Oakland | Hills, Fire Zone, Creeks
Oakland Hills, Fire Zone and Creeks: The S-9 Zone, Hillside Streets, Creek Permits and Fault Reports
The Oakland Hills carry rules that the flatlands do not. Fire risk and narrow streets limit new homes through the S-9 Fire Safety Protection Combining Zone. Steep land has its own street and lot rules. Creeks that cross private lots need a permit for nearby work, and earthquake fault zones need a geologic report. This page collects those rules from the Planning Code, Titles 13, 15 and 16 of the Municipal Code, and the City's 2025 fire hazard ordinance. The Oakland and Berkeley overview covers the rest of the city.
Oakland hills, fire zone and creeks in six facts
- The S-9 Fire Safety Protection Combining Zone maps lots in or next to Very High Fire Hazard Severity Zones that are reached by streets under 26 feet wide or by dead-end streets of 600 feet or longer. Source: Planning Code 17.88.010
- Ordinance No. 13851, passed June 17, 2025, designated the City's whole Wildfire Prevention Zone as Oakland's Very High Fire Hazard Severity Zone, including areas the State Fire Marshal's 2025 map left out. Source: Ordinance No. 13851 text
- In the S-9 zone, new detached and attached ADUs are prohibited, RH-4 lots may not add a second primary unit, and the S-13 affordable housing rules do not apply. Source: Planning Code 17.88.050, 17.13.050, 17.95.050
- A new local street in a hillside area needs at least 40 feet of right-of-way and 26 feet of pavement with homes on both sides, and a dead-end street over 600 feet needs a second access. Source: Oakland Municipal Code 16.16.025
- Work within 20 feet of the top of a creek bank is a Category IV creek protection permit, which needs a creek protection plan, a hydrology report and mailed notice to owners within 300 feet. Source: Oakland Municipal Code 13.16.130 to 13.16.180
- In a state Special Studies Zone for earthquake faults, no building for people may sit across an active fault trace or within 50 feet of one unless a geologic study shows the site is clear. Source: Oakland Municipal Code 15.20.050
What the S-9 Zone Is
A combining zone is a second layer of zoning on top of the base zone. Chapter 17.88 says the intent of the S-9 zone is to make sure that activities and facilities "located, in whole or part, within or adjacent to Very High Fire Hazard Severity Zones (VHFHSZs) ... and accessed from streets that are less than twenty-six (26) feet in width at any point or culs-de-sac that do not meet emergency access standards, develop in such a manner as not to be a serious threat to public health or safety." Section 17.88.030 says these zones are mapped from "data and models of potential fuels over a given time horizon and their associated expected fire behavior and burn probabilities."
The zone is mapped by two tests. The lot must be in or next to a Very High Fire Hazard Severity Zone, and either "The lot is accessed by streets connecting the lot to the nearest arterial street ... with a pavement width of less than twenty-six (26) feet at any point," or the lot "is located on a dead-end street that has a total length of six hundred (600) feet or longer from the nearest intersection." The S-9 zone "may be combined with any other zone," so an RD or RM lot can be in it as well as an RH lot.
Section 17.88.020 gives the reasons. Parts of the zone are "areas of Oakland Hills that suffered from the devastating Oakland firestorm in 1991." The Oakland Fire Department's tools "show that current road and intersection capacity in VHFHSZ is not adequate for the existing population in the events of mass emergency evacuations." Streets under 26 feet wide or dead ends over 600 feet "do not meet minimum emergency access standards as specified in Municipal Code Section 16.16.025(C)(1)."
Oakland's Own Fire Hazard Map
Section 17.88.030 defines the Very High Fire Hazard Severity Zones as the areas identified by "the California Department of Forestry and Fire Protection (CAL FIRE) within Local Responsibility Areas" and by the "City of Oakland, as authorized by Government Code Section 51179." Ordinance No. 13856, adopted July 15, 2025, added the City's own map to that definition.
The City's April 29, 2025 report explains why. "On Monday, February 24, 2025, the State Fire Marshal released maps for the Local Responsibility Area Fire Hazard Severity Zones." The report says "The State Fire Marshal map proposes to remove large portions of the Oakland Hills that are currently designated as Very Fire Hazard Severity Zone" and "The City did not agree with the decision by Cal Fire to reduce the land area in Oakland." It also notes that the state map "would restrict the city's Planning and Building Department's ability to prevent larger housing development and other high density type projects from being proposed in this high-risk geographical area." The report recalls that the 1991 firestorm "burned over 1,500 acres, destroyed more than 3,000 homes, caused the deaths of 25 people."
Government Code 51179(b)(1) lets a city add areas "not identified as very high fire hazard severity zones by the State Fire Marshal ... following a finding supported by substantial evidence in the record that the requirements of Section 51182 are necessary for effective fire protection." Section 51179(d) says such changes "shall be final and shall not be rebuttable by the State Fire Marshal." Ordinance No. 13851, passed June 17, 2025 according to the Legistar record, uses that power: "The City hereby designates the Wildfire Prevention Zone, including areas not identified as Very High Fire Hazard Severity Zones by the State Fire Marshall in the February 24, 2025 maps, as Very High Fire Hazard Severity Zones."
What Changes Inside the S-9 Zone
| Rule | Inside S-9 | Outside S-9 |
|---|---|---|
| New Category Two ADU (detached or attached, with a house) | Prohibited | Allowed, 850 or 1,000 sq ft |
| ADU in existing space outside the house envelope | Prohibited | Allowed |
| Interior conversion ADU or junior ADU | One per lot | One of each |
| Detached or attached ADUs with a duplex, fourplex or apartment building | Prohibited | Up to 8 detached with an existing building |
| ADU height | Capped at 16 ft (Table 17.103.02, note 6) | 16 to 20 ft or the zone height |
| Second primary unit on an RH-4 lot of 8,000 sq ft or more | Not allowed | Allowed where streets are paved 26 ft wide |
| S-13 affordable housing bonuses | Not available | Available where mapped |
| New living units inside an existing building | Parking rules apply | No added parking |
| Parking for a house in an RH zone | 1 per bedroom, 2 to 4 spaces | 2 spaces |
| Zoning amnesty for an unpermitted ADU | Not available | Available if occupied before 2021 |
Source: Oakland Planning Code Sections 17.88.050, 17.103.080 (Tables 17.103.01 and 17.103.02), 17.13.050 (Table 17.13.03, Additional Regulation 18), 17.95.050, 17.116.020 and 17.116.060, Supplement 59.
The ADU rules carry one exception. Section 17.88.050.B allows one prohibited ADU type "in lieu of a Category One interior ADU" if "At least one additional off-street parking space is created on the lot for the ADU," with any lost spaces replaced, or if a Reasonable Accommodation request is approved for a disability or a live-in caregiver. HCD has found that the S-9 ADU rules do not comply with state ADU law, and the City kept them by adopting findings in Ordinance No. 13894 on July 21, 2026. The ADU and SB 9 page sets out both sides.
Other limits follow the S-9 line too. Section 17.106.020.E says the frontage exceptions in that section, other than private access easements and lawful old parcels, do not "exempt parcels in the S-9 and S-11 Zones from any street frontage requirement." Small Project Design Review for new living units inside an existing building is available only "on a lot that is not located within the S-9 Fire Safety Protection Combining Zone."
State law has its own fire rule for SB 9. Government Code 65913.4(a)(6)(D), which SB 9 borrows as the section read on September 16, 2021, lists sites "Within a very high fire hazard severity zone, as determined by the Department of Forestry and Fire Protection pursuant to Section 51178," with an exception for "sites that have adopted fire hazard mitigation measures." That text refers to the CAL FIRE determination, while Oakland's S-9 definition adds the City's own map. Ask the Planning Bureau which map it uses for an SB 9 application on a hill lot.
The RH Hillside Zones
Most hill lots are in the RH zones. RH-1 needs lots of one acre, RH-2 25,000 square feet, RH-3 12,000 and RH-4 6,500 or 8,000. RH-1 to RH-3 allow "1 primary dwelling unit per lot." RH-4 allows two units on lots of 8,000 square feet or more, but only where "The project is not located within the S-9 Fire Safety Protection Combining Zone" and "The minimum pavement width along the entire length of the adjoining street is at least twenty-six (26) feet." The RH zones have the lowest heights in the city's residential code: a 25-foot wall and a 30-foot pitched roof on lots with a footprint slope under 20 percent, and rear setbacks of 20 to 35 feet. The parking, setbacks and height page has the steep-lot tables.
Hillside Streets and Hillside Subdivisions
Section 16.16.025 defines a hillside area as land "adjacent to street right-of-way which has an average difference in elevation of more than 15 feet in a horizontal distance of 100 feet." The right-of-way is the full strip of public land for the street, including sidewalks. In hillside areas:
- "Local streets shall not be less than 40 feet in right-of-way width," with pavement of at least 26 feet when lots face both sides and 24 feet when lots face one side.
- "Blind streets shall not be over 600 feet in length unless it includes means of a secondary access," and need 50 feet of right-of-way and 26 feet of pavement.
- Blind streets end in "a circular end having a minimum right-of-way diameter of 80 feet and a minimum pavement diameter of 70 feet," unless a T or Y turnaround is approved.
Chapter 16.28 applies "only where street extensions or new street patterns are to be built on previously unsubdivided land," using the same 15-feet-in-100 test. There, streets other than arterials and collectors need 40 feet of dedicated width, with "paved roadway widths ... not less than thirty (30) feet" when lots face both sides. That figure is wider than the 26 feet in Section 16.16.025. Section 16.28.030 says Sections 16.28.040 to 16.28.070 apply "expressly" to hillside subdivisions and supersede the rest of the title, so 30 feet controls on a new hillside subdivision street.
Hillside subdivision lots facing both sides of a street need "not less than eight thousand (8,000) square feet with an average frontage of not less than eighty (80) feet," and at least 60 feet of width at the front building line. Lots on one side need 6,000 square feet. Lots averaging an acre need 100 feet of average frontage, and before a subdivider files such a map the land must be rezoned to a district "requiring a minimum lot size of twenty-five thousand (25,000) square feet."
Creek Protection Permits
Many hill and flatland lots are crossed by creeks. Section 13.16.120 says "No person shall commit or cause development or work within the boundaries of a creekside property ... unless a creek protection permit has first been obtained from the Chief of Building Services." A creekside property is one "having a creek or riparian corridor crossing the property and/or are contiguous to a creek or riparian corridor." A riparian corridor is the creek and the band of creekside plants along it.
| Category | Where the work is | What you file | Review |
|---|---|---|---|
| Category I | Any indoor work | No extra submittals; follow the City's creek brochure practices | Ministerial |
| Category II | Outdoor work with no earthwork, more than 100 ft from the creek centerline | Simple site plan showing distance to the top of bank | Ministerial |
| Category III | Outdoor work beyond the 20 ft setback but within 100 ft of the centerline, or earthwork beyond the setback | Site plan and creek protection plan; posted notice within 300 ft | Discretionary, subject to CEQA |
| Category IV | Outdoor work from the centerline to 20 ft from the top of bank | Site plan, creek protection plan, hydrology report; posted and mailed notice within 300 ft | Discretionary, subject to CEQA |
Source: Oakland Municipal Code Sections 13.16.130, 13.16.140 and 13.16.180, Supplement 103.
The distances use two terms. The top of bank is "the point at which a line projected from the toe of the bank toward the top of the bank at a slope of two (horizontal) to one (vertical), or twenty-six and one-half (26 ½) degrees from horizontal, intersects surrounding level ground." The creek setback is the larger of the floodway next to the creek or "The area between the top of bank and a point twenty (20) feet further from the watercourse than the top of bank." Notices for Categories III and IV are posted "within a three hundred (300) foot radius" and must go out "ten calendar days before a decision is made."
A permit is granted only if the work "will not (directly or indirectly) adversely affect the creek," will not harm the riparian corridor or its wildlife, will not "degrade the visual quality and natural appearance," and will not endanger property or public safety (Section 13.16.200). The Chief of Building Services may require security "in the form of cash, a certified or cashier's check, performance bond, or an irrevocable letter of credit." An applicant may ask to have the project moved to a lower category by showing it will not harm the creek. The FY 2026-27 Master Fee Schedule adds a "Creek Downgrade" fee of $2,686.40 under Creek Protection Permit, Planning Review.
Earthquake Fault Zones
Chapter 15.20 aims "to mitigate the hazard due to fault rupture by limiting the placement of structures for human occupancy across the trace of active faults." It applies in the "Special Studies Zones," the areas "adopted by the California State Mining and Geology Board pursuant to the Alquist-Priolo Geologic Hazard Zones Act." An active fault is one where "surface displacement has occurred within Holocene time," the most recent period of the earth's history.
Inside those zones the City "requires four copies of geologic report defining and delineating any fault hazard" before approving any new structure for human occupancy, any major addition, or any subdivision that needs a tentative map. For a new building, the exceptions are a house in a development whose geologic report was already approved, and a "single-family wood frame dwelling not exceeding two stories" that is not part of a development of four or more homes and is not within 100 feet of a mapped active fault. If a hazard is found, no building for people may be placed "Across an active fault trace," or "Within fifty (50) feet of any active fault trace unless the geologic investigation can demonstrate that the site is not underlain by active branches of the fault." Any land found unbuildable because of a fault trace must be marked on the tentative map.
Best For
- ✓ Hill lots outside the S-9 zone on streets paved 26 feet wide or more.
- ✓ RH-4 lots of 8,000 sq ft or more that meet both street conditions, for a duplex.
- ✓ Creekside lots where all outdoor work stays more than 100 feet from the creek centerline.
Usually Fails When
- ✕ The lot is in the S-9 zone and the plan needs a new detached ADU without an extra parking space.
- ✕ The building would sit within 50 feet of an active fault trace with no study clearing the site.
- ✕ The work falls within 20 feet of the top of a creek bank and the schedule has no room for a hydrology report.
What To Verify Before Spending Money
- → The S-9 overlay map and the City's Very High Fire Hazard Severity Zone map for the lot.
- → The pavement width of every street between the lot and the nearest arterial.
- → Whether the lot is a creekside property or inside a state Special Studies Zone.
Where to Go Next
Related on VanPlex: the Oakland and Berkeley overview and the property tax and insurance page, which covers fire hazard zones and insurance.
Frequently Asked Questions
How do I know if my Oakland lot is in the S-9 fire zone?
Why does Oakland limit ADUs in the hills?
Did Oakland keep its fire hazard zone after the 2025 state maps?
Can I build a duplex on an RH-4 lot in the Oakland hills?
How wide must a new hillside street be in Oakland?
What is a hillside subdivision in Oakland?
Do I need a creek permit to build near a creek in Oakland?
How is the top of a creek bank measured in Oakland?
Does Oakland require a geologic report for a fourplex near a fault?
Does SB 9 apply in Oakland's fire zone?
Official sources (checked October 2026)
Get new guides by email
New VanPlex guides and articles on multiplex rules, building costs and permits, sent to your inbox.