Two kinds of land in San Diego carry rules that change what the zone allows: land near the ocean, and land on steep slopes. Near the coast, a 30-foot height limit approved by voters, a separate coastal permit, and a delay before new code changes take effect all apply. On steep slopes, the City's Environmentally Sensitive Lands rules limit how much of the lot can be built on. This page explains both, with the fire zone rules that shape ADU, SB 9 and small lot projects.
San Diego coast and hillsides in six facts
- No building or addition may exceed 30 feet in San Diego's Coastal Zone, which runs from the ocean inland to Interstate 5 as it was located on January 1, 1971, with four mapped exceptions. Source: SDMC 132.0505
- The 30-foot limit came from Proposition D, effective December 7, 1972, and can be changed only by a majority vote of San Diego voters. Source: SDMC 132.0505(i) and editors note
- A Coastal Development Permit is required for all coastal development in the Coastal Overlay Zone unless an exemption in Section 126.0704 applies. Source: SDMC 126.0702
- Many San Diego code amendments, including the 2025 ADU changes and the 2026 code update, do not apply in the Coastal Overlay Zone until the Coastal Commission certifies them. Source: SDMC editors notes; Information Bulletin 400
- San Diego defines steep hillsides as natural slopes of 25 percent or more with at least 50 feet of rise, or 200 percent or more with at least 10 feet. Source: SDMC Chapter 11, Article 3, Division 1
- Outside the habitat preserve, building on steep hillsides is allowed only as needed to reach a development area of 25 percent of the premises. Source: SDMC 143.0142(a)(2)
The 30-Foot Coastal Height Limit
Section 132.0505(a) of the Municipal Code reads: "Notwithstanding any section to the contrary, no building or addition to a building shall be constructed with a height in excess of thirty feet within the Coastal Zone of the City of San Diego." For this section, the Coastal Zone means the land "from the northern City limits, south to the border of the Republic of Mexico, extending seaward to the outer limits of City jurisdiction and extending inland to the location of Interstate 5 on January 1, 1971."
The editors note says the section "is a codification of Proposition D, which was adopted by the people of the City of San Diego and became effective on December 7, 1972," later amended by Proposition L (1988), Proposition D (1998), Proposition C (2000) and Measure E (2020). Subsection (i) says it may be amended "only by a majority vote of the voters of the City of San Diego," and subsection (d) says "there shall be no exception" beyond those listed.
Four areas are excepted: land bounded by National City, San Diego Bay and Laurel Street; the Sea World area on Mission Bay, where nothing may exceed half the height of the Sky Tower; a site near the border at Camino de la Plaza, with its own limits of 150, 80 and 50 feet by acreage; and part of the Midway-Pacific Highway Community Plan area, added by Measure E. Height is measured under "the Uniform Building Code of 1970."
The limit shapes the City's housing programs. Complete Communities projects in the Coastal Overlay Zone and the Coastal Height Limit Overlay Zone "shall be limited to a maximum floor area ratio of 2.5, and to a maximum height of 30 feet," outside Downtown, and the program's height waiver does not reach the coastal height overlay. In the Peninsula Community Plan area, footnote 37 to the RM zone table sets a 30-foot base height inside the overlay. The three or more homes page covers SB 79, whose San Diego bulletin keeps the coastal permit requirement in place.
The Coastal Overlay Zone and Coastal Permits
The Coastal Overlay Zone is a separate, larger map layer. Section 132.0401 says its purpose "is to protect and enhance the quality of public access and coastal resources," and Section 132.0402 ties it to Maps C-730.1, C-908 and C-1028. Inside it, Section 126.0702 requires "A Coastal Development Permit issued by the City" for "all coastal development," unless exempt. Where the site lies in the Coastal Commission's own permit area or the Deferred Certification Area, the permit comes from the Coastal Commission instead.
| Rule | Where | Effect |
|---|---|---|
| Coastal Height Limit (Proposition D) | Coastal Zone west of I-5 (1971 location), with four exceptions | 30 feet for any building or addition |
| Coastal Development Permit | Coastal Overlay Zone | Required unless exempt; Process Two (non-appealable area) or Process Three (appealable area) |
| ADU and JADU permits | Non-appealable area | Coastal Development Permit issued as a Process One building permit |
| SB 9 homes and lot splits | Coastal Overlay Zone | Coastal Development Permit required; no public hearing under state law |
| Complete Communities | Coastal Overlay Zone and Coastal Height Limit Overlay Zone, outside Downtown | Floor area ratio 2.5, height 30 feet |
| Inclusionary housing | Coastal Overlay Zone | Applies at 5 homes, against 10 elsewhere |
Sources: SDMC 132.0505; SDMC 126.0702 to 126.0707; IB 409; SDMC 143.1010(a); SDMC 142.1302.
Section 126.0707 sets the decision process. In the non-appealable area, a City decision on a coastal permit is made in Process Two and may be appealed to the Planning Commission. In the appealable area, it is Process Three, "except a decision on an Accessory Dwelling Unit," and "the entire consolidated decision is appealable to the Coastal Commission." For an ADU or junior ADU in the non-appealable area, "The Coastal Development Permit shall be issued as a Building Permit in accordance with Process One." Any subdivision in the coastal zone, lot splits included, "requires a Coastal Development Permit."
Section 126.0704 exempts "Improvements to existing structures," with exceptions: work on a beach, in a wetland or "within 50 feet of a coastal bluff edge"; "The demolition or removal of 50 percent or more of the exterior walls"; a change that needs more parking; and, between the sea and the first public road or within 300 feet of a beach, "an increase of 10 percent or more of interior floor area." ADUs and JADUs "that are not completely contained in the existing primary structure" are "ineligible for an exemption."
For SB 9, Information Bulletin 409 says "A CDP is required for all MDUD and/or Urban Lot Split applications within the Coastal Overlay Zone." The state statute limits that step: under Government Code 65852.21(k), "the local agency shall not be required to hold public hearings for coastal development permit applications" for an SB 9 project. Bulletin 409 cites the coastal procedures as "SDMC Section 127.0704 in Chapter 12, Article 6, Division 7"; the exemption section in that division is 126.0704.
Near the water, Section 132.0403 can require a view corridor "of not less than the side yard setbacks or more than 10 feet in width" between the shoreline and the first public road. Section 132.0404 covers homes in "an area of future sea level rise (within a 75-year horizon)": "Hard shoreline armoring shall not be constructed to protect dwelling units," and the owner signs an acknowledgment that the home "may be required to be removed or relocated" if it becomes unsafe.
New Rules Wait for the Coastal Commission
San Diego's coastal rules are part of its Local Coastal Program, a plan certified by the California Coastal Commission. When the City changes a rule that is part of that program, the change does not apply in the Coastal Overlay Zone until the Commission certifies it. The code marks each such change with an editors note: "Amendments as adopted by O-22109 N.S. will not apply within the Coastal Overlay Zone until the California Coastal Commission certifies it as a Local Coastal Program Amendment."
- ADUs. Information Bulletin 400 (January 2026) says rules from Ordinances "O-21618 , O-21758 , O-21836 , and O-21989" take effect in the coastal zone only after certification. That includes the accessible ADU incentive, the rule limiting junior ADUs to the house or an attached garage, and the 2025 ADU Home Density Bonus changes. The Housing Action Package 1.0 ADU rules, Ordinance O-21439, were certified on September 12, 2024.
- 2026 code update. Ordinance O-22109, effective July 15, 2026, carries the note on the Streamlined Small Lot Subdivisions, the junior ADU rule for SB 9 lot splits, the use table and the Dwelling Unit Protection changes.
- Earlier changes. Housing Action Package 2.0, including the AB 2097 parking change, took effect in the Coastal Zone on March 11, 2026, according to the City's regulatory updates page.
In practice, a lot in the coastal zone may be judged under an older version of a section than a lot inland. The City publishes "strikeout" versions of each ordinance, linked from the code's editors notes, that show the earlier text. State laws such as SB 9 and ADU law still apply in the coastal zone, through a coastal permit.
Steep Hillsides
The City's definition: "Steep hillsides means all lands that have a slope with a natural gradient of 25 percent (4 feet of horizontal distance for every 1 foot of vertical distance) or greater and a minimum elevation differential of 50 feet, or a natural gradient of 200 percent (1 foot of horizontal distance for every 2 feet of vertical distance) or greater and a minimum elevation differential of 10 feet." Steep hillsides are one of five kinds of environmentally sensitive lands, with sensitive biological resources, coastal beaches, sensitive coastal bluffs and flood hazard areas.
Section 143.0110 says that where "any portion of the premises contains" them, the rules "apply to the entire premises." A project that does not encroach into the sensitive land and meets the exemption rules may avoid the permit. One that does needs the permit in Table 143-01A:
| Project on steep hillsides | Permit | Decision process |
|---|---|---|
| Single dwelling units on lots of 15,000 sq ft or less | Neighborhood Development Permit | Process Two |
| Single dwelling units on lots totaling more than 15,000 sq ft | Site Development Permit | Process Three |
| Multiple dwelling unit and non-residential development | Site Development Permit | Process Three |
| Any subdivision of a premises | Site Development Permit | Process Four |
| Deviations from the steep hillside rules | Site Development Permit | Process Four |
| Lot line adjustments | Neighborhood Development Permit | Process Two |
Source: SDMC Table 143-01A (PDF dated 7-2026), steep hillsides column.
Section 143.0142 limits the development area, the share of the premises that development may use. Outside the MHPA (the Multi-Habitat Planning Area, the City's habitat preserve), "Steep hillsides shall be preserved in their natural state, except that development is permitted in steep hillsides if necessary to achieve a maximum development area of 25 percent of the premises." Outside the coastal zone, "up to an additional 15 percent development area is permitted" for major public facilities, or where the flat area is split or has no street access, as long as the total "does not exceed 40 percent of the premises."
The coastal zone is stricter. On steep hillsides with sensitive biology or mapped as Viewshed or Geologic Hazard, building must "avoid encroachment into such steep hillsides to the maximum extent possible," with 25 percent allowed where less than 91 percent of the lot is such land, and 20 percent where it is 91 percent or more, plus 5 percent if needed "to allow an economically viable use." For a coastal subdivision or lot split, "no encroachment into steep hillsides containing sensitive biological resources, or mapped as Viewshed or Geologic Hazard on Map C-720 shall be permitted."
Slopes also shrink what the zone allows. In RS-1-2 to RS-1-7, where more than half of a lot is steep hillside, floor area is figured on the flat area plus 25 percent of the rest, and lot coverage is capped at 50 percent. For the ADU Home Density Bonus, floor area and the number of ADUs are figured on the lot area "that does not contain environmentally sensitive lands." Streamlined Small Lot Subdivisions cannot be used on a lot with environmentally sensitive lands, and SB 9 is barred on such lands "conserved by dedication in fee title, covenant of easement, or conservation easement."
The code has two cross-reference slips in Section 143.0142. Subsection (a)(4)(E) asks for a brush management setback "consistent with Section 142.0142," and (g)(1) refers to "Section 142.0142(a)(4)"; the steep hillside section is 143.0142.
Fire Hazard Zones
Fire zones mapped by the state change four San Diego programs. SB 9 is barred in "The Very High Fire Hazard Severity Zone, unless the development complies with Chapter 7A of the California Building Code." Streamlined Small Lot Subdivisions are barred outright in Very High Fire Hazard Severity Zones. ADUs in a "High or Very High Fire Hazard Severity Zone" need 4-foot side and rear setbacks, and bonus ADU lots there must front a street "with at least two evacuation routes." Ordinance O-22099 delays SB 79 in "a Very High Fire Severity Zone" until the City's alternative plan is adopted or one year after its next Housing Element, whichever comes first.
Best For
- ✓ An inland lot east of the 1971 line of Interstate 5, where the 30-foot Proposition D limit does not apply.
- ✓ A coastal lot in the non-appealable area, where an ADU coastal permit is a Process One building permit.
- ✓ A sloped lot where the flat area already covers 25 percent of the premises or more.
Usually Fails When
- ✕ A coastal plan assumes a 2025 or 2026 code change that the Coastal Commission has not certified.
- ✕ A design needs more than 30 feet in the Coastal Zone outside the four mapped exceptions.
- ✕ A coastal lot split would encroach into steep hillsides mapped as Viewshed or Geologic Hazard.
What To Verify Before Spending Money
- → Coastal Overlay Zone, appealable area and Coastal Height Limit Overlay Zone status on ZAPP.
- → A slope survey showing any land of 25 percent gradient and 50 feet of rise.
- → The state fire hazard severity zone for the lot.
Where to Go Next
Related on VanPlex: the San Diego overview, SB 79 in California and SB 9 in California.
Frequently Asked Questions
Can I build above 30 feet near the coast in San Diego?
Which San Diego areas are outside the 30-foot coastal height limit?
When is a Coastal Development Permit not needed in San Diego?
How is an ADU permitted in the San Diego coastal zone?
Do the 2025 San Diego ADU rules apply in the coastal zone?
What counts as a steep hillside in San Diego?
How much of a steep San Diego lot can I build on?
What permit do I need to build a house on a steep San Diego lot?
Can I use SB 9 in a San Diego Very High Fire Hazard Severity Zone?
What does sea level rise change for building near the San Diego coast?
Official sources (checked October 2026)
Get new guides by email
New VanPlex guides and articles on multiplex rules, building costs and permits, sent to your inbox.
Planning a multiplex in San Diego?
VanPlex builds multiplexes in British Columbia, Canada. For a lot in San Diego, our team makes a custom proforma by hand and emails it to you in 24 to 48 hours.
Get a proforma for your address