San Diego ADUs and SB 9: City ADU Rules, the ADU Home Density Bonus and Two-Home Projects
An accessory dwelling unit (ADU) is a second, smaller home on a lot that keeps its main house. A junior ADU (JADU) is a small unit inside the house. SB 9 (2021) lets an owner build two primary homes on a single-family lot. San Diego writes all three into its Municipal Code: ADUs in Section 141.0302 and SB 9 in Chapter 14, Article 3, Division 13. It also runs its own ADU Home Density Bonus, which allows more ADUs than state law. The California ADU law page covers the state rules in full.
San Diego ADUs and SB 9 in six facts
- San Diego allows ADUs from 150 to 1,200 sq ft of gross floor area, with no maximum for an ADU built inside an existing house or accessory structure. Source: SDMC 141.0302(b)(7)
- On a lot with a house, the code allows one ADU inside the house or an existing accessory structure, one attached or detached ADU, and one junior ADU of 150 to 500 sq ft. Source: SDMC 141.0302(b)(1), (c)
- Through the ADU Home Density Bonus, single-family lots may reach 4 ADUs and JADUs (8,000 sq ft or less), 5 (8,001 to 10,000) or 6 (10,001 or more), counting the state-law ADUs. Source: SDMC Table 141-03A
- The city ADU rules amended by Ordinance O-21989 took effect August 22, 2025 outside the Coastal Overlay Zone. Source: San Diego regulatory updates
- An SB 9 project without a lot split may have two homes and two ADUs, never more than four units; with a lot split, no ADU or junior ADU is allowed. Source: SDMC 143.1305(c)
- A new one-story SB 9 home of 16 feet or less may have zero interior side and rear setbacks in San Diego; taller homes need 4 feet next to residential land. Source: SDMC 143.1310(a)(2)
How Many ADUs a Lot Can Have
Section 141.0302 says ADUs and JADUs "are permitted as a limited use decided in accordance with Process One," which Information Bulletin 409 describes as "(ministerial)": a staff check against fixed rules. On a lot with a house, the code allows "One ADU that is within an existing or proposed single dwelling unit or within an existing accessory structure" and "One attached or detached ADU," plus one JADU. The City's regulatory updates page puts it this way: "One JADU, one converted ADU (e.g., a garage conversion), and one detached or attached ADU are permitted on properties with an existing or proposed single-family home."
| ADU type | Code | Size | Number |
|---|---|---|---|
| ADU inside the house or an existing accessory structure | SDMC 141.0302(b)(1)(A) | No maximum; may add 150 sq ft only for entry and exit | 1 |
| Attached or detached ADU, lot with a house | SDMC 141.0302(b)(1)(B) | 150 to 1,200 sq ft | 1 |
| Junior ADU | SDMC 141.0302(c) | 150 to 500 sq ft, inside the house or an attached garage | 1 |
| Detached ADUs, proposed apartment building | SDMC 141.0302(b)(2) | 150 to 1,200 sq ft | Up to 2 |
| ADUs in existing apartment building space | SDMC 141.0302(b)(3)(A) | No maximum | At least 1, up to 25 percent of existing units |
| Detached ADUs, existing apartment building | SDMC 141.0302(b)(3)(B) | 150 to 1,200 sq ft | Up to 8, not more than the existing units |
| Bonus and affordable ADUs (ADU Home Density Bonus) | SDMC 141.0302(d), Table 141-03A | 150 to 1,200 sq ft | Total of 4, 5 or 6 ADUs and JADUs on single-family lots, by lot area |
Sources: SDMC 141.0302(b), (c) and (d) (PDF dated 9-2026); Information Bulletin 400 (January 2026).
ADUs sit outside the zone's home count: "ADUs are not subject to the density limitations of the base zone for the premises," and "A minimum lot size is not required for the construction of an ADU." ADU floor area does count toward the lot's floor area ratio, but Section 141.0302(b)(4) protects one ADU "with a gross floor area of 800 square feet or less," which "shall not be subject to maximum lot coverage, maximum floor area ratio, a front yard setback, and minimum open space requirements of the underlying base zone." Bulletin 400 adds that "Attached ADUs are not permitted on premises with an existing or proposed multiple-dwelling unit structure."
Height, Setbacks and Parking for ADUs
- Height. On lots that allow single but not multiple dwelling units, "detached ADU structures shall not exceed two stories," and every ADU must meet "the overall maximum structure height of the underlying base zone and overlay zone."
- Front and street side. The front setback follows the zone. The street side setback is "4 feet or the minimum street side yard setback of the base zone, whichever is less."
- Interior side and rear, 16 feet tall or less. Outside a High or Very High Fire Hazard Severity Zone, "there is no minimum interior side yard and rear yard setbacks," though the Fire Code Official may require more. Inside one, the setback is 4 feet.
- Interior side and rear, taller than 16 feet. Still none, unless the line "abuts another premises that is residentially zoned or developed with exclusively residential uses," in which case it is "4 feet or the minimum setback of the applicable base zone, whichever is less." In a fire zone, 4 feet.
- Conversions. An ADU made from an existing building, or rebuilt "in the same location and within the same building envelope," keeps the old setbacks.
- Parking. "No on-street parking spaces or off-street parking spaces are required for ADUs," except on a lot both in the Beach Impact Area of the Parking Impact Overlay Zone and outside a transit priority area. A garage torn down or converted for an ADU need not be replaced, with the same Beach Impact Area exception.
A city document and the code differ on fire zones. Section 141.0302(b)(9) requires the 4-foot setback in a "High or Very High Fire Hazard Severity Zone." Information Bulletin 400 says "If the premises is located within a Very High Fire Hazard Severity Zone, the ADU must observe a minimum 4-foot Interior Side Yard and Rear Yard Setbacks." The code text controls, so plan for 4 feet in High zones as well.
Where the City Code Is Stricter Than State Law
A city ADU rule that conflicts with state law cannot be applied. Three provisions in Section 141.0302 have not caught up with the statutes.
- Junior ADU owner occupancy. Section 141.0302(c)(1)(E) says "The record owner of the primary dwelling unit shall reside in the single dwelling unit or JADU." Government Code 66333(b), as amended by AB 1154 from January 1, 2026, says "Owner-occupancy shall not be required if the junior accessory dwelling unit has separate sanitation facilities." Bulletin 400 follows the statute: the owner must live on site "unless the JADU has separate sanitation facilities." The statute controls.
- Junior ADU rentals. Section 141.0302(a)(8) says "JADUs are not subject to rental term limitations." Government Code 66333(g) requires "that a rental of a junior accessory dwelling unit be for a term longer than 30 days," and Bulletin 400 says the same. The statute controls.
- Beach Impact Area parking. The code's exceptions to the one-space rule do not include all six cases in Government Code 66322(a), which bars parking standards "within one-half of one mile walking distance of public transit" and "When a permit application for an accessory dwelling unit is submitted with a permit application to create a new single-family dwelling or a new multifamily dwelling on the same lot." The code defines a transit priority area by reference to Public Resources Code 21099, or as land "within one-half mile of a major transit stop." Where the two differ, the statute controls.
The ADU Home Density Bonus
Section 141.0302(d) allows "additional bonus ADUs and affordable ADUs" beyond the state-law ADUs. An affordable ADU is rented at a capped rent to a lower income household under a recorded agreement; a bonus ADU is a market-rate ADU earned by providing it. The 2025 amendments, in effect since August 22, 2025 outside the Coastal Overlay Zone, narrowed the program.
- Zones. Barred in "RS-1-1, RS-1-2, RS-1-3, RS-1-4, RS-1-8, RS-1-9, RS-1-10, or RS-1-11" unless the lot is in a High or Highest CTCAC Opportunity Area and "identified as Residential in a land use plan." CTCAC is the California Tax Credit Allocation Committee, whose Opportunity Area maps rate neighborhoods from Low Resource to Highest Resource. The City's regulatory updates page writes the last zone as "RS-11."
- Ratio. In a Sustainable Development Area, "one additional bonus ADU shall be permitted for every additional affordable ADU." Elsewhere, "a maximum of one bonus ADU and one affordable ADU." A Sustainable Development Area is land within a set walking distance of a major transit stop: 1.0 mile in Mobility Zones 1 and 3 and 0.75 mile in Mobility Zone 4.
- Cap. On single-family lots, Table 141-03A allows 4 ADUs and JADUs on lots of "8,000 or less," 5 on "8,001 to 10,000" and 6 on "10,001 or greater," counting the state-law units. Bulletin 400 prints the last row as "10,000 or greater"; the code controls.
- Floor area. On single-family lots, the ratio is figured on no more than 8,000 square feet of lot area, and on the part of the lot without environmentally sensitive lands.
- Fire, parking, trees. Every affordable and bonus ADU needs "an automatic fire sprinkler system" and, outside a transit priority area, one parking space. Lots in High and Very High Fire Hazard Severity Zones must front a street "with at least two evacuation routes" and cannot front a cul-de-sac. Two trees are required for every 5,000 square feet of lot area.
- Affordability. Very low and low income ADUs stay affordable for "not less than 10 years," moderate income ADUs for "not less than 15 years," under an agreement with the San Diego Housing Commission. Breaking it costs "a minimum penalty of $10,000 per ADU per month." The regulatory updates page describes the change as a penalty "increased by $10,000 per month"; the code wording controls.
- Accessible ADU. One more ADU is allowed if the project has at least two affordable ADUs and the extra one meets the accessibility rules of Chapter 11A of the California Building Code.
Bonus projects also pay the ADU Home Density Bonus Program Community Enhancement Fee, "as established by San Diego Resolution," based on the floor area of the affordable and bonus ADUs. The permits and fees page covers that fee and the impact fee exemptions for ADUs.
Selling an ADU as a Condominium
Section 141.0302(f) says "New or existing ADUs may be converted into condominiums and shall be sold or otherwise conveyed separately from the primary residence." A condominium is a home owned on its own, with shared ownership of the land. The project must be on "a single parcel or lot that was previously mapped and monumented," every lender must consent ("A lienholder may refuse to give written consent"), and for 30 days from the first listing the owner must offer the ADU "through at least two publicly accessible real estate websites or databases" to buyers who will live in it. The code bars separate sale of ADUs funded by the San Diego Housing Commission and of rent-restricted ADUs while the restriction lasts. The regulatory updates page applies the bar to all "ADUs constructed through the ADU Home Density Bonus Program" during the deed restriction.
SB 9 Two-Home Projects
San Diego calls an SB 9 two-home project a Multi-Dwelling Unit Development (MDUD). Section 143.1310 allows "Up to two dwelling units" on a lot in a single-family zone, "attached to or detached from one another." The rules:
- Setbacks. Front and street side setbacks follow the zone. "One-story dwelling units with a structure height of 16 feet or less may have zero setbacks in the interior side yards and rear yards." Taller or multi-story homes may also have zero, unless the line abuts residential land, "in which case a 4-foot setback shall apply." A converted building needs no setback.
- Size. "up to two dwelling units, each with a maximum gross floor area of 800 square feet, shall be permitted" even where other rules are not met. Otherwise the zone floor area ratio applies.
- Parking. None inside a Sustainable Development Area or transit priority area. Outside, "One off-street parking space per dwelling unit shall be required for the construction of the third and fourth dwelling units," none for the first two, and one per home in the Beach Impact Area unless a car share is within one block.
- Rentals. Homes "shall not be rented for fewer than 31 days."
- Coast. Information Bulletin 409 says "A CDP is required for all MDUD and/or Urban Lot Split applications within the Coastal Overlay Zone." A CDP is a Coastal Development Permit.
Combining with ADUs follows Section 143.1305(c). With no lot split, an owner "may construct two attached or detached Accessory Dwelling Units in addition to the two dwelling units," and "Under no circumstances shall the total number of dwelling units on the lot, inclusive of Accessory Dwelling Units, exceed four." If the lot is split as well, "An Accessory Dwelling Unit or Junior Accessory Dwelling Unit shall not be permitted," and an existing ADU or JADU "shall be removed or converted to one of the multiple dwelling units." The JADU wording was added by Ordinance O-22109, effective July 15, 2026 outside the coastal zone.
Section 143.1303(b) lists where SB 9 cannot be used: farmland, wetlands, Very High Fire Hazard Severity Zones unless the building meets Chapter 7A of the California Building Code, hazardous waste sites, flood areas, the MHPA habitat preserve, and projects that would demolish or alter a home "occupied by a tenant in the last three years" or rent-restricted housing. On historic land the code and state law now differ. Section 143.1303(b)(1)(J) bars "A historical district that is a designated historical resource." AB 1061 narrowed Government Code 65852.21 to "A contributing structure within a historic district" and "A parcel individually listed as a historical resource." Information Bulletin 409 follows the statute, and the statute controls.
Applications use Form DS-3063, the SB 9 eligibility declaration. Both SB 9 and ADU applications carry state deadlines: Government Code 65852.21(h) says an SB 9 application "shall be considered and approved or denied within 60 days," and Government Code 66317 sets the same 60 days for an ADU on a lot with an existing home. The City's bulletin warns that building two MDUD homes and two ADUs first "may, upon a later application for a subdivision, find that the project is ineligible," so it recommends filing the homes and any lot split "concurrently."
Best For
- ✓ A single-family lot of 8,001 sq ft or more in an eligible zone near transit, where bonus ADUs can reach 5 or 6.
- ✓ An owner who wants rental ADUs without living on site, which the city code allows.
- ✓ A lot that stays whole, where two SB 9 homes plus two ADUs give four units.
Usually Fails When
- ✕ The lot is in RS-1-1 to RS-1-4 or RS-1-8 to RS-1-11 outside a High or Highest Resource area and the plan counts bonus ADUs.
- ✕ The plan adds ADUs to a lot that is also split under SB 9.
- ✕ A bonus ADU lot in a High or Very High fire zone fronts a cul-de-sac or has one way in and out.
What To Verify Before Spending Money
- → Transit priority area, Sustainable Development Area and Beach Impact Area status on ZAPP.
- → Your CTCAC opportunity rating if the lot is in RS-1-1 to RS-1-4 or RS-1-8 to RS-1-11.
- → The fire hazard zone, which changes ADU setbacks and bonus ADU access rules.
Where to Go Next
Related on VanPlex: the San Diego overview, California ADU law and SB 9 in California.
Frequently Asked Questions
How big can an ADU be in San Diego?
Do I need to live on the property to build an ADU in San Diego?
What floor area limit applies to a San Diego ADU Home Density Bonus project?
How many bonus ADUs do I get for each affordable ADU in San Diego?
Do San Diego bonus ADUs need fire sprinklers?
What does selling a San Diego ADU as a condominium require?
Where can I build an SB 9 project in San Diego?
Does an SB 9 home in San Diego need parking?
Can SB 9 be used in a San Diego historic district?
Can I rent an SB 9 home or an ADU for short stays in San Diego?
Official sources (checked October 2026)
Get new guides by email
New VanPlex guides and articles on multiplex rules, building costs and permits, sent to your inbox.
Planning a multiplex in San Diego?
VanPlex builds multiplexes in British Columbia, Canada. For a lot in San Diego, our team makes a custom proforma by hand and emails it to you in 24 to 48 hours.
Get a proforma for your address