and exit the parking area without backing onto a public right-of-way."
Permits for Three and Four Units
Appendix A keeps the term multi-family for "five (5) or more families," so the UDC term does not cover a triplex or fourplex. The permit path is a separate question. Section 10-36 of the City Code adopts the "International Residential Code for One-and-Two-family Dwellings," and the City's Information Bulletin 101 lists the homes that use a New Residential Permit as "All single-family, two-family (duplex), and townhomes (not more than three stories above grade plane with separate means of egress)." A building with three or four stacked units is not on that list. The building codes page explains the line between the residential and commercial codes in Texas.
Information Bulletin 225, "Multiple Dwelling Units on One or More Lots," says when a project also needs a Site Work Permit, which is filed on the Commercial Project Application. A separate Site Work Permit is needed when:
- "Three or more dwelling units are being proposed for construction on a single platted lot where one or more homes do not front a public or private street."
- Two or more dwelling units are proposed, each on its own platted lot, where one or more lots front an ingress/egress easement, a recorded right to cross a strip of land.
The bulletin lists other cases: a site over the Edwards Recharge Zone District, shared parking spaces, a single fire line serving several units, and homes that tie into private utilities. It says a townhome development with each unit facing a platted street does not need the separate permit.
One tree rule changes between three and four units. Section 35-523(a)(4) exempts trees on property "on which construction of single-family, two-family or three-family residential dwelling units has been completed." The exemption does not name four-family dwellings, so ask the City arborist how the tree rules apply to a finished fourplex.
The MF Districts
All six MF districts permit two, three and four-family dwellings by right, which means City staff approve them against the written rules with no public vote. Each district adds apartments up to its own density: 18, 25, 33, 40, 50 or 65 units per acre. Section 35-310.07 describes MF-18 and MF-25 as districts that "may be used as a transition between a single-family and higher intensity uses."
Table 310-1 handles MF land differently from RM land. An MF lot needs 50 feet of frontage, the lot edge along the street, and 50 feet of width, and the table lists no minimum lot size. The table sets a maximum front setback of 20 feet and lists no minimum; Note 6 extends the maximum to 90 feet on a lot with 100 feet or more of street frontage. The side setback is 5 feet and the rear is 10 feet. Height is 35 feet in MF-18 and MF-25, 45 feet in MF-33 and 60 feet in MF-40; the table lists no height for MF-50 and MF-65.
Three notes protect houses next door:
- Rear setback of 40 feet. An MF-18 to MF-50 district "adjoining a platted subdivision zoned single-family residential use shall have a minimum rear setback of forty (40) feet," and parking must be at least 5 feet from any fence on the rear line.
- Height within 50 feet. Under Note 11, any part of a multi-family district within 50 linear feet of the property line of "an established single-family residential use" is limited to the maximum height of the single-family district.
- Small MF-33 lots. On an MF-33 lot of one-third of an acre or smaller, the units must be in a single structure, and Note 12 sets the front setback equal to that of an abutting lot with a single-family use.
Parking for multi-family dwellings is 1.5 spaces per unit at the least and 2 at the most. Section 35-310.07 allows up to 10 percent more units per acre in MF-40, MF-50 and MF-65 when the required parking is in a parking garage.
Townhouses
A townhouse is a "single-family dwelling unit constructed in a group of three (3) or more attached units in which each unit extends from foundation to roof." Each one is on its own lot, so it can be sold on its own. Table 311-1 permits townhouses by right from R-6 through the MF districts, which gives R-zoned land a route to three or more attached homes. Section 35-373(b) sets the rules:
- "No front yard or side yard is required."
- No rear setback is required when the lot abuts an alley or driveway at least 24 feet wide that serves the development. Otherwise "a twelve-foot rear setback shall be required."
- "The minimum lot area shall be one thousand two hundred (1,200) square feet," and the minimum lot width "shall be fifteen (15) feet."
- Each lot needs 100 square feet of contiguous open area, which may be lawn, landscaping or walkways and may not be parking or driveway.
- "Except in the "TOD" district, no townhouse development shall exceed a density of more than forty (40) units per gross acre."
- Each townhouse needs an attached garage, a detached garage, or a common parking lot for the development. Parking is not required in an approved IDZ district.
- A townhouse may have three floors, or four in an approved IDZ district or the downtown (D) district.
Townhouses "shall not be subject to the minimum lot size for RM districts in Table 310-1." The plat must carry the words "townhouse subdivision," and Section 35-515(f) requires deed restrictions, private rules recorded with the land, that limit the lots to townhouse use and provide for upkeep of shared areas. Table 526-3a asks for 1 parking space per townhouse. The 20-foot garage setback in Section 35-516(g) "does not apply to townhouses."
Cottage Housing Developments
Section 35-373(d) allows a group of small detached houses on one site, which it calls a cottage housing development (CHD). A cottage is "a single-family detached dwelling which meets the requirements of this section." The density depends on the district.
| Zoning district | Land per unit (sq ft) | Dwelling units per acre |
|---|---|---|
| IDZ | 2,900 | 15 |
| RM-4 | 3,300 | 13 |
| RM-5 | 3,900 | 11 |
| RM-6 | 4,800 | 9 |
Source: San Antonio UDC 35-373(d)(1), Supplement 25 Update 1.
- Site. "The minimum lot area for a CHD shall be eleven thousand six hundred (11,600) square feet."
- Height. Cottages "shall not exceed eighteen (18) feet or one and one-half (1½) stories in height." The ridge of a pitched roof may reach 25 feet.
- Size. The main floor of a cottage may not exceed 800 square feet. Total floor area may not exceed 1.5 times the main floor or 975 square feet, whichever is less.
- Coverage. Buildings may cover no more than 40 percent of the site.
- Yards. The front yard averages 10 feet and is never less than 5. The rear yard is 10 feet and side yards are 5 feet.
- Open space. The section requires "a minimum of four hundred (400) square feet per unit of common open space." At least 50 percent of the cottages must abut it, and every cottage must be within 60 feet walking distance of it.
- Parking. Parking may not be in the front yard and must be screened from direct street view.
An 11,600 square foot RM-4 site at 3,300 square feet per unit holds three cottages. An existing house or duplex on the site may stay.
The Infill Development Zone
Section 35-343.01 covers IDZ zoning requests filed after November 1, 2018. Its purpose is "to encourage and facilitate development on vacant, bypassed lands, or the redevelopment of underutilized buildings or structures, within existing built-up areas." An IDZ may be located in the Community Revitalization Action Group (CRAG) target area, which Appendix A describes as the "thirty-six (36) square mile territory located inside the 1940 San Antonio corporate boundaries." It may also be located in a census tract inside Interstate Loop 410 where two of three conditions are present: at least 10 percent of structures are abandoned, at least 10 percent of platted lots are vacant, or at least 10 percent of lots or structures are subject to tax liens, which are legal claims for unpaid taxes.
- IDZ-1. Limited to "no more than eighteen (18) dwelling units per acre." Height is limited to 2.5 stories and 35 feet. The minimum parking rules do not apply.
- IDZ-2. Limited to "no more than fifty (50) dwelling units per acre." Height is limited to four stories. Minimum parking may be reduced by 50 percent.
- IDZ-3. Any residential density, but "the density must be stated in the application and ordinance." Height is not limited, and minimum parking may be reduced by 50 percent.
A request for IDZ as a base district, the main zone on the land, comes with a list of permitted uses and a zoning site plan, a drawing of what will be built, which the Zoning Commission reviews and City Council approves with the rezoning. Next to a single-family use or zone, a building within 50 feet may not exceed 2.5 stories or 35 feet. In IDZ-1 the front setback must be "within ten (10) percent of the median setback of existing buildings on the block face." No building may come within 5 feet of the rear lot line or a perimeter side lot line.
The district removes several costs. Lots may be platted "without a minimum lot area requirement," and without street frontage if access is shown on the plat. The traffic impact study does not apply. The parks and open space standards do not apply. The stormwater management standards do not apply to "an existing parcel or lot of less than ten thousand (10,000) square feet." The City's FY 2027 Development Fee Schedule lists the storm water participation fee for "Infill Development Zone (IDZ) - all land uses" as "No fee," against $0.20 per square foot of impervious cover for multi-family land.
Housing on Commercial Land: Section 35-312
Section 35-312, added by Ordinance No. 2025-09-04-0580 on September 4, 2025, puts the state law SB 840 into the UDC. It defines multifamily residential for this purpose as "three or more dwelling units within one or more buildings," and mixed-use residential as a site where residential uses are "at least sixty-five (65) percent of the total square footage."
A property "may be developed as mixed use residential or a multifamily residential use if the property is zoned office, commercial, infill development zone, light industrial, business park, or mixed use, without needing to rezone." The section names the districts: O-1, O-1.5 and O-2; NC, C-1, C-2 and C-3; L light industrial; and MXD, IDZ and MPCD where they permit a mix of uses, the transit-oriented districts, BP and the AE arts and entertainment districts. The standards are:
- A density of "no more than sixty-five (65) dwelling units per acre."
- Height equal to the base district limit "or forty-five (45) feet, whichever is greater."
- Setbacks equal to the base district limit "or twenty-five (25) feet, whichever is less."
- Parking of "no more than one (1) required off-street parking space per dwelling unit."
- No floor to area ratio limit, which is a limit on building floor area compared with lot area, and no requirement to include non-residential uses.
Five kinds of land are left out: land zoned for heavy industrial use; land within 1,000 feet of an existing heavy industrial use or site; land within "three thousand (3,000) feet of an airport or military base"; land in the military airport overlay zone (MAOZ), a second set of zoning rules near military runways; and a City-designated clear zone or accident potential zone. The UDC names Lackland Air Force Base, Randolph Air Force Base, Camp Bullis and Martindale Army Air Field in its military overlay sections, so check the distance early.
Subsection (e) covers turning an existing building into homes. A building used for office, commercial, retail or warehouse that "was constructed at least five (5) years before the proposed date of conversion" and will be at least 65 percent residential cannot be required to provide a traffic impact analysis, a study of the traffic the project adds, pay a traffic mitigation fee, or add parking beyond the spaces already on the site. The City keeps its rules on short term rentals, water quality, building codes, stormwater and historic preservation. Table 311-2 carries a matching row for attached apartments and condominiums at a maximum of 65 dwellings per gross acre, marked "See 35-312."
Best For
- ✓ An RM-4 lot of 4,000 sq ft or more with room for 6 parking spaces behind or beside one building.
- ✓ Three or more townhouses on R-zoned land, each on a platted lot of 1,200 sq ft or more.
- ✓ A commercially zoned site more than 3,000 feet from an airport or military base.
Usually Fails When
- ✕ The plan puts three or four separate houses on one RM lot of one-third of an acre or less.
- ✕ A fourplex is planned on RM-5 or RM-6 land, where the limit is three or two units.
- ✕ A Section 35-312 project sits in a military airport overlay zone or near heavy industry.
What To Verify Before Spending Money
- → Whether the building is reviewed under the residential or the commercial building code.
- → Whether Information Bulletin 225 requires a separate Site Work Permit for the layout.
- → For IDZ, whether the lot is inside the CRAG area or a qualifying census tract inside Loop 410.
Where to Go Next
Related on VanPlex: the San Antonio overview, SB 840 in Texas, and building codes from duplex to fourplex.
Frequently Asked Questions
Can I build a triplex in San Antonio?
How much parking does a fourplex need in San Antonio?
Can I build townhouses on an R-4 lot in San Antonio?
How tall can a townhouse be in San Antonio?
What is cottage housing in San Antonio?
What is IDZ zoning in San Antonio?
Can I build apartments on commercial land in San Antonio without rezoning?
How tall can housing be on commercial land under San Antonio UDC 35-312?
Does a San Antonio triplex or fourplex need a site work permit?
How close to a house can an apartment building be in San Antonio?
Official sources (checked October 2026)
Get new guides by email
New VanPlex guides and articles on multiplex rules, building costs and permits, sent to your inbox.
Planning a multiplex in San Antonio?
VanPlex builds multiplexes in British Columbia, Canada. For a lot in San Antonio, our team makes a custom proforma by hand and emails it to you in 24 to 48 hours.
Get a proforma for your address