Oakland | ADUs and SB 9
Oakland ADUs and SB 9: ADU Categories, Sizes, the S-9 Fire Zone and Two-Unit Projects
An accessory dwelling unit (ADU) is a second, smaller home on a lot with a main home. It has its own kitchen and bathroom and may be inside the main building, attached to it, or detached. A junior ADU (JADU) is a small unit inside a house. Oakland's ADU rules are in Section 17.103.080 of the Planning Code and in Chapter 17.88 for the fire zone. SB 9 is a state law that allows two main homes on a lot in a single-family zone. This page covers both, as read in Supplement 59 of the code and in Ordinance No. 13894 of July 21, 2026.
Oakland ADUs and SB 9 in six facts
- An Oakland house lot may have one Category One ADU, one Category Two ADU and one junior ADU, "in any order, totaling up to three (3) units." Source: Planning Code, Table 17.103.01
- A detached Category Two ADU may be 850 sq ft for a studio or one bedroom and 1,000 sq ft for two bedrooms or more; a junior ADU may be 500 sq ft. Source: Planning Code, Table 17.103.01
- A lot with an existing two- to four-unit or apartment building may add up to 8 detached ADUs, but no more than the number of existing units; a proposed building may add 2. Source: Planning Code, Table 17.103.02
- In the S-9 Fire Safety Protection Combining Zone, new detached and attached ADUs are prohibited, and a lot is limited to one interior conversion ADU or one junior ADU, with exceptions. Source: Planning Code 17.88.050, 17.103.080
- On July 21, 2026 the City Council adopted Ordinance No. 13894, which kept the S-9 ADU rules and adopted findings disagreeing with two of HCD's December 10, 2025 findings. Source: Ordinance No. 13894 text
- Oakland's code has no SB 9 chapter, so Government Code 65852.21 applies directly: two units of at least 800 sq ft each, 4-foot side and rear setbacks, and a decision within 60 days. Source: Government Code 65852.21
Oakland's ADU Categories
Oakland names its ADU types by category, defined in Section 17.09.040. The categories differ for a house lot and for a lot with a two- to four-unit or apartment building.
- Junior ADU. A unit "contained entirely within the building envelope of an existing or proposed One-Family Residential Facility." It "must contain an efficiency kitchen," and "Owner occupancy is required in either the JADU or the primary Residential Facility," with a recorded deed restriction.
- One-Family Category One ADU. "a conversion of space within an existing One-Family Residential Facility or an associated legally existing accessory structure," or a rebuilt accessory structure.
- One-Family Category Two ADU. "a newly constructed attached or detached Accessory Dwelling Unit on a lot with an existing or proposed One-Family Dwelling."
- Multifamily Category One ADU. "a conversion of a legally existing, non-habitable space, such as storage rooms, boiler rooms, passageways, attics, basements, or garages" inside a two- to four-unit or apartment building.
- Multifamily Category Two ADU. "a newly constructed detached Accessory Dwelling Unit, or a conversion of a legally existing detached accessory structure."
- Multifamily Category Three ADU. "a newly constructed ADU that is interior or attached to a primary structure," limited to one per lot.
Every category must meet the rules in Section 17.103.080.A. Approval is ministerial, meaning staff check the plans against written rules: "An application for an Accessory Dwelling Unit (ADU) shall be granted ministerial approval when it complies with all applicable zoning regulations." Rentals must be "for terms of longer than thirty (30) consecutive days." Each ADU and JADU needs "a separate exterior entrance that is independent from the primary Residential Facility" and its own kitchen. "If a covered or uncovered parking space is removed to construct an Accessory Dwelling Unit, no replacement parking is required." An ADU "shall not be sold separately from the primary Residential Facility" unless state law allows it.
ADUs With a House
| Rule | Junior ADU | Category One | Category Two |
|---|---|---|---|
| How many | 1 per lot | 1 per lot | 1 per lot |
| Maximum size | 500 sq ft | Existing space plus 150 sq ft for entry and exit | Detached: 850 sq ft (studio or 1 bedroom), 1,000 sq ft (2 bedrooms or more). Attached: those sizes or 50% of the house, up to 1,200 sq ft, whichever is greater |
| Height | N/A | Set by the zone | 20 ft, or the zone height if the ADU meets zone setbacks; never less than 16 ft |
| Side and rear setbacks | N/A | N/A | 4 ft or the zone setback, whichever is less; never under 3 ft |
| Parking | None | None in the five listed cases, otherwise 1 space | None in the five listed cases, otherwise 1 space |
| Owner on site | Owner lives in the JADU or the house | Not required | Not required |
Source: Oakland Planning Code Table 17.103.01, Property Development Standards applying to One-Family ADUs, Supplement 59.
Note 1 of the table says "A homeowner may create one Category One ADU, one Category Two ADU, and one JADU, in any order, totaling up to three (3) units." With the house, that is four homes on one lot. Both converted ADUs and junior ADUs "are allowed even if the existing facility to be converted or rebuilt does not meet the underlying zone's current development standards, such as height limits, floor area ratios, lot coverage or setbacks."
Oakland protects one new ADU from other zone limits. The front setback, lot coverage and floor area rules give way "when lot conditions preclude creating one ADU of no more than 850 sf. and no more than 18 feet in height anywhere else on the lot," and the table permits "One ADU of no more than 850 sf. that is no more than 18 feet in height with at least 4-foot side and rear yard setbacks" regardless of coverage and floor area. State law sets the floor for this guarantee at 800 square feet with four-foot setbacks, in Government Code 66321(b)(3), so Oakland's 850 square feet gives more.
Parking for a Category One or Two ADU is "None required" in five cases: "within ½-mile walking distance of a public transit stop"; in an Area of Primary or Secondary Importance under the Historic Preservation Element; "in areas where parking permits are required but not offered to occupants of ADUs"; "where there is a carshare vehicle within one block of the ADU"; or "when the ADU is part of the proposed or existing primary residence or an accessory structure." Otherwise the rule is "One space per ADU, which can be tandem," meaning one car parked behind another.
ADUs With a Duplex, Fourplex or Apartment Building
| Type | How many | Size and height |
|---|---|---|
| Category 1: conversion of non-living space inside an existing building | 1, or up to 25% of existing units, whichever is greater | Limited by the existing building |
| Category 2: detached ADU | Existing building: up to 8 per lot, no more than the existing units. Proposed building: up to 2 | No size cap in the table; height 18 ft unless zone setbacks are met, plus 2 ft to match roof pitch |
| Category 3: new attached or interior ADU | 1 per lot | 850 sq ft (studio or 1 bedroom), 1,000 sq ft (2 bedrooms or more) |
Source: Oakland Planning Code Table 17.103.02, Property Development Standards applying to Two- to Four-Family and Multifamily ADUs, and its notes.
Note 1 sets the cap for detached ADUs: "On a lot with an existing multifamily dwelling, the total number of ADUs is not more than eight (8), but ADUs must not outnumber the number of units in the main building." Note 2 adds that "All calculations that result in a fractional number shall be rounded up to the nearest whole number" and that "A lot may contain both Category One and Category Two ADUs." A worked example by VanPlex: an existing fourplex with a basement may add 4 detached ADUs and 1 basement conversion, for 9 homes on the lot. The same lot with a fourplex still in plans may add 2 detached ADUs. Owner occupancy is "Not required" for any of these.
This matches the state rule in Government Code 66323(a)(4): "On a lot with an existing multifamily dwelling, not more than eight detached accessory dwelling units. However, the number of accessory dwelling units allowable pursuant to this clause shall not exceed the number of existing units on the lot." The City's May 26, 2025 report explains that state law SB 1211 "expands the number of detached ADUs from two to eight for lots with existing multifamily dwellings," which Oakland adopted in Ordinance No. 13856 that July.
ADUs in the S-9 Fire Zone
The S-9 Fire Safety Protection Combining Zone covers hill lots in or next to Very High Fire Hazard Severity Zones that are reached by narrow streets or long dead-end streets. Section 17.103.080.A.7 says ADU development there "is restricted with certain exceptions specified in Chapter 17.88 to one interior conversion Category One ADU within the existing envelope of a primary structure or one Junior Accessory Dwelling Unit." Section 17.88.050 prohibits Category One ADUs "that are conversions of space outside the envelope of an existing Residential Facility," all Category Two ADUs, and Category Three ADUs.
Section 17.88.050.B allows one other ADU "in lieu of a Category One interior ADU" in two cases: when "At least one additional off-street parking space is created on the lot for the ADU," with any lost spaces replaced, or when an application for a Reasonable Accommodation is approved "due to a disability of an ADU occupant or a need to accommodate a live-in caregiver." Note 6 of Table 17.103.02 adds: "in the S-9 Zone, maximum ADU height is capped at sixteen (16) feet."
State law and Oakland disagree on this zone. Government Code 66314(a) lets a city designate where ADUs may go, and says "The designation of areas may be based on the adequacy of water and sewer services and the impact of accessory dwelling units on traffic flow and public safety." But Government Code 66323(a) begins "Notwithstanding Sections 66314 to 66322, inclusive, a local agency shall ministerially approve" a converted ADU, a junior ADU and "One detached, new construction, accessory dwelling unit" in a residential zone. HCD sent the City written findings on December 10, 2025. In Ordinance No. 13894, adopted July 21, 2026, the City Council found "that the City's ADU Ordinance complies with State law, including with respect to Findings #2 and #5," the S-9 finding and a finding on front yard placement, and relied on findings first adopted in Ordinance No. 13677 and expanded in Ordinance No. 13800.
Government Code 66326(b) gives a city two answers to HCD findings: "Amend the ordinance to comply with this article," or "Adopt the ordinance without changes" with findings that "explain the reasons the local agency believes that the ordinance complies with this article despite the findings of the department." Oakland chose the second answer for the S-9 rules. Under Government Code 66316, an ordinance that fails to meet the state article is "null and void," and the state standards then apply. The statute controls over a stricter local rule; whether Oakland's S-9 rule is such a conflict is the open question between the City and HCD. The hills, fire zone and creeks page shows how a lot gets into the S-9 zone.
Historic Properties, Amnesty and Fees
For a property on the California Register of Historical Resources, ADUs at the front or side that can be seen from the street "shall incorporate the same roof pitch, visually matching exterior wall material, and predominant door and window trim, sill, recess, and style as the primary dwelling structure," and new ADUs go "First, behind the main structure," "Next, to the side of the main structure," and "Last, in front of the main building." These two rules do "not apply to ADUs built pursuant to California Government Code § 66323." In Ordinance No. 13894 the Council found that this order "does not prohibit front yard ADUs if no other compliant location is available."
Section 17.103.080.A.14 offers amnesty for ADUs built without permits. An owner may request "amnesty from any violation of a zoning standard under the Planning Code if the Unpermitted Accessory Dwelling Unit was established and occupied prior to January 1, 2021," and a delay in Building Code enforcement "for a period of no more than five (5) years" where the fix is "not necessary to protect the public health and safety." Amnesty "shall not be available" in the S-9 zone, and the enforcement delay ends "no later than January 1, 2035."
ADUs that meet every rule are exempt from design review under Section 17.136.025. The FY 2026-27 Master Fee Schedule lists the "Report Fee for Secondary Units/ADU" under Design Review Exemption at $878.58 per application and the Amnesty Program at $1,461.53. ADUs are exempt from the affordable housing impact fee and from the transportation and capital improvements impact fees under Sections 15.72.040.C and 15.74.040.C. An ADU still needs a building permit, under Section 17.103.080.A.5.
State deadlines set the pace. Under Government Code 66317, the City must say whether an ADU application is complete "not later than 15 business days after the permitting agency received the application," and must "approve or deny the application ... within 60 days" of a complete application when there is an existing home on the lot.
The 2026 ADU Amendments
Ordinance No. 13894 is titled in part "Updating The Accessory Dwelling Unit Regulations For Consistency With State Law And Providing Written Findings Pursuant To Government Code 66326(b)." The Legistar record shows it passed on July 21, 2026. It amends Section 17.103.080 with changes shown as "underline and ... strikethrough" in its Exhibit A, after the edition of the code read for this page. Its recitals say "Staff has prepared amendments to the Oakland Planning Code to address State HCD's remaining findings." For the exact current wording of any ADU rule, read Exhibit A next to Section 17.103.080.
SB 9 Two-Unit Projects in Oakland
Oakland has no SB 9 section in its Planning Code or Title 16, so the state statute governs. Government Code 65852.21 says "A proposed housing development containing no more than two residential units within a single-family residential zone shall be considered ministerially, without discretionary review or a hearing." The key limits:
- Size. The City may not apply standards that "would physically preclude either of the two units from being at least 800 square feet in floor area."
- Setbacks. "a local agency may require a setback of up to four feet from the side and rear lot lines," and none for an existing structure rebuilt in place.
- Parking. Up to one space per unit, and none within "one-half mile walking distance" of a high-quality transit corridor or major transit stop, or where "There is a car share vehicle located within one block of the parcel."
- Tenants. No demolition or alteration of rent-restricted housing, housing under "any form of rent or price control," or "Housing that has been occupied by a tenant in the last three years."
- Historic. No project on a contributing structure in a historic district or on a property listed "as a city or county landmark under a city or county ordinance."
- Fire. The parcel must meet the site rules in Government Code 65913.4(a)(6)(B) to (K) "as that section read on September 16, 2021." In the current text of 65913.4 that list includes Very High Fire Hazard Severity Zones, with an exception for "sites that have adopted fire hazard mitigation measures pursuant to existing building standards or state fire mitigation measures."
- Timing and rentals. A decision within 60 days of a complete application, and any rental "for a term longer than 30 days."
In Oakland, SB 9 matters most in the RH-1, RH-2 and RH-3 hill zones, which allow one primary home per lot. RD and RM lots already allow up to four units under local rules. Whether a zone is "single-family" for SB 9 is decided by the City, and the HCD SB 9 Fact Sheet says lots in "multi-family residential, commercial, agricultural, mixed-use zones, etc., are not subject to SB 9 mandates." Ordinance No. 13855 lists "SB 9 ministerial approval of two lots under Government Code Sections 65852.21 and 66411.7" among the projects that go through Ministerial Design Review. The SB 9 guide covers the state law in full.
Best For
- ✓ A house lot outside the S-9 zone, which may add three accessory units for four homes.
- ✓ An existing fourplex, which may add up to 4 detached ADUs plus interior conversions.
- ✓ Lots within a half-mile walk of transit, where ADUs need no parking.
Usually Fails When
- ✕ The lot is in the S-9 zone and the plan needs a new detached ADU without an extra parking space.
- ✕ The ADU is visible from the street on a California Register property and does not match the house.
- ✕ An SB 9 project would alter a home rented to a tenant in the last three years.
What To Verify Before Spending Money
- → Whether the lot is in the S-9 Fire Safety Protection Combining Zone on the overlay map.
- → The current text of Section 17.103.080 as amended by Ordinance No. 13894.
- → Whether the Planning Bureau treats the zone as single-family for SB 9.
Where to Go Next
Related on VanPlex: the Oakland and Berkeley overview, the California ADU law guide and the SB 9 guide.
Frequently Asked Questions
How many ADUs can I add to a house in Oakland?
How big can a backyard ADU be in Oakland?
How tall can a detached ADU be in Oakland?
Do I need parking for an ADU in Oakland?
Can I build ADUs behind my fourplex in Oakland?
Can I build a new ADU in the Oakland hills fire zone?
Does HCD agree with Oakland's fire zone ADU rules?
Can I legalize an ADU built without permits in Oakland?
Does SB 9 work in Oakland?
Can I use SB 9 on a rented house in Oakland?
Official sources (checked October 2026)
Get new guides by email
New VanPlex guides and articles on multiplex rules, building costs and permits, sent to your inbox.
Planning a multiplex in Oakland?
VanPlex builds multiplexes in British Columbia, Canada. For a lot in Oakland, our team makes a custom proforma by hand and emails it to you in 24 to 48 hours.
Get a proforma for your address