San Diego | Parking, setbacks and height
San Diego Parking, Setbacks and Height: Transit Priority Areas, Yards and Height Limits
Three numbers decide how big a building can be on a San Diego lot: how far it must stay from the lot lines (the setbacks), how tall it may be, and how much land must go to parking. San Diego has removed parking minimums near major transit and keeps them elsewhere. This page gives the parking ratios from Chapter 14, Article 2, Division 5 of the Municipal Code, and the setbacks and heights from the residential zone tables in Chapter 13. The coastal 30-foot height limit is on the coast and hillsides page.
San Diego parking, setbacks and height in six facts
- A single dwelling unit in San Diego needs 0 parking spaces inside a Transit Priority Area and 2 spaces outside one. Source: SDMC Table 142-05B
- San Diego defines a Transit Priority Area as land within one-half mile of an existing or planned major transit stop. Source: SDMC Chapter 11, Article 3, Division 1
- Apartment buildings outside transit areas need 1.25 spaces for a studio up to 400 sq ft, 1.5 for one bedroom, 2.0 for two and 2.25 for three or more. Source: SDMC Table 142-05C
- RS-1-7, the zone of 5,000 sq ft lots, requires a 15-foot front setback, 4-foot sides, a 5-foot street side and a 13-foot rear setback. Source: SDMC Table 131-04D
- RS-1-1 to RS-1-7 list a maximum height of 24/30 feet, while RS-1-8 to RS-1-14 allow 35 feet. Source: SDMC Table 131-04D
- On lots narrower than 75 feet, the angled building envelope plane in residential zones is set at 45 degrees from vertical. Source: SDMC Table 131-04H
Parking Starts With the Transit Priority Area
The City's definitions say a Transit Priority Area is "the area defined in California Public Resources Code section 21099, as may be amended, or an area within one-half mile of a major transit stop that is existing or planned." A major transit stop is defined as a site with "an existing rail transit station, a ferry terminal served by either a bus or rail transit service, or the intersection of two or more major bus routes with a frequency of service interval of 20 minutes or less during the morning and afternoon peak commute periods," or the state definition.
The rule follows the lot, even in part. Footnote 3 to Table 142-05B says the transit priority area ratio applies "where all or a portion of the premises is located within a transit priority area" and "supersedes any other applicable parking ratio." The City's regulatory updates page describes Housing Action Package 2.0, adopted December 12, 2023, as removing "parking minimums for new residential and commercial developments within Transit Priority Areas (TPAs) (within 1/2 mile of a major transit stop)," to carry out AB 2097. It took effect in the Coastal Zone on March 11, 2026.
Parking for Houses and Apartments
For a house, Table 142-05B requires "0 spaces per dwelling unit" in a Transit Priority Area and "2 spaces per dwelling unit" outside one. Footnote 1 adds that houses "that do not provide a driveway at least 20 feet long" must "provide two additional parking spaces," which may be on the street next to the property. Adding to a house does not raise the requirement as long as the house stays within the zone's height, coverage and floor area limits.
| Apartment home type | Basic | Transit Area | Transit Priority Area | Parking Impact |
|---|---|---|---|---|
| Studio up to 400 sq ft | 1.25 | 1.0 | 0 | 1.5 |
| 1 bedroom or studio over 400 sq ft | 1.5 | 1.25 | 0 | 1.75 |
| 2 bedrooms | 2.0 | 1.75 | 0 | 2.25 |
| 3 to 4 bedrooms | 2.25 | 2.0 | 0 | 2.5 |
Source: SDMC Table 142-05C (PDF dated 9-2026). Car spaces per home. Transit Area means the Transit Area Overlay Zone or Urban Village Overlay Zone; Parking Impact means a beach or campus impact area outside a Transit Priority Area.
Table 142-05C sets apartment parking in four columns. The "Basic" ratio applies unless a reduced or increased ratio does. The "Transit Area" ratio applies in the Transit Area Overlay Zone or the Urban Village Overlay Zone. The "Parking Impact" ratio applies in the beach and campus impact areas of the Parking Impact Overlay Zone, "but does not apply to development where all or a portion of the premises is located within a transit priority area." In a beach impact area, homes with five or more bedrooms need 2.5 spaces.
Inside a Transit Priority Area, Section 142.0528 says "Off-street parking spaces are not required." What it requires instead:
- A passenger drop-off and loading zone along the street, unless a compliant one is within 200 feet of the main accessible entrance.
- An on-street accessible parking space, unless the block already has one for every 25 standard spaces.
- If parking is built, it "shall consist only of unbundled parking," meaning parking rented or sold apart from the homes. Projects of "four or fewer dwelling units," projects with 20 percent of homes for households at 50 percent of median income for 55 years, and homes with attached private garages are exempt from this rule.
- Bicycle and motorcycle spaces under Table 142-05C, and transportation amenities based on the project's Transportation Amenity Score.
ADUs, SB 9 homes and streamlined small lot homes have their own rules. ADUs need no parking except in the Beach Impact Area outside a Transit Priority Area. SB 9 homes need none in a Sustainable Development Area or Transit Priority Area, and elsewhere one space each for the third and fourth homes. That matches the state cap in Government Code 65852.21 of "parking of up to one space per unit." Streamlined Small Lot Subdivision homes need one space each outside a Transit Priority Area, and none if a car share vehicle is within 500 feet.
Setbacks and Height in the RS Zones
| Zone | Front (ft) | Side (ft) | Street side (ft) | Rear (ft) | Height (ft) |
|---|---|---|---|---|---|
| RS-1-1 | 25 | 10 | 10 | 25 | 24/30 |
| RS-1-2 | 25 | 8 | 8 | 25 | 24/30 |
| RS-1-3 | 20 | 7 | 7 | 20 | 24/30 |
| RS-1-4 | 20 | 6 | 6 | 20 | 24/30 |
| RS-1-5 | 20 | 5 | 6 | 20 | 24/30 |
| RS-1-6 | 15 | 5 | 6 | 15 | 24/30 |
| RS-1-7 | 15 | 4 | 5 | 13 | 24/30 |
| RS-1-8 to RS-1-14 | 25 to 15 | 10 to 4 | 20 to 10 | 10 | 35 |
Source: SDMC Table 131-04D and Section 131.0443(a) (PDF dated 9-2026). All are minimums.
Section 131.0443(a) adjusts these numbers. A front setback on a cul-de-sac "may be reduced 5 feet below the requirement," never below 5 feet. Where at least half of the front 50 feet of the lot slopes at 25 percent or more, the street-facing setback "may be reduced to a minimum 6 feet." In RS-1-1 to RS-1-7, lots under 100 feet deep need a rear setback of "at least 10 percent of the lot depth, but not less than 5 feet," and half the width of an abutting alley, up to 10 feet, can count toward the rear yard. In RS-1-8 to RS-1-14 the rear setback "may be reduced to 4 feet" on alley lots. Side setbacks on lots over 50 feet wide can be shifted from one side to the other, but not below 4 feet.
The code has a small error here. Section 131.0443(a)(2)(A) says the rear setback is "at least the dimension shown in Table 141-04D," a table that does not exist in the residential zone division; the RS table is Table 131-04D.
Height in RS-1-1 to RS-1-7 is listed as "24/30," with footnote 4 pointing to Section 131.0444. That section says height "shall not exceed the height of the angled building envelope plane, which connects the maximum structure height adjacent to the setback and the overall maximum structure height." An angled building envelope plane is an imaginary sloped surface that a building may not cross, so upper floors step back from the lot line. Table 131-04H sets the angle by lot width: 45 degrees under 75 feet, 30 degrees from 75 to 150 feet, and none over 150. Diagram 131-04L marks 24 feet for RS and RX zones and 27 feet for RT. The plane is required next to side yards, and next to front and street side yards "in cases where the maximum structure height exceeds 27 feet." RS-1-2 to RS-1-7 also have "Max third story dimensions" rules.
Setbacks and Height in RX, RT and RM Zones
| Zones | Front (ft) | Side (ft) | Rear (ft) | Height (ft) |
|---|---|---|---|---|
| RX-1-1, RX-1-2 | 15 | 3 (detached) / 0 (attached) | 10 | 30 |
| RT-1-1 to RT-1-5 | 5 minimum, 15 maximum (10 in RT-1-5) | 0 | 3 | 21 to 35 by stories and floor type |
| RM-1-1 to RM-1-3 | 15 minimum, 20 standard | 5 minimum, 8 standard | 15 | 30 |
| RM-2-4 to RM-2-6 | 15 minimum, 20 standard | 5 | 15 | 40 |
| RM-3-7 to RM-3-9 | 10 minimum, 20 standard | 5 | 5 | 40 / 50 / 60 |
Source: SDMC Tables 131-04E, 131-04F and 131-04G, Sections 131.0443 and 131.0444 (PDF dated 9-2026).
- RX. Detached homes need side setbacks of "at least 3 feet or 10 percent of the lot width, whichever is greater," up to 5 feet, and one side may be zero next to other RX land if 10 feet separate the buildings on one side. RX projects of more than four homes must vary their front setbacks between 10, 15 and 20 feet.
- RT. "Side yards are not permitted except for lightwells and court yards" of at least 6 by 10 feet, and each home has its own side wall: "Common wall construction between two dwelling units is not permitted." A 3-foot side setback applies next to land outside an RT zone. Height is 21 feet (slab floor) or 25 feet (raised floor) for one or two stories and 31 or 35 feet for three, plus 5 feet for a roof of at least 3:12 pitch. Lot coverage runs from 60 to 75 percent.
- RM-1. "Up to 50 percent of the width of the building envelope may observe the minimum 15-foot front setback," the rest the standard 20 feet. One side may use the 5-foot minimum for half its length, the rest "8 feet or 10 percent of the lot width, whichever is greater." Above 19 feet at the minimum front setback, a 45-degree plane slopes back to the 30-foot limit.
- RM-2. Side setbacks are "5 feet or 10 percent of the premises width, whichever is greater," 4 feet on lots 40 to 50 feet wide. At the sides, a 60-degree plane above 30 feet slopes to the 40-foot limit.
- RM-4 and RM-5. Table 131-04G gives no base height. In the Peninsula Community Plan area inside the Coastal Height Limit Overlay Zone, footnote 37 sets 30 feet for RM-2 through RM-5 zones.
Setbacks for ADUs and SB 9 Homes
ADUs and SB 9 homes get smaller side and rear setbacks than the zone. An ADU of 16 feet or less needs no interior side or rear setback outside a High or Very High Fire Hazard Severity Zone, and 4 feet inside one. A taller ADU next to residential land needs "4 feet or the minimum setback of the applicable base zone, whichever is less." An SB 9 home of one story and 16 feet or less "may have zero setbacks in the interior side yards and rear yards"; taller homes next to residential land need 4 feet. Both follow the zone front setback, except that one ADU of 800 square feet or less may be built in it. The ADUs and SB 9 page gives the details.
Best For
- ✓ A lot any part of which is inside a Transit Priority Area, where houses and apartments need no parking.
- ✓ An RS lot over 50 feet wide, where side setbacks can be shifted to one side down to 4 feet.
- ✓ An RM-2 lot where a 40-foot height and 5-foot sides fit a small apartment building.
Usually Fails When
- ✕ An RS house design ignores the 24-foot start of the angled plane at the side setbacks.
- ✕ A house outside a Transit Priority Area has a driveway under 20 feet and no room for two more spaces.
- ✕ An apartment project in a Transit Priority Area bundles its parking with the homes and is not exempt.
What To Verify Before Spending Money
- → Transit Priority Area, Transit Area Overlay and Parking Impact Overlay maps on ZAPP.
- → Lot width, which sets the 45 or 30 degree angled plane.
- → Whether an overlay zone or community plan lowers the height limit for your lot.
Where to Go Next
Related on VanPlex: the San Diego overview, SB 9 in California and California ADU law.
Frequently Asked Questions
Do I need parking for a new house in a San Diego Transit Priority Area?
What does 24/30 mean for height in San Diego RS zones?
How far must a house be from the side lot line in San Diego?
Are apartments near transit in San Diego required to have parking?
How tall can a townhouse be in a San Diego RT zone?
What are the RM-1-1 front setbacks in San Diego?
Does San Diego require bicycle parking for apartments?
What is the Beach Impact Area parking rule in San Diego?
How much of a San Diego RS lot can be covered by buildings?
What transportation amenities does San Diego require near transit?
Official sources (checked October 2026)
Get new guides by email
New VanPlex guides and articles on multiplex rules, building costs and permits, sent to your inbox.
Planning a multiplex in San Diego?
VanPlex builds multiplexes in British Columbia, Canada. For a lot in San Diego, our team makes a custom proforma by hand and emails it to you in 24 to 48 hours.
Get a proforma for your address