Oakland | Three or More Homes
Oakland Three or More Homes: Missing Middle Zoning, Ministerial Review, S-13, SB 79 and Replacement Rules
Oakland rewrote its residential zones in 2023 so that most lots outside the hills can hold a triplex or a fourplex. A triplex is a building of three homes and a fourplex a building of four. This page explains the local routes to three or more homes: the 2023 zoning, the 2025 Ministerial Design Review, the affordable housing zones, the S-8 zone that carries out the state transit law SB 79, and the rules that protect tenants when an older rental is replaced. The Oakland and Berkeley overview compares Oakland with Berkeley.
Three or more homes in Oakland in six facts
- A building of two to four homes is a permitted use in the RD, RM and RU zones and in RH-4, and RD and RM lots allow 3 units on 3,000 sq ft and 4 units on 4,000 sq ft. Source: Tables 17.15.02, 17.15.03, 17.17.03
- In RD and RM there is no lot coverage limit for 3 or more units, and lot coverage and floor area limits apply only to lots with one or two units. Source: Tables 17.15.03 and 17.17.03
- Projects of two to four units on a parcel, outside a planned unit development, are exempt from Oakland's affordable housing impact fee as "Missing Middle housing." Source: OMC 15.72.040.C.4
- Ordinance No. 13855 (July 15, 2025) created Ministerial Design Review, with no public hearing and no appeal, for projects of up to 30 new units that need no use permit or variance. Source: Ordinance No. 13855 text
- In the S-13 zone, a project on a lot under 15,000 sq ft with at least 20 percent very low or low income units and 20 percent moderate income units gets by-right approval and unlimited density. Source: Planning Code 17.95.020, 17.95.060
- Ordinance No. 13875, adopted March 16, 2026, created the S-8 zone for SB 79 around 9 BART stations and the AC Transit Tempo stops, and excluded many of those sites until as late as January 31, 2032. Source: Ordinance No. 13875 text
Triplexes and Fourplexes in RD and RM
Ordinance No. 13763, adopted October 3, 2023, set the same small-building rule in the RD zone and all four RM zones: "1-2 units on any legal lot; 3 units on minimum 3,000 sf. lots; 4 units on minimum 4,000 sf. lots." The facility tables list a "Two- to Four-Family Dwelling" as permitted, marked P. Chapter 17.10 defines it as a building with "two (2) to four (4) Regular Dwelling Units or Efficiency Dwelling Units on a parcel." A permitted use needs no use permit, though design review still applies.
Two limits that apply to houses are lifted for these buildings. "Maximum Lot Coverage for 3 or More Units" reads "N/A" in Tables 17.15.03 and 17.17.03, and Additional Regulation 19 says "Maximum Lot Coverage and maximum Floor Area Ratio (FAR) only apply to lots with one to two dwelling units." Lot coverage is the share of the lot under buildings, and floor area ratio is total floor area divided by lot area. A fourplex is limited by setbacks, height and open space instead. In RD each unit needs 100 square feet of group open space, a shared yard, or 25 square feet when private open space is substituted; in RM the figures are 75 and 25.
The parking, setbacks and height page has those limits. Parking needs are small: a Two- to Four-Family Dwelling needs "½ space for each dwelling unit," and none within half a mile of a major transit stop.
Five or More Homes in RM and RU
The RM zones allow a "Multifamily Dwelling," five or more units, by lot area per unit, while the RD zone lists it as prohibited. The table shows the lot area each unit needs, with examples by VanPlex arithmetic on lot sizes that divide evenly.
| Zone | Lot area per unit (5 or more units) | Examples |
|---|---|---|
| RM-1 | 1,750 sq ft | 7,000 sq ft lot: 4 units; 8,750 sq ft lot: 5 units |
| RM-2 | 1,500 sq ft | 7,500 sq ft lot: 5 units; 9,000 sq ft lot: 6 units |
| RM-3 | 1,250 sq ft | 6,250 sq ft lot: 5 units; 7,500 sq ft lot: 6 units |
| RM-4 | 1,000 sq ft | 5,000 sq ft lot: 5 units; 6,000 sq ft lot: 6 units |
Source: Oakland Planning Code Table 17.17.03, "For 5 or more units" row. Examples are VanPlex arithmetic.
The RU zones use lot area for any count: one unit per 1,000 square feet in RU-1, 750 in RU-2 and 450 in RU-3. In RU-4 and RU-5 the zoning map's height area sets it, from 500 square feet per unit in the 35-foot area to 200 in the 95 and 125-foot areas. The zoning districts page has the RU tables.
Design Review: Regular or Ministerial
In Supplement 59, Section 17.136.040 lists "New construction of three (3) or more dwelling units, or adding units to a property for a total of three (3) or more dwelling units on site" among the projects that need Regular Design Review. The Director of City Planning decides it unless the Director refers it to the Planning Commission. Notice goes to "all owners and occupants within three hundred (300) feet of the project site" at least 17 days before the decision, and a Director's decision becomes final ten days later "unless appealed to the City Planning Commission or the Commission's Residential Appeals Committee."
Ordinance No. 13855, passed July 15, 2025 according to the Legistar record, added a faster track. Its text adds a new Section 17.136.038, "Ministerial Design Review," for projects "not requiring or requesting any Conditional Use Permit, Variance, Planned Unit Development, or Development Agreement, and involving the creation of no more than thirty (30) new dwelling, Work/Live, or Live/Work units outside any existing building envelope." Under it:
- "The project shall not be subject to a public hearing of any type."
- "The decision by the Director or their designee shall be final immediately and not appealable."
- "The City shall not exercise subjective judgment," and approval is granted for proposals that meet the zone's standards and the City's objective design standards.
- The project must complete an Equitable Climate Action Plan consistency checklist.
- The pre-application notice to neighbors within 300 feet "does not apply to projects that are thirty (30) units or less in size."
Some sites are left out: projects "accessed by Panoramic Way, Panoramic Place, Dwight Way, Dwight Place, and Bancroft Place"; one-family homes in mapped critical habitat; and "Projects proposed on a site with a City or State landmark, listed on the National Register, or within an S-7 or S-20 Zone." The City's May 26, 2025 report describes the aim as "by-right approval of additional residential project types, including all single-family homes, 2- to 4-unit residential projects, and lower-density multifamily developments (up to 30 units)."
Here the code and the City's records disagree. The Supplement History Table of Supplement 59 lists ordinances through No. 13868 but does not list No. 13855, and the published Section 17.136.038 is still "Special project design review." The FY 2026-27 Master Fee Schedule, adopted by Ordinance No. 13883, lists "Ministerial Project Design Review" at $5,574.28. Municode's edition does not yet include the ordinance, so read the ordinance text and confirm the ministerial track with the Planning Bureau when you apply.
Impact Fees for Small Buildings
An impact fee is a charge on new building that pays for the added demand on city services. Oakland's affordable housing impact fee, in Chapter 15.72, exempts small buildings since Ordinance No. 13853 of July 15, 2025. Section 15.72.040.C.4 exempts "Missing Middle housing: Any combination of between two (2) and no more than four (4) units on a parcel that are part of a Development Project that is not subject to the Planned Unit Development (PUD) regulations." A house of 1,750 square feet or less is exempt too.
For more than four units, Section 15.72.050 charges "Fees Per Square Foot x (Additional Residential Square Footage - Residential Square Footage of the four (4) smallest units)." A worked example by VanPlex: six units of 900 square feet pay on 1,800 square feet, the floor area of two units. The transportation and capital improvements fees in Chapter 15.74 have no small-building exemption. The permits and fees page has the rates.
Affordable Housing Zones: S-13 and S-14
The S-13 Affordable Housing Combining Zone is "an optional program." A project gets "By Right Residential Approval," a staff approval against written standards with no hearing, if it is 100 percent affordable, or if it is on "a parcel less than fifteen thousand (15,000) square feet" and "At least twenty percent (20%) of the housing units are restricted to very low-income or low-income households" and "At least twenty percent (20%) of the housing units are restricted to moderate-income households." Table 17.95.01 then gives "Unlimited residential density that fits within the allowed building envelope," a 10-foot rear setback, lot coverage of "Seventy percent (70%) or whatever is allowed in the base zone, whichever is higher," "Two (2) additional stories above the maximum permitted building height in the base zone" on lots under 15,000 square feet, and "No minimum parking requirements." Up to three more incentives may be requested. S-13 "cannot be combined" with the density bonus, and it does not apply in the S-9 zone or on landmark parcels.
The S-14 Housing Sites Combining Zone covers the sites listed in the 2023-2031 Housing Element. Projects there must be a "Majority Residential Use" and reach at least 70 percent of the site's "Realistic Capacity," the unit count the Housing Element assumed. On a site used in a prior Housing Element, a project gets by-right approval "if ... at least twenty percent (20%) of the project's units will be made available to lower-income households." Ordinance No. 13874, adopted March 16, 2026, amended Chapter 17.96 after Supplement 59.
State Density Bonus
The state density bonus law lets a project with affordable units build more homes than the zone allows and ask for incentives. Oakland carries it out in Chapter 17.107, which applies "to all proposals, citywide, to create five (5) or more living units ... in which the developer is requesting a density bonus." It adds: "Any provision in California Government Code Sections 65915-65918 (inclusive), but not included in this Chapter, is considered by the City of Oakland to be valid and applicable." On request, Section 17.107.120 caps parking at one space for 0 to 1 bedroom units, one and a half for 2 to 3 bedrooms, and two and a half for 4 or more, and at half a space per unit near a major transit stop when the project meets set affordability shares.
SB 79 Near BART and Tempo: the S-8 Zone
SB 79 is a 2025 state law that raises height and density near major transit stops from July 1, 2026. Alameda County is one of the counties named in the HCD advisory. The City's January 26, 2026 report summarized the state standards for Oakland this way:
| Distance from the stop | Height limit | Maximum density | Floor area ratio |
|---|---|---|---|
| Tier 1 (BART), within 200 feet | 95 ft | 160 units per acre | 4.5 |
| Tier 1, within a quarter mile | 75 ft | 120 units per acre | 3.5 |
| Tier 1, within a half mile | 65 ft | 100 units per acre | 3 |
| Tier 2 (Tempo bus), within 200 feet | 85 ft | 140 units per acre | 4 |
| Tier 2, within a quarter mile | 65 ft | 100 units per acre | 3 |
| Tier 2, within a half mile | 55 ft | 80 units per acre | 2.5 |
Source: City of Oakland, SB 79 Planning Code Implementation Ordinance report, January 26, 2026, Table 2. The report notes projects "may be up to the height permitted by SB 79, or up to the local height limit, whichever is greater."
Ordinance No. 13875, passed March 16, 2026 according to the Legistar record, adds Chapter 17.86, the S-8 Abundant and Affordable Homes Near Transit Combining Zone, effective July 1, 2026. "The S-8 Zone includes all parcels of land that are within one-half mile of Tier 1 and Tier 2 Transit-Oriented Development Zones, regardless of their zoning designation." Tier 1 stops are eight BART stations in Oakland plus Ashby BART across the line; Tier 2 stops are the AC Transit Tempo bus rapid transit stops from Uptown to 103rd Avenue, plus Durant Avenue. The zoning map marks each parcel "Ineligible," "Eligible but excluded," or "Covered."
Section 17.86.060 adopts three exclusions allowed by Government Code 65912.161:
- Zoning already at half of SB 79. Sites whose zones allow density and floor area "at no less than 50 percent of the standards" are excluded, listed by zone and distance. The exclusion does not cover sites within half a mile of Ashby, MacArthur and Rockridge BART, or sites between Lake Merritt and 25th Avenue, or between 66th Avenue and Hegenberger Road.
- Low-resource TOD zones. Whole zones around 19th Street, 12th Street, West Oakland and Fruitvale BART and a list of Tempo stops, which are "primarily comprised of a low-resource area" with enough existing zoned density.
- Historic sites. "All sites on the Local Register as mapped on City of Oakland Geospatial Information System Zoning Map as of January 1, 2025, are excluded."
"The exclusions included in Section 17.86.060 are valid until January 31, 2032, or one year following the adoption of the seventh revision of the City of Oakland Housing Element, or adoption of a local transit-oriented development alternative plan, whichever occurs first." A covered SB 79 project still goes through design review, the creek and tree rules, Chapter 17.122 replacement rules and the impact fees (Section 17.86.080). A further amendment, File 27-0037, "To Address Comments Received From California Department Of Housing And Community Development," was before the City Council and had no passed date in the Legistar record on October 9, 2026.
The ordinance disagrees with itself on one stop. Section 4 says the zoning map changes apply "not including sites within one-half mile of Lake Merritt BART Station on Exhibit B Map 7 and AC Transit Stops listed on Exhibit B Map 16" through Map 28, nor Coliseum BART and the stops on Maps 37 through 42, and those maps carry the stamp "Exclusion Removed by Council Amendment 3/3/2026." Yet the list in Section 17.86.060.B still names the "AC Transit TEMPO 20th Avenue Stop (Map 28)." Section 17.86.040 says "The City shall indicate on its public zoning map" the status of each parcel, so check the S-8 map for any site near the 20th Avenue stop.
Replacing Rental Homes: Chapter 17.122 and Chapter 8.22
Many Oakland lots large enough for a fourplex already hold an older rental. Chapter 17.122, added by Ordinance No. 13822 in December 2024, carries out the state Housing Crisis Act. It applies to "any development project that is proposed on any property that includes a parcel or parcels on which a dwelling unit is located or was located in the ten years preceding application submittal." A "Protected Unit" includes a rental unit that is or was in the last five years "subject to any other form of rent or price control, including Oakland Municipal Code Section 8.22.010 et seq. and the California Tenant Protection Act of 2019," or occupied by a lower income household in that period.
- Hard limits. Demolition is prohibited when the new project "creates fewer dwelling units than the greatest number of dwelling units that existed on the project site within the last five years," or after adjudicated tenant harassment or illegal eviction.
- Replacement. Every Protected Unit must be replaced with a deed-restricted affordable unit of "Equivalent Size," the same bedroom count and, in new buildings, at least 90 percent of the floor area. Fractions round up.
- Notice. Thirty to sixty days before applying, the developer must notify occupants in writing, including the bold sentence "This notice is not an eviction notice."
- Return. Lower income occupants get a right of first refusal to rent a new unit at an affordable rent.
Chapter 8.22 adds payments. Section 8.22.820 sets base relocation payments for a no-fault move of $6,500 for a studio or one bedroom, $8,000 for two bedrooms and $9,875 for three or more, plus $2,500 per unit for households with lower income, elderly or disabled tenants, or minor children. These amounts "shall increase annually on July 1" with the City's CPI adjustment. When an owner removes all units under the Ellis Act, Section 8.22.450 applies the same payments, and if new rental units built on the site are offered "within five (5) years," they fall under rent controls "notwithstanding any exemption" for new construction. New buildings are otherwise exempt from rent adjustment if they received a certificate of occupancy "on or after January 1, 1983," and from the just cause rules for ten years.
Best For
- ✓ A vacant or owner-occupied RD or RM lot of 4,000 sq ft or more, for a fourplex with no affordable housing impact fee.
- ✓ A project of up to 30 units that fits the zone, through Ministerial Design Review.
- ✓ An S-13 lot under 15,000 sq ft with 20 percent lower income and 20 percent moderate income units.
Usually Fails When
- ✕ The site has rentals and the plan has fewer units than the most the site held in five years.
- ✕ The lot is in an S-7 or S-20 zone or holds a landmark, which rules out Ministerial Design Review.
- ✕ A transit site near Oakland BART is mapped "Eligible but excluded" in the S-8 zone.
What To Verify Before Spending Money
- → Whether any unit on the site was rented, rent-controlled or Ellis-withdrawn in the last five to ten years.
- → The S-8 map status of the parcel and the outcome of File 27-0037.
- → That the Planning Bureau will process the project under Ministerial Design Review.
Where to Go Next
Related on VanPlex: the Oakland and Berkeley overview, the SB 79 guide and the rent and tenant rules page.
Frequently Asked Questions
Can I build a fourplex on a 4,000 square foot lot in Oakland?
Does a new fourplex in Oakland pay the affordable housing impact fee?
How is the Oakland affordable housing impact fee counted for five or more units?
What is Ministerial Design Review in Oakland?
Is Oakland's Ministerial Design Review in the online Planning Code?
What does the S-13 zone allow in Oakland?
Does SB 79 apply near Oakland BART stations?
Can I demolish a rented house to build a fourplex in Oakland?
How much relocation money does an Oakland landlord pay a tenant who must move?
Does the Oakland density bonus apply to a fourplex?
Official sources (checked October 2026)
Get new guides by email
New VanPlex guides and articles on multiplex rules, building costs and permits, sent to your inbox.
Planning a multiplex in Oakland?
VanPlex builds multiplexes in British Columbia, Canada. For a lot in Oakland, our team makes a custom proforma by hand and emails it to you in 24 to 48 hours.
Get a proforma for your address