Oakland | Lots and Subdivisions

Oakland Lot Size and Subdivisions: Minimum Lots, Parcel Maps, SB 684 and SB 9

Two parts of Oakland's Municipal Code decide how land may be divided. The Planning Code (Title 17) sets the minimum size and width of a lot in each zone. The Subdivision Regulations (Title 16) set how a lot is split, who decides, and how long it takes. A subdivision is any division of land into new lots, and a map is the drawing, checked by the City and recorded with the county, that creates them. This page covers both titles, plus the state laws that create new routes. The Oakland and Berkeley overview gives the short version.

Oakland lots and subdivisions in six facts

Minimum Lot Size by Zone

Each zone's development standards table starts with "Minimum Lot Dimensions." Three numbers apply: lot area, "Lot Width mean" and "Frontage." Chapter 17.09 defines lot width mean as "the mean of the horizontal distances between the side lot lines" measured 20 feet from the front lot line and 20 feet from the rear lot line. In plain terms it is the average width of the lot near the front and near the back. Frontage is the front lot line, the edge that faces the street.

Zone Minimum lot area Lot width mean Frontage
RH-1 43,560 sq ft (1 acre) 100 ft 25 ft
RH-2 25,000 sq ft 100 ft 25 ft
RH-3 12,000 sq ft 90 ft 25 ft
RH-4 6,500 or 8,000 sq ft 45 ft 25 ft
RD 2,000 sq ft 20 ft 20 ft
RM-1 to RM-4 2,000 sq ft 20 ft 20 ft
RU-1, RU-2 2,500 sq ft 25 ft 25 ft
RU-3, RU-4, RU-5 4,000 sq ft 25 ft 25 ft

Source: Oakland Planning Code Table 17.13.03, Table 17.15.03, Table 17.17.03 and Table 17.19.03, Supplement 59.

The hill zones add rules for new subdivisions. In RH-3, "the minimum average lot width of all lots within a subdivision shall be ninety (90) feet, and the minimum lot width of any individual lot within such subdivision shall be seventy-five (75) feet," and lots must average 12,000 square feet with none under 10,000. In RH-4 the minimum depends on the map. For "Subdivision Maps of four (4) or fewer lots where each lot created has a buildable area slope of less than or equal to twenty percent (20%), the minimum lot size is six thousand five hundred (6,500) square feet." Any lot steeper than 20 percent, or a map of five or more lots, raises the minimum to 8,000 square feet. The buildable area slope is measured "at the steepest point between the front and rear setbacks."

These minimums matter for unit counts too. An RD or RM lot needs 3,000 square feet for a third unit and 4,000 for a fourth, so splitting a 6,000 square foot RD lot into two 3,000 square foot lots trades one fourplex lot for two triplex lots, by VanPlex arithmetic: 4 homes become 6. The zoning districts page has the full unit table.

Lot Design Rules in Title 16

Section 16.16.170 sets the shape of new lots. "Every lot shall abut on a street," except as Section 17.106.020 allows. "Double frontage lots shall not be platted," meaning a lot may face one street. Side lot lines should be "approximately at right angles to the street line," and each lot must have "the minimum area prescribed by the zoning district within which it lies."

One rule limits small lots in established blocks. "Lots shall be equal or larger in measure than the prevalent size of existing lots in the surrounding 200-foot radius area," except "Where the area is still considered acreage" or "Where a deliberate change in the character of the area has been initiated by the adoption of a specific plan, a change in zone, a development control map, or a planned unit development." The 2023 rezoning that allowed up to four units on RD and RM lots is a change in zone, so ask the Planning Bureau how it reads this exception for your block. The same section asks that lots be "designed in a manner to preserve and enhance natural out-croppings of rock, specimen trees or group of trees, creeks or other amenities."

Parcel maps have their own version in Section 16.24.040. No lot may be created without frontage on a public street, except a lot served by an approved private access easement, or "A single lot with frontage on a public street by means of a vehicular access corridor." That corridor must be at least 20 feet wide and no more than 300 feet long, and "its area (square footage) shall not be included in computing the minimum lot area requirements of the zoning district." This is the rule for a flag lot, a rear lot that reaches the street by a narrow strip. Section 16.24.050 lets the Advisory Agency "grant such variances to the lot design standards as it determines warranted" where size, shape, slope, trees or buildings make the standards impractical.

Parcel Maps: Splits of Four Lots or Fewer

A parcel map is the shorter map process for small divisions. Section 16.24.010 requires one for the divisions listed in Subdivision Map Act Section 66426(a) to (d) "or other subdivisions for which a final map is not required," and adds that "Creation of new condominiums that are not a conversion as defined in Section 16.36.010 shall be processed as a parcel map." So a new building of condominium homes goes through this chapter.

  • Who decides. "The Director of City Planning is designated as the advisory agency" for parcel maps (Section 16.24.030).
  • What to file. A tentative parcel map "prepared by a registered civil engineer or licensed land surveyor," with five prints. It must show each parcel's size, access, existing buildings to remain, slopes, drainage, and every tree "measuring at least twelve (12) inch diameter" at four feet above grade (Sections 16.24.070 and 16.24.080).
  • How long. "The Advisory Agency shall, within fifty (50) days after the receipt of the tentative parcel map, act upon the map." If it "fails to act within the prescribed time limit, the tentative parcel maps shall be deemed approved." The Agency "may, in its discretion, refer any parcel map to the City Planning Commission."
  • Soil report. Before the parcel map is submitted, the divider files "a preliminary soil report prepared by a civil engineer registered by the state of California who specializes in soils mechanics." The City Engineer may waive it (Section 16.24.090).
  • Public works. The City Engineer decides what street, sidewalk, sewer, drainage and lighting work the new lots need. The map is not approved until the work is done or secured by a bond or deposit of 50 to 100 percent of the estimated cost for performance, plus the same range for payment of workers and suppliers (Section 16.24.060).
  • Waiver. The Advisory Agency may waive the parcel map for a lot line adjustment "which does not create a new lot" and for a few other cases, such as a transfer to a public agency (Section 16.24.020).

Larger divisions use a tentative map and a final map under Chapters 16.08 and 16.12, with the City Planning Commission as the advisory agency (Section 16.04.050). Under Section 16.08.030, the Commission waits for the City Engineer's report unless "more than twenty-three (23) days have elapsed," and must deny a map if, among other findings, "the site is not physically suitable for the proposed density of development."

Map Fees for 2026-27

Oakland's fees are in its Master Fee Schedule. Ordinance No. 13883, adopted June 16, 2026, set the FY 2026-27 amounts. Map fees are charged by two departments, Planning and Building and the Department of Transportation.

Fee FY 2026-27 amount
Tentative parcel map (Planning, report fee) $5,445.46
All other tentative maps, basic fee (Planning) $7,409.99
Private access easement (Planning) $3,444.35
Parcel map: tentative map review (Transportation) $2,501.11
Parcel map: parcel map review (Transportation) $2,986.19
Tract map: tentative map review (Transportation) $6,255.96, plus $618.03 for each lot over 5
Tract map: final map, engineer review and Council action (Transportation) $12,266.08

Source: City of Oakland, FY 2026-27 Master Fee Schedule, Exhibit A to Ordinance No. 13883, "Proposed 2026-27" column, Planning and Building pages O-5 and Department of Transportation pages Q-4 and Q-5. The June 4, 2026 supplemental report corrected only an Economic and Workforce Development fee unit.

The permits and fees page lists the design review, permit and impact fees that come on top.

Private Access Easements and Old Lots

Chapter 16.32 allows a shared private driveway in place of a new street. A private access easement is "a privately owned and maintained right-of-way which provides vehicular access to each of not more than four lots." It "allows the creation of no more than four lots without street frontage," and "The area designated for the private access easement shall be excluded in computing minimum lot areas." Section 16.32.030 allows it where frontage is too narrow for a street, where a street would create fewer lots, or where slopes rule out a street.

One clause needs care after the 2023 rezoning. Section 16.32.040.B says the Advisory Agency shall not approve such a division "Where the Zoning Regulations permit more than one dwelling unit per lot." Since October 2023 the RD and RM zones permit up to four units per lot, so, read literally, the clause now covers those zones. Ask the Planning Bureau how it applies this clause before you design a rear-lot project around a shared driveway.

Section 17.106.010 helps with existing lots. "Any existing substandard parcel of contiguous land may be developed as a lot if such parcel existed lawfully under the previous zoning controls." A parcel with "two (2) or more existing principal buildings which were lawfully established" may be divided into lots smaller than the minimum by Conditional Use Permit, a discretionary permit decided after review. "Each resulting lot shall accommodate at least one existing principal building and each lot shall have frontage on a street," and the split must keep the existing usable open space and parking.

SB 684 Small-Lot Subdivisions

SB 684 is a state law that lets a builder divide a parcel into up to 10 small lots for for-sale homes, with staff approval. Oakland wrote its local standards into Section 17.106.010.C. They apply where a parcel "is no larger than five (5) acres and shall be subdivided into ten (10) or fewer lots for a for-sale housing units development project":

  • "a minimum lot size of six hundred (600) square feet," and "the minimum lot width and minimum lot frontage dimensional requirements otherwise prescribed shall not apply";
  • "Interior side setbacks are not required between units";
  • "A minimum rear setback of four (4) feet," and a street side setback of four feet or the zone setback, whichever is less;
  • a side setback of four feet or the zone setback, whichever is less, next to lots outside the subdivision;
  • a maximum floor area ratio of no less than 1.0 for three to seven units and no less than 1.25 for eight to ten units, where the zone has a residential floor area ratio at all. Floor area ratio is building floor area divided by lot area.

The map path is fixed by Sections 16.04.050 and 16.24.030, as amended by Ordinance No. 13805 in July 2024: "any map required by State law to be processed pursuant to State Law SB 684 ... shall be ministerially processed and approved by the Planning and Building Department and/or the Department of Transportation with no right of appeal." Ministerial means staff check the map against written standards, with no hearing. Chapter 15.72 also exempts "A Development Project subject to State Law SB 684" from the affordable housing impact fee.

One typing error appears in the code. Section 17.106.010.C.1 says "The resulting parcels of an SB 784 subdivision," while the heading and every other paragraph of the subsection say SB 684. The subsection's heading names SB 684, so the 600 square foot rule applies to SB 684 subdivisions.

SB 9 Urban Lot Splits

An urban lot split under SB 9 divides one lot into two with a ministerial parcel map. Title 16 and the Planning Code, as read in Supplements 103 and 59, contain no urban lot split chapter. The state rules in Government Code 66411.7 apply as written. Each new parcel must be at least 1,200 square feet, and "one parcel shall not be smaller than 40 percent of the lot area of the original parcel." The parcel must be "located within a single-family residential zone." The split may not require demolition of rent-controlled housing or "Housing that has been occupied by a tenant in the last three years," and the parcel may not be "a site that is designated or listed as a city or county landmark." The City must approve or deny a complete application "within 60 days."

Which Oakland zones count as single-family is a question for the Planning Bureau. The HCD SB 9 Fact Sheet says "Parcels located in multi-family residential, commercial, agricultural, mixed-use zones, etc., are not subject to SB 9 mandates even if they allow single-family residential uses as a permitted use," and that "natural features such as hillsides" should not factor into the choice. The RH-1, RH-2 and RH-3 zones allow one primary home per lot, while RD and RM now allow up to four. Ordinance No. 13855 lists "SB 9 ministerial approval of two lots" among the projects that use Oakland's Ministerial Design Review, as the ADU and SB 9 page explains.

Hillside Subdivisions

Chapter 16.28 adds rules where land "has an average difference in elevation of more than fifteen (15) feet in a horizontal distance of one hundred (100) feet" and new streets are built on unsubdivided land. Lots facing both sides of a new hillside street need "not less than eight thousand (8,000) square feet with an average frontage of not less than eighty (80) feet," and lots on one side need 6,000 square feet and 60 feet of width. The hills, fire zone and creeks page covers hillside street widths and fire access.

Best For

  • ✓ An RD or RM lot of 6,000 sq ft or more, where two 3,000 sq ft lots each allow three homes.
  • ✓ A for-sale project of up to 10 lots under SB 684, with 600 sq ft lots and no appeal.
  • ✓ A parcel with two old houses, split by Conditional Use Permit.

Usually Fails When

  • ✕ The new lots would be smaller than the prevalent lot size within 200 feet, and no exception applies.
  • ✕ The lot is in RH-3 or RH-4, where subdivision lot sizes are 10,000 to 12,000 or 6,500 to 8,000 sq ft.
  • ✕ A rear-lot plan depends on a private access easement in a zone that allows more than one unit per lot.

What To Verify Before Spending Money

  • → The lot width mean and frontage, measured the way Chapter 17.09 defines them.
  • → Whether the Planning Bureau treats your zone as single-family for SB 9.
  • → The public works the City Engineer will require before the parcel map is approved.

Where to Go Next

Related on VanPlex: the Oakland and Berkeley overview, the SB 9 guide and the SB 684 and SB 1123 guide.

Frequently Asked Questions

What is the minimum lot size in Oakland's RD zone? +
The minimum lot in Oakland's RD Detached Unit Residential zone is 2,000 square feet, with a lot width mean of 20 feet and 20 feet of frontage, under Table 17.15.03 of the Planning Code. The four RM zones use the same numbers. Title 16 adds that new lots should match the prevalent lot size within a 200-foot radius.
How long does Oakland take to decide a tentative parcel map? +
Oakland Municipal Code Section 16.24.080 gives the Advisory Agency, the Director of City Planning, 50 days after receiving a tentative parcel map to approve, conditionally approve or disapprove it. If the Agency fails to act within that time, the map is deemed approved. The Director may also refer any parcel map to the City Planning Commission.
Can I split an Oakland lot into smaller lots than the neighbors have? +
Oakland Municipal Code 16.16.170 requires new lots to be equal to or larger than the prevalent size of existing lots in the surrounding 200-foot radius. The rule does not apply where the area is still acreage or where the City has changed the area by a specific plan, a change in zone, a development control map or a planned unit development.
How small can an SB 684 lot be in Oakland? +
Under Oakland Planning Code Section 17.106.010, lots in an SB 684 subdivision may be as small as 600 square feet, with no minimum width or frontage. The parcel must be 5 acres or less and divided into 10 or fewer lots for for-sale homes. Interior side setbacks between SB 684 units are not required, and the rear setback is 4 feet.
Can neighbors appeal an SB 684 map in Oakland? +
No. Oakland Municipal Code Sections 16.04.050 and 16.24.030, as amended by Ordinance No. 13805 in July 2024, say any map required by state law to be processed under SB 684 shall be ministerially processed and approved by the Planning and Building Department and/or the Department of Transportation with no right of appeal.
Does Oakland have its own SB 9 lot split rules? +
Oakland's Title 16 and Planning Code, as read in Supplements 103 and 59, contain no SB 9 urban lot split chapter. The state rules in Government Code 66411.7 apply: two new lots of about equal size, neither under 40 percent of the original lot, each at least 1,200 square feet, with a decision within 60 days of a complete application.
What is a private access easement in Oakland? +
In Oakland a private access easement is a privately owned and maintained right-of-way that gives car access to no more than four lots without street frontage, under Section 16.32.010. Its area is excluded when lot area is computed. The application fee in the FY 2026-27 Master Fee Schedule is $3,444.35.
Can a lot with two old houses be split in Oakland? +
Yes, with a Conditional Use Permit. Oakland Planning Code Section 17.106.010.B lets a parcel with two or more lawfully built main buildings be divided into lots that miss the minimum lot area, width and frontage. Each new lot must keep at least one existing building and have street frontage, and the existing parking and open space must be kept.
Is a soil report needed for an Oakland parcel map? +
Yes. Oakland Municipal Code 16.24.090 requires the divider to file a preliminary soil report with the City Engineer before submitting a parcel map, prepared by a California civil engineer who specializes in soil mechanics. The City Engineer may waive it when no analysis is needed based on known soil qualities of the parcel and nearby land.
What does a tentative parcel map cost in Oakland in 2026-27? +
The FY 2026-27 Oakland Master Fee Schedule, adopted by Ordinance No. 13883, lists a Planning report fee of $5,445.46 for a tentative parcel map. The Department of Transportation adds $2,501.11 to review the tentative map and $2,986.19 to review the parcel map. Other fees, such as environmental review, can apply.

Official sources (checked October 2026)

Oakland Municipal Code, Chapter 16.04, subdivision general provisions (Supplement 103)
https://library.municode.com/ca/oakland/codes/code_of_ordinances?nodeId=TIT16SU_CH16.04GEPRAD
Oakland Municipal Code, Chapter 16.08, tentative maps
https://library.municode.com/ca/oakland/codes/code_of_ordinances?nodeId=TIT16SU_CH16.08TEMA
Oakland Municipal Code, Chapter 16.16, design standards (Section 16.16.170, lots)
https://library.municode.com/ca/oakland/codes/code_of_ordinances?nodeId=TIT16SU_CH16.16DEST
Oakland Municipal Code, Chapter 16.24, parcel maps
https://library.municode.com/ca/oakland/codes/code_of_ordinances?nodeId=TIT16SU_CH16.24PAMA
Oakland Municipal Code, Chapter 16.28, hillside subdivisions
https://library.municode.com/ca/oakland/codes/code_of_ordinances?nodeId=TIT16SU_CH16.28HISU
Oakland Municipal Code, Chapter 16.32, private access easements
https://library.municode.com/ca/oakland/codes/code_of_ordinances?nodeId=TIT16SU_CH16.32PRACEA
Oakland Planning Code, Chapter 17.106, general lot, density and area regulations (Supplement 59)
https://library.municode.com/ca/oakland/codes/planning_code?nodeId=TIT17PL_CH17.106GELODEARRE
Oakland Planning Code, Chapter 17.13, RH zones (lot standards)
https://library.municode.com/ca/oakland/codes/planning_code?nodeId=TIT17PL_CH17.13RHHIREZORE
Oakland Planning Code, Chapter 17.19, RU zones (lot standards)
https://library.municode.com/ca/oakland/codes/planning_code?nodeId=TIT17PL_CH17.19RUURREZORE
Ordinance No. 13883, FY 2026-27 Master Fee Schedule, Exhibit A (PDF)
https://oakland.legistar1.com/oakland/attachments/c9f664b9-adad-4f37-85c2-faa8c4c1cce1.pdf
Government Code 66411.7 (SB 9 urban lot splits)
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV&sectionNum=66411.7
Government Code 66499.41 (SB 684 subdivision maps)
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=GOV&sectionNum=66499.41
HCD SB 9 Fact Sheet (PDF)
https://www.hcd.ca.gov/sites/default/files/docs/planning-and-community/sb-9-fact-sheet.pdf
VanPlex newsletter

Get new guides by email

New VanPlex guides and articles on multiplex rules, building costs and permits, sent to your inbox.

General information, not legal advice. California housing law changes every year, and each city adds its own rules on top of state law. Confirm current requirements with the city or county planning department, and with a California-licensed attorney or architect, before you buy land or file plans.